Block 3573, lot 027
3100 18th St
- City’s use
- Commercial Retail
- Stories
- 1
- Lot
- 5,390 sq ft
- Zoning
- M1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
34 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 31, 2022 | Never finaled issued Jun 2023, no final | 3100 18th St | Nani Heating & Air Conditioning | provide new type i & type ii exhaust systems. install new rooftop package unit and split system heat pump. install new outdoor air fan and makeup air system. ref arch pa# 202206297382.Details
provide new type i & type ii exhaust systems. install new rooftop package unit and split system heat pump. install new outdoor air fan and makeup air system. ref arch pa# 202206297382. | |
| Jun 29, 2022 | Never finaled issued Aug 2022, no final | 3100 18th St | Roman Hunt | interior remodel: interior partitions, accessible bath. repair existing windows, replace skylights, roof repair, repair less than 50% existing exterior stair in kind, new finishes.Details
interior remodel: interior partitions, accessible bath. repair existing windows, replace skylights, roof repair, repair less than 50% existing exterior stair in kind, new finishes. | $250,000 |
| Nov 30, 2020 | Expired or cancelled cancelled Jan 2026 | 3100 18th St | ti of existing restaurant including mirror reconfiguration of existing dish wash area: new dishwasher, 3-com sink, food prep sink, mop sink 7 2 floor sinks. replacement & relocation of rooftop gas hot water heater to g/f. no change to existing cooking, food prep, drink prep, or seating area.Details
ti of existing restaurant including mirror reconfiguration of existing dish wash area: new dishwasher, 3-com sink, food prep sink, mop sink 7 2 floor sinks. replacement & relocation of rooftop gas hot water heater to g/f. no change to existing cooking, food prep, drink prep, or seating area. | $25,000 | |
| Mar 29, 2018 | Completed final sign-off Apr 2018 | 2180 Harrison St | Ingram Fire Protection Inc | 1/f: relocate (3) spinkler heads and demo (1) sprinkler head. bldg pa #201801310049. maher naDetails
1/f: relocate (3) spinkler heads and demo (1) sprinkler head. bldg pa #201801310049. maher na | $5,000 |
| Feb 12, 2018 | Completed final sign-off Mar 2019 | 2180 Harrison St | Turner Construction Co | 3rd floor - restroom refresh - flooring, wall & ceiling finishes. ada upgrade to restrooms. maher naDetails
3rd floor - restroom refresh - flooring, wall & ceiling finishes. ada upgrade to restrooms. maher na | $200,000 |
| Feb 12, 2018 | Completed final sign-off Mar 2019 | 2180 Harrison St | Turner Construction Co | 2nd floor - restroom refresh - flooring, wall & ceiling finishes. ada upgrade to restrooms. maher naDetails
2nd floor - restroom refresh - flooring, wall & ceiling finishes. ada upgrade to restrooms. maher na | $200,000 |
| Jan 31, 2018 | Completed final sign-off Sep 2018 | 2180 Harrison St | Turner Construction Co | revision to app#201709158496. t.i. to include changes to finishes at restrooms. new sink and floor drains including mep's. ref app#201709158496. n/a for maherDetails
revision to app#201709158496. t.i. to include changes to finishes at restrooms. new sink and floor drains including mep's. ref app#201709158496. n/a for maher | $65,000 |
| Dec 15, 2017 | Completed final sign-off Apr 2019 | 2180 Harrison St | Turner Construction Co | site securtiy upgrades, replace fence, replace vehicle & personnel access gate & hardware, like-for-like. maher naDetails
site securtiy upgrades, replace fence, replace vehicle & personnel access gate & hardware, like-for-like. maher na | $150,000 |
| Sep 15, 2017 | Completed final sign-off Oct 2018 | 2180 Harrison St | Turner Construction Co | t.i.: work includes but is not limited to (n) flooring and furniture systesm, accessibility upgrades for restrooms and parking lot for code compliance. plumbing, mechanical and electrical work. no mods to the fire protection system in anticipated.Details
t.i.: work includes but is not limited to (n) flooring and furniture systesm, accessibility upgrades for restrooms and parking lot for code compliance. plumbing, mechanical and electrical work. no mods to the fire protection system in anticipated. | $250,000 |
| Aug 2, 2017 | Completed final sign-off Oct 2017 | 2180 Harrison St | Cosco Fire Protection Inc. | add 5 mini monitor modules to the fire alarm system to monitor the new generator. reference permit # 201604064052 for architectural dwg. n/a maherDetails
add 5 mini monitor modules to the fire alarm system to monitor the new generator. reference permit # 201604064052 for architectural dwg. n/a maher | $9,600 |
| Apr 6, 2016 | Completed final sign-off Apr 2018 | 2180 Harrison St | Skyline Construction | demo e diesel generator, underslab raceways and conductors. replace with new generator with larger tank (660 gal) and free standing 400kw load bank, new raceways and conductors to new load bank e main switchboard and e automatic switches. no change to existing epssDetails
demo e diesel generator, underslab raceways and conductors. replace with new generator with larger tank (660 gal) and free standing 400kw load bank, new raceways and conductors to new load bank e main switchboard and e automatic switches. no change to existing epss | $160,000 |
