Roman Hunt
- Based in
- San Francisco
- On San Francisco permits
- Oct 2011 to Sep 2026
- Last 24 months
- 6 permits filed
51 permits since 2000: 26 completed, 8 in progress, 14 never finaled, 3 expired or cancelled.
Of the 14 never-finaled permits, 2 are 3 to 5 years old, 8 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 3, 2026 | In progress filed Sep 2026, not yet issued | 460 Larkin St | changing decorative light fixtures to existing resturant. revision to pa# 2026-0515-1372.Details
changing decorative light fixtures to existing resturant. revision to pa# 2026-0515-1372. | $13,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 1400 Lombard St | to comply with number 202658446 to replace (e) countertop to be in kindDetails
to comply with number 202658446 to replace (e) countertop to be in kind | $500 |
| May 15, 2026 | In progress issued Jun 2026 | 460 Larkin St | existing restaurant remodel: change kitchen hood and add ada compliant restroom. electrical deferred. electrical work requires plans reviewed under a separate building permit.Details
existing restaurant remodel: change kitchen hood and add ada compliant restroom. electrical deferred. electrical work requires plans reviewed under a separate building permit. | $117,000 |
| May 7, 2026 | In progress issued Jun 2026 | 425 Hayes St | to comply with nov 202656333-ti, demo (e) + (n) partitions, fixtures, millwork, finishes. (signage deferred to later permit)Details
to comply with nov 202656333-ti, demo (e) + (n) partitions, fixtures, millwork, finishes. (signage deferred to later permit) | $400,000 |
| Sep 17, 2025 | Completed final sign-off Jun 2026 | 1511 Haight St | renovation of an existing music venue out of operation for several years. owners proposing barrier remediation with enlarged restroom, new finishes, and lighting throughout public area. new sound baffling to replace existing, reuse existing storerront doors. replace non functional power door operatoDetails
renovation of an existing music venue out of operation for several years. owners proposing barrier remediation with enlarged restroom, new finishes, and lighting throughout public area. new sound baffling to replace existing, reuse existing storerront doors. replace non functional power door operato | $150,000 |
| Jul 23, 2025 | In progress issued Jul 2025 | 221 San Jose Av | unit2: -replace kitchen cabinets replace bathroom tile, refinish floor skim coat walls and paintDetails
unit2: -replace kitchen cabinets replace bathroom tile, refinish floor skim coat walls and paint | $25,000 |
| Jun 11, 2024 | Completed final sign-off Nov 2025 | 434 Shotwell St | rev 202206307486-change of location of production equipment and associated utilities and ducting. change layout of cafe equipment. work includes mech and plumbing work. no change to use or occupancy or egress.Details
rev 202206307486-change of location of production equipment and associated utilities and ducting. change layout of cafe equipment. work includes mech and plumbing work. no change to use or occupancy or egress. | $120,000 |
| May 16, 2024 | In progress issued May 2024 | 221 San Jose Av | to obtain final inspection for work approved under pa#:2018.0220.1682 and 201904037057 all work is complete.Details
to obtain final inspection for work approved under pa#:2018.0220.1682 and 201904037057 all work is complete. | |
| May 16, 2024 | In progress issued May 2024 | 221 San Jose Av | to obtain final inspection for work approved under pa#:2018.0522.9778 and 2019.0712.5803. all work is complete.Details
to obtain final inspection for work approved under pa#:2018.0522.9778 and 2019.0712.5803. all work is complete. | |
| May 19, 2023 | In progress issued Jul 2024 | 221 San Jose Av | to comply with complaint 202200247 new rear yard fence and gates at poplar street 6ft fenceDetails
