Gurdaver Singh
- License
- M33399
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M33399 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Guttmann & Blaevoet Eng.
- On San Francisco permits
- Apr 2015 to Feb 2018
8 permits since 2000 (engineer on 8 permits): 8 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Turner Construction Co (4), Roebbelen Contracting Inc (2), Paradigm General Contractors, Swinerton Builders
- Architects
- Michelle Jones (6), Arba Stinnett
- Engineers
- Christopher Lloyd (2), David Johnson (2), Victor Steffen (2), Aaron Strauch
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 8
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 12, 2018 | Completed final sign-off Mar 2019 | 2180 Harrison St | Turner Construction Co | 2nd floor - restroom refresh - flooring, wall & ceiling finishes. ada upgrade to restrooms. maher naDetails
2nd floor - restroom refresh - flooring, wall & ceiling finishes. ada upgrade to restrooms. maher na | $200,000 |
| Feb 12, 2018 | Completed final sign-off Mar 2019 | 2180 Harrison St | Turner Construction Co | 3rd floor - restroom refresh - flooring, wall & ceiling finishes. ada upgrade to restrooms. maher naDetails
3rd floor - restroom refresh - flooring, wall & ceiling finishes. ada upgrade to restrooms. maher na | $200,000 |
| Sep 15, 2017 | Completed final sign-off Oct 2018 | 2180 Harrison St | Turner Construction Co | t.i.: work includes but is not limited to (n) flooring and furniture systesm, accessibility upgrades for restrooms and parking lot for code compliance. plumbing, mechanical and electrical work. no mods to the fire protection system in anticipated.Details
t.i.: work includes but is not limited to (n) flooring and furniture systesm, accessibility upgrades for restrooms and parking lot for code compliance. plumbing, mechanical and electrical work. no mods to the fire protection system in anticipated. | $250,000 |
| Jul 18, 2017 | Completed final sign-off Apr 2018 | 2270 Folsom St | Turner Construction Co | 2nd fl - office ti construct new partitions, ceiling, flooring and associated mep work. n/a maherDetails
2nd fl - office ti construct new partitions, ceiling, flooring and associated mep work. n/a maher | $333,600 |
| Dec 19, 2016 | Completed final sign-off Feb 2021 | 77 Beale St | Roebbelen Contracting Inc | 10th floor - office t.i. , structural, mep for full floor to prepare for future tenant. n/a maher ordinanceDetails
10th floor - office t.i. , structural, mep for full floor to prepare for future tenant. n/a maher ordinance | $2,000,000 |
| Dec 19, 2016 | Completed final sign-off Feb 2021 | 77 Beale St | Roebbelen Contracting Inc | 9th floor - office t.i. , structural, mep for full floor to prepare for future tenant. n/a maher ordinanceDetails
9th floor - office t.i. , structural, mep for full floor to prepare for future tenant. n/a maher ordinance | $2,000,000 |
| Jul 19, 2016 | Completed final sign-off Jul 2017 | 77 Beale St | Swinerton Builders | 3rd fl: tenant improvement of (e) offices & storage, to convert into medical offices, fitness area, and conference room for pg&e employees. life safety deferred. n/a ordinance #155-13Details
3rd fl: tenant improvement of (e) offices & storage, to convert into medical offices, fitness area, and conference room for pg&e employees. life safety deferred. n/a ordinance #155-13 | $1,280,000 |
| Apr 10, 2015 | Completed final sign-off Dec 2015 | 215 Market St | Paradigm General Contractors | mep drawings for pa# 201409176520, hvac and electrical work only. n/a ordinance #155-13Details
mep drawings for pa# 201409176520, hvac and electrical work only. n/a ordinance #155-13 | $80,000 |