| Mar 16, 2016 | Completed final sign-off Mar 2018 | 2180 Harrison St | H & M Fire Protection, Inc. | relocate 2 fire sprinklers at 2nd floor office, ref. arch. 201601288211; maher n/aDetails
relocate 2 fire sprinklers at 2nd floor office, ref. arch. 201601288211; maher n/a | $400 |
| Mar 10, 2016 | Completed final sign-off Apr 2018 | 2180 Harrison St | Skyline Construction | t.i. mechanical, minor relocation of grill locations, relocate one sensor (temp), final air balance. electrical, demo (e) electrical equipment, install new ups units, new electrical equipment, new lighting/control, new branch circuiting. 2/f t.i.pa#201601288211 n/a ordinance #155-13Details
t.i. mechanical, minor relocation of grill locations, relocate one sensor (temp), final air balance. electrical, demo (e) electrical equipment, install new ups units, new electrical equipment, new lighting/control, new branch circuiting. 2/f t.i.pa#201601288211 n/a ordinance #155-13 | $75,000 |
| Jan 28, 2016 | Completed final sign-off Apr 2018 | 2180 Harrison St | Skyline Construction | 2nd flr: t.i. remove (e) non-structural partitions, construct new gyp board, partitions as shown on plan, modify existing acoustical ceiling,separate permit sprinkler, life safety, mechanical & electrical; maher n/aDetails
2nd flr: t.i. remove (e) non-structural partitions, construct new gyp board, partitions as shown on plan, modify existing acoustical ceiling,separate permit sprinkler, life safety, mechanical & electrical; maher n/a | $95,000 |
| Sep 15, 2015 | Expired or cancelled cancelled Jan 2026 | 2180 Harrison St | Skyline Construction | remove (e) non-structural partitions new gyp board partitions. new electrical and mechnical workDetails
remove (e) non-structural partitions new gyp board partitions. new electrical and mechnical work | $120,000 |
| Dec 23, 2014 | Expired or cancelled cancelled Aug 2016 | 2180 Harrison St | Paradigm General Contractors | voluntary barrier removal to facilities accessed by general public - accessible parking, curb ramp in private parking lot, reception counter, toilet rooms on floors 1,2 and 3, and signage. maher n/a.Details
voluntary barrier removal to facilities accessed by general public - accessible parking, curb ramp in private parking lot, reception counter, toilet rooms on floors 1,2 and 3, and signage. maher n/a. | $30,000 |
| Sep 9, 2014 | Never finaled issued Sep 2014, no final | 2180 Harrison St | D'man-Burly Systems Inc. | install relays for connection of new fsds per mechanical app pm20140822477Details
install relays for connection of new fsds per mechanical app pm20140822477 | $8,600 |
| Aug 22, 2014 | Completed final sign-off Oct 2014 | 2180 Harrison St | Matrix Hg Inc | install one new split air conditioning system. new fire and smoke dampers at elevator machine room walls. maher n/a.Details
install one new split air conditioning system. new fire and smoke dampers at elevator machine room walls. maher n/a. | $15,000 |
| Aug 21, 2014 | Expired or cancelled cancelled Sep 2023 | 2180 Harrison St | D'man-Burly Systems Inc. | install relays for connection of new fsd's to facp. program panel as shown in operational matrix. n/a for the maher ordinance #155-13Details
install relays for connection of new fsd's to facp. program panel as shown in operational matrix. n/a for the maher ordinance #155-13 | $8,600 |
| Oct 2, 2013 | Completed final sign-off Feb 2014 | 2180 Harrison St | D'man-Burly Systems Inc. | voluntery like for like fire alarm system replacement per csfm bulletin dated 9/4/08. no existing plan or ul certified system documentation exisits. fire alarm sound to be heard throughout building----Details
voluntery like for like fire alarm system replacement per csfm bulletin dated 9/4/08. no existing plan or ul certified system documentation exisits. fire alarm sound to be heard throughout building---- | $22,773 |
| Aug 21, 2013 | Completed final sign-off Mar 2014 | 2180 Harrison St | Matrix Hg Inc | remove/replace package a/c units (2) in kind. remove/replace 2 boilers & reconfigure heating hot water piping. nothing will be visable from street.Details
remove/replace package a/c units (2) in kind. remove/replace 2 boilers & reconfigure heating hot water piping. nothing will be visable from street. | $150,000 |
| Jun 14, 2013 | Completed final sign-off Jul 2013 | 2180 Harrison St | Paradigm General Contractors | office t.i. involving demo only. remove 10 lf of drywall partiton. remove door and frame. non structural partitonDetails
office t.i. involving demo only. remove 10 lf of drywall partiton. remove door and frame. non structural partiton | $1,500 |
| Apr 5, 2013 | Expired or cancelled withdrawn Jun 2013 | 2180 Harrison St | Paradigm General Contractors | 3rd floor - t.i. remove existing non-structural partition, door & door frame as shown on plan.Details
3rd floor - t.i. remove existing non-structural partition, door & door frame as shown on plan. | $1,500 |