to comply with complaint 202200247 new rear yard fence and gates at poplar street 6ft fence | $1,000 |
| Mar 27, 2023 | Completed final sign-off Feb 2024 | 891 Bush St | mep permit. replace (e) lights & relocate; same with electric receptacles per new seating layout & equipments; new supply air from existing equipment; additional exhaust. ref pa 2022-0922-2957. no exterior to the store front pe this review. exhaust fan in bathroom. no work in barDetails
mep permit. replace (e) lights & relocate; same with electric receptacles per new seating layout & equipments; new supply air from existing equipment; additional exhaust. ref pa 2022-0922-2957. no exterior to the store front pe this review. exhaust fan in bathroom. no work in bar | |
| Feb 17, 2023 | Completed final sign-off Feb 2024 | 891 Bush St | alteration at accessible path under permit rev. to 202209222957Details
alteration at accessible path under permit rev. to 202209222957 | |
| Jan 27, 2023 | Completed final sign-off Feb 2024 | 891 Bush St | alteration to issued permit#2022-0922-2957 to revise bathroom layout.Details
alteration to issued permit#2022-0922-2957 to revise bathroom layout. | |
| Jan 23, 2023 | Completed final sign-off May 2024 | 221 San Jose Av | recommencement and completion of work approved under pa# 2018--0214-1300.Details
recommencement and completion of work approved under pa# 2018--0214-1300. | |
| Nov 29, 2022 | Completed final sign-off Feb 2024 | 891 Bush St | replace store front. front wall w/ glass, aluminum framing w/ new door. rev. to 202209222957Details
replace store front. front wall w/ glass, aluminum framing w/ new door. rev. to 202209222957 | $10,000 |
| Sep 22, 2022 | Completed final sign-off Feb 2024 | 891 Bush St | expansion of existing bar into vacant next door space (891 bush), scope of work includes new bar, finishes, furnishings and ada bathroom. mep deferredDetails
expansion of existing bar into vacant next door space (891 bush), scope of work includes new bar, finishes, furnishings and ada bathroom. mep deferred | $100,000 |
| Jun 30, 2022 | Completed final sign-off Nov 2025 | 434 Shotwell St | interior remodel of existing production space to support wholesale coffee roaster and retail cafe. replace existing roll-up door, create internal patio for existing build rated exit corridor. rebuild restrooms, lighting, and finishes.Details
interior remodel of existing production space to support wholesale coffee roaster and retail cafe. replace existing roll-up door, create internal patio for existing build rated exit corridor. rebuild restrooms, lighting, and finishes. | $350,000 |
| Jun 29, 2022 | Never finaled issued Aug 2022, no final | 3100 18th St | interior remodel: interior partitions, accessible bath. repair existing windows, replace skylights, roof repair, repair less than 50% existing exterior stair in kind, new finishes.Details
interior remodel: interior partitions, accessible bath. repair existing windows, replace skylights, roof repair, repair less than 50% existing exterior stair in kind, new finishes. | $250,000 |
| May 25, 2021 | Expired or cancelled cancelled Jan 2026 | 72 Stanyan St | add rear deck at 2nd floor and stair to rear yard. install new door in existing openingDetails
add rear deck at 2nd floor and stair to rear yard. install new door in existing opening | $10,000 |
| May 4, 2021 | Completed final sign-off Nov 2021 | 550 Sutter St | change of use from retail service to bar: new bar & prep area. new plumbing at areas. no structural. no ada. no mechanical. no major electrical. maher n/a.Details
change of use from retail service to bar: new bar & prep area. new plumbing at areas. no structural. no ada. no mechanical. no major electrical. maher n/a. | $20,000 |
| Jul 12, 2019 | Never finaled issued Aug 2020, no final | 221 San Jose Av | revision to 201904037057 per pg&e reqs. minor street encroachment for new gas riser and regulators, new door brwn ele & gas meters, new gated door to ext for ventilationDetails
revision to 201904037057 per pg&e reqs. minor street encroachment for new gas riser and regulators, new door brwn ele & gas meters, new gated door to ext for ventilation | |
| Apr 3, 2019 | Never finaled issued Apr 2019, no final | 221 San Jose Av | rev to pa# 201805229778 & 201802201682; relocation of laundry & tenant storage, slight reduction of front adu to accomodate the (n) 1 hr rated gas cabinet for (e) & (n) meters on first floor.Details
rev to pa# 201805229778 & 201802201682; relocation of laundry & tenant storage, slight reduction of front adu to accomodate the (n) 1 hr rated gas cabinet for (e) & (n) meters on first floor. | |
| Feb 8, 2019 | Never finaled issued Feb 2019, no final | 584 Valencia St | removal of a section of window frosting to come into compliance with city codes.Details
removal of a section of window frosting to come into compliance with city codes. | $600 |
| Jul 13, 2018 | Never finaled issued Apr 2022, no final | 72 Stanyan St | adding deck for 2nd floor less than 8 feet wide. replace window to patio door.Details
adding deck for 2nd floor less than 8 feet wide. replace window to patio door. | $10,000 |
| May 22, 2018 | Never finaled issued Apr 2019, no final | 221 San Jose Av | per ordinance# 162-16, creat (1) adu @ 1st level within (e) bldg envelope by removing (1) parking spot. add bicycle parking @ storage work conrrespongs w/ soft story permit # 2018/0214/1300. pa# 2018/0220/1682 for (2) rear adu units which need a variance.Details
per ordinance# 162-16, creat (1) adu @ 1st level within (e) bldg envelope by removing (1) parking spot. add bicycle parking @ storage work conrrespongs w/ soft story permit # 2018/0214/1300. pa# 2018/0220/1682 for (2) rear adu units which need a variance. | $50,000 |
| Mar 20, 2018 | Never finaled issued Mar 2018, no final | 2417 Mission St | install 1 electric sign "docs clock"Details
install 1 electric sign "docs clock" | $5,000 |
| Feb 27, 2018 | Never finaled issued Oct 2018, no final | 584 Valencia St | revision to 201711174272 lighting submittal for t-24Details
revision to 201711174272 lighting submittal for t-24 | $5,000 |
| Feb 20, 2018 | Never finaled issued Apr 2019, no final | 221 San Jose Av | add units per rd 162-16. create 2 (n) adu units on 1st flr within existing building envelope. work corresponds with soft story permit# 201802141300.Details
add units per rd 162-16. create 2 (n) adu units on 1st flr within existing building envelope. work corresponds with soft story permit# 201802141300. | $150,000 |
| Feb 14, 2018 | Expired or cancelled expired May 2024 | 221 San Jose Av | soft story upgrade of 1st fl per ab 106, 107, chapter 4d of sfbc 2016 and chapter 34 of cbc 2016Details
soft story upgrade of 1st fl per ab 106, 107, chapter 4d of sfbc 2016 and chapter 34 of cbc 2016 | $55,000 |
| Dec 11, 2017 | Completed final sign-off Apr 2019 | 1006 Page St | remodel kitchen, add 1/2 bath & bath, install one replacement window and one new window, add one bedroom.Details
remodel kitchen, add 1/2 bath & bath, install one replacement window and one new window, add one bedroom. | $90,000 |
| Nov 17, 2017 | Completed final sign-off Oct 2018 | 584 Valencia St | work only on #584 valencia. interior remodel of existing a-2 restaurant (ref pa 201108031608). changing finishes in public areas and addition of service well in mezzanine and alteration of (e) non-compliant bar. mep under separate prmit.Details
work only on #584 valencia. interior remodel of existing a-2 restaurant (ref pa 201108031608). changing finishes in public areas and addition of service well in mezzanine and alteration of (e) non-compliant bar. mep under separate prmit. | $90,000 |
| Sep 13, 2017 | Never finaled issued Sep 2017, no final | 1074 Dolores St | to obtain final inspection for work approved under pa # 201211013252. all work is completeDetails