| Oct 11, 2012 | Expired or cancelled cancelled Jan 2026 | 2180 Harrison St | C B 2 Builders Incorporated | t.i wk includes atl. 2 office rms one (e) divided into 2 spaces with a new partition one existing office will be expanded into an (e) meeting room w/ office dr relocated. existing building system includes power lght, hvac + enviremental control fire sprinklers are modified to accomidate new layout.Details
t.i wk includes atl. 2 office rms one (e) divided into 2 spaces with a new partition one existing office will be expanded into an (e) meeting room w/ office dr relocated. existing building system includes power lght, hvac + enviremental control fire sprinklers are modified to accomidate new layout. | $10,000 |
| Dec 6, 2011 | Never finaled issued Dec 2011, no final | 2180 Harrison St | street space & sidewalk permit.Details
street space & sidewalk permit. | ||
| Dec 16, 2009 | Completed final sign-off Oct 2010 | 3100 18th St | Angotti & Reilly Inc. | comply with fire department notice of violation provide second means of egress. partial disabled upgrade at entry. final previously completed work for appl. 9725449 which expired. otain occupant load verification. documentation of work related to 9725449 for partition and windows at dining rm #2.Details
comply with fire department notice of violation provide second means of egress. partial disabled upgrade at entry. final previously completed work for appl. 9725449 which expired. otain occupant load verification. documentation of work related to 9725449 for partition and windows at dining rm #2. | $5,650 |
| Jun 26, 2007 | Completed final sign-off Jul 2007 | 2180 Harrison St | Golden Gate Sign Company Inc. | renew 200612200227 for final inspection.Details
renew 200612200227 for final inspection. | |
| Jan 25, 2007 | Expired or cancelled withdrawn Feb 2007 | 2180 Harrison St | Premier Power Renewable Energy | erect solar carport structure and install its roof 216 photovoltaic modules including all elec equipement, conduit and wiring to complete this grid tied photovaltaic system. solor system will supply power to exist operations building on this site. attached to e buildingDetails
erect solar carport structure and install its roof 216 photovoltaic modules including all elec equipement, conduit and wiring to complete this grid tied photovaltaic system. solor system will supply power to exist operations building on this site. attached to e building | $89,860 |
| Jan 22, 2007 | Completed final sign-off Aug 2007 | 2180 Harrison St | Premier Power Renewable Energy | isnatallation of 234 photovoltiaic (pv) modules on the roof, 80 pv mofdules on the upper facade, 72 pv modules oj the lower facade. including 911 electrical equipment, conduit & wiringDetails
isnatallation of 234 photovoltiaic (pv) modules on the roof, 80 pv mofdules on the upper facade, 72 pv modules oj the lower facade. including 911 electrical equipment, conduit & wiring | $160,580 |
| Dec 20, 2006 | Expired or cancelled expired Jul 2007 | 2180 Harrison St | Golden Gate Sign Company Inc. | erect:electric, wall, single faced replacement sign.Details
erect:electric, wall, single faced replacement sign. | |
| Feb 8, 2006 | Completed final sign-off Aug 2006 | 2180 Harrison St | compressed natural gas fueling station, as built drawings, resubmitted with revision prior to final inspection. elimination of 11 hpa of group a dispenser. revision to appl#200310248492Details
compressed natural gas fueling station, as built drawings, resubmitted with revision prior to final inspection. elimination of 11 hpa of group a dispenser. revision to appl#200310248492 | ||
| Jun 23, 2005 | Completed final sign-off Aug 2006 | 2180 Harrison St | renew appl#200310248492 for final inspection onlyDetails
renew appl#200310248492 for final inspection only | ||
| Oct 24, 2003 | Completed final sign-off Aug 2006 | 2180 Harrison St | install (cng) compressed natural gas, slow-fill fueling,dispensers,piping,electrical wiring,signagesDetails
install (cng) compressed natural gas, slow-fill fueling,dispensers,piping,electrical wiring,signages | $300,000 | |
| Oct 11, 2002 | Never finaled issued Oct 2002, no final | 2180 Harrison St | R L H Fire Protection Inc | replacement of omega sprinkler heads in ind with viking microfast model m-total 496 heads.Details
replacement of omega sprinkler heads in ind with viking microfast model m-total 496 heads. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Turner Construction Co (5), Skyline Construction (4), D'man-Burly Systems Inc. (3), Paradigm General Contractors (3), Golden Gate Sign Company Inc. (2), Matrix Hg Inc (2), Premier Power Renewable Energy (2), Angotti & Reilly Inc., C B 2 Builders Incorporated, Cosco Fire Protection Inc., H & M Fire Protection, Inc., Ingram Fire Protection Inc, Nani Heating & Air Conditioning, R L H Fire Protection Inc, Roman Hunt
- Architects
- Michelle Jones (4), William Walters (3), Joseph Mendoza, Nick Palter, Seth Boor
- Engineers
- Gurdaver Singh (3), Victor Steffen (2), Dorel Anghel, John S. Allen, Matthew Pagendarm, Meng Hsiu Chen, Mike Hom, Pius Kao, Vic Yap
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.