to obtain final inspection for work approved under pa # 201211013252. all work is complete | |
| Jul 31, 2017 | Completed final sign-off Dec 2017 | 280 14th St | bathroom construction in extg permitted space. ref app#201602290740 n/a for maherDetails
bathroom construction in extg permitted space. ref app#201602290740 n/a for maher | $17,000 |
| Apr 5, 2017 | Completed final sign-off Sep 2017 | 3267 20th St | revision to app#201602179780. new spiral staircase on 1st floor. reduced ceiling hgt on ground floor. add door between powder room and music room. remove work proposed on 3rd floor.Details
revision to app#201602179780. new spiral staircase on 1st floor. reduced ceiling hgt on ground floor. add door between powder room and music room. remove work proposed on 3rd floor. | |
| Jan 10, 2017 | Completed final sign-off Dec 2017 | 2417 Mission St | tenant improvement of extg ground floor space into a full bar. scope of work to include new interior partitions, new accessible restrooms, new bar equipment and new finishes.Details
tenant improvement of extg ground floor space into a full bar. scope of work to include new interior partitions, new accessible restrooms, new bar equipment and new finishes. | $170,000 |
| May 23, 2016 | Never finaled issued Aug 2016, no final | 1810 Van Ness Av | 1st floor: remodel (e) vacant tenant space to fitness gym space. work included - new exercise equipment, lighting, office and changing roomDetails
1st floor: remodel (e) vacant tenant space to fitness gym space. work included - new exercise equipment, lighting, office and changing room | $8,000 |
| Feb 17, 2016 | Completed final sign-off Sep 2017 | 3267 20th St | interior renovation of (e) single family residence. remove (e) slab & excavate for (n) foundation, convert 1 car garage to 3 car garage, convert rear 1/f from non habitable to habitable space, replace (e) interior stair from 1/f to 2/f, add (n) powder room on 2/f, (n) bath on 3/fDetails
interior renovation of (e) single family residence. remove (e) slab & excavate for (n) foundation, convert 1 car garage to 3 car garage, convert rear 1/f from non habitable to habitable space, replace (e) interior stair from 1/f to 2/f, add (n) powder room on 2/f, (n) bath on 3/f | $186,000 |
| Dec 21, 2015 | Never finaled issued Dec 2015, no final | 1076 Dolores St | replace laten plaster with sheet rock & trimDetails
replace laten plaster with sheet rock & trim | $5,000 |
| Aug 11, 2015 | Completed final sign-off Dec 2015 | 532 Jessie St | to comply with n.o.v. #2015586118. install hood,oven, 3 compartment sink and other kitchen equipment and finishes.convert 2 non-ada to one ada bathroom. separate garage from kitchen area with non-bearing wall.Details
to comply with n.o.v. #2015586118. install hood,oven, 3 compartment sink and other kitchen equipment and finishes.convert 2 non-ada to one ada bathroom. separate garage from kitchen area with non-bearing wall. | $125,000 |
| Aug 10, 2015 | Never finaled issued Apr 2016, no final | 40 Temescal Tr | horizontal extension. remove & infill (e) court on 2/fl. horizontal expansion 3/fl: (n) roofdeck above 2/fl. remove & infill (e) fireplace & chimney. remodel 1, remove 1, & relocate 1 interior stairs. remodel kitchen & bathrooms.Details
horizontal extension. remove & infill (e) court on 2/fl. horizontal expansion 3/fl: (n) roofdeck above 2/fl. remove & infill (e) fireplace & chimney. remodel 1, remove 1, & relocate 1 interior stairs. remodel kitchen & bathrooms. | $350,000 |
| Jan 26, 2015 | Completed final sign-off Jul 2015 | 531 Jackson St | revision to permit 201411030482; to separate storefront work and collect planning fees: replace existing entry doors & window @ existing facade entry opening with new glass storefront (no change to existing facade entry opening or structure) maher n/aDetails
revision to permit 201411030482; to separate storefront work and collect planning fees: replace existing entry doors & window @ existing facade entry opening with new glass storefront (no change to existing facade entry opening or structure) maher n/a | $10,000 |
| Jan 20, 2015 | Completed final sign-off Aug 2015 | 531 Jackson St | new exhaust hood (replace existing hood) at restaurant kitchen, revision to permit 201411030482; maher n/aDetails
new exhaust hood (replace existing hood) at restaurant kitchen, revision to permit 201411030482; maher n/a | $15,000 |
| Nov 3, 2014 | Completed final sign-off Aug 2015 | 531 Jackson St | tenant improvement of existing ground floor restaurant; maher n/aDetails
tenant improvement of existing ground floor restaurant; maher n/a | $200,000 |
| May 6, 2014 | Completed final sign-off Sep 2014 | 2346 Chestnut St | revision to pa# 201312174392, details on kitchen equipment and sinks. n/a ordinance #155-13Details
revision to pa# 201312174392, details on kitchen equipment and sinks. n/a ordinance #155-13 | $7,000 |
| May 5, 2014 | Completed final sign-off Sep 2014 | 2346 Chestnut St | revision to permit #201312174392. adding wireless door openers to front entry and bathroom renovation. no change of front elevation.Details
revision to permit #201312174392. adding wireless door openers to front entry and bathroom renovation. no change of front elevation. | $18,000 |
| Dec 17, 2013 | Completed final sign-off Sep 2014 | 2346 Chestnut St | remodel (e) restaurant, finishes, built in casework, new bar counter with sink. no change of use. no work in a-3.Details
remodel (e) restaurant, finishes, built in casework, new bar counter with sink. no change of use. no work in a-3. | $25,000 |
| Nov 1, 2012 | Never finaled issued Oct 2013, no final | 1074 Dolores St | remodel/addition of a single family dwelling in a 2-unit condo. remodel of 2nd fl bedrm, kitchen, living rm, family rm & bath. addition of (n) interior stair conversion of 3rd fl (attic) to (n) master bedrm w/ new closet & (n) bath. addition of (n) deck on (e) roof.Details
remodel/addition of a single family dwelling in a 2-unit condo. remodel of 2nd fl bedrm, kitchen, living rm, family rm & bath. addition of (n) interior stair conversion of 3rd fl (attic) to (n) master bedrm w/ new closet & (n) bath. addition of (n) deck on (e) roof. | $210,000 |
| Oct 1, 2012 | Expired or cancelled expired Apr 2022 | 4001 Judah St | t.i. permit to expand existing restaurant @4001 judah st into adjacent space @4005 judah st. work to incl interior remodel, expansion of eating area & service&prep areas. area of expansion approx 980 sf.sep plumbing, elec permits will be applied for as required.Details
t.i. permit to expand existing restaurant @4001 judah st into adjacent space @4005 judah st. work to incl interior remodel, expansion of eating area & service&prep areas. area of expansion approx 980 sf.sep plumbing, elec permits will be applied for as required. | $125,000 |
| May 23, 2012 | Completed final sign-off Jun 2013 | 2599 San Bruno Av | install plumbing, electrical as required to support mobile food cart. non structural partitions, clean-up, paint & finishesDetails
install plumbing, electrical as required to support mobile food cart. non structural partitions, clean-up, paint & finishes | $8,000 |
| Nov 4, 2011 | Completed final sign-off Nov 2011 | 2414 Webster St | replace treads & risers to front entry way, less then 50% of structure. replacement in kind.Details
replace treads & risers to front entry way, less then 50% of structure. replacement in kind. | $4,500 |
| Oct 26, 2011 | Completed final sign-off Jul 2012 | 774 21st Av | kitchen updated. new cabinets installed, no changes to existing floor plan. work @ upper unit only.Details
kitchen updated. new cabinets installed, no changes to existing floor plan. work @ upper unit only. | $10,000 |