Back to bathroom remodel contractors
Roman Hunt
- Based in
- San Francisco
- On San Francisco permits
- Oct 2011 to Sep 2026
- Last 24 months
- 6 permits filed
51 permits since 2000: 26 completed, 8 in progress, 14 never finaled, 3 expired or cancelled.
Of the 14 never-finaled permits, 2 are 3 to 5 years old, 8 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 8 completed, 1 in progress, 3 never finaled. Typically 30 days from filing to permit and 326 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 23, 2025 | In progress issued Jul 2025 | 221 San Jose Av | unit2: -replace kitchen cabinets replace bathroom tile, refinish floor skim coat walls and paintDetails
unit2: -replace kitchen cabinets replace bathroom tile, refinish floor skim coat walls and paint | $25,000 |
| Mar 27, 2023 | Completed final sign-off Feb 2024 | 891 Bush St | mep permit. replace (e) lights & relocate; same with electric receptacles per new seating layout & equipments; new supply air from existing equipment; additional exhaust. ref pa 2022-0922-2957. no exterior to the store front pe this review. exhaust fan in bathroom. no work in barDetails
mep permit. replace (e) lights & relocate; same with electric receptacles per new seating layout & equipments; new supply air from existing equipment; additional exhaust. ref pa 2022-0922-2957. no exterior to the store front pe this review. exhaust fan in bathroom. no work in bar | |
| Jan 27, 2023 | Completed final sign-off Feb 2024 | 891 Bush St | alteration to issued permit#2022-0922-2957 to revise bathroom layout.Details
alteration to issued permit#2022-0922-2957 to revise bathroom layout. | |
| Sep 22, 2022 | Completed final sign-off Feb 2024 | 891 Bush St | expansion of existing bar into vacant next door space (891 bush), scope of work includes new bar, finishes, furnishings and ada bathroom. mep deferredDetails
expansion of existing bar into vacant next door space (891 bush), scope of work includes new bar, finishes, furnishings and ada bathroom. mep deferred | $100,000 |
| Jun 29, 2022 | Never finaled issued Aug 2022, no final | 3100 18th St | interior remodel: interior partitions, accessible bath. repair existing windows, replace skylights, roof repair, repair less than 50% existing exterior stair in kind, new finishes.Details
interior remodel: interior partitions, accessible bath. repair existing windows, replace skylights, roof repair, repair less than 50% existing exterior stair in kind, new finishes. | $250,000 |
| Dec 11, 2017 | Completed final sign-off Apr 2019 | 1006 Page St | remodel kitchen, add 1/2 bath & bath, install one replacement window and one new window, add one bedroom.Details
remodel kitchen, add 1/2 bath & bath, install one replacement window and one new window, add one bedroom. | $90,000 |
| Jul 31, 2017 | Completed final sign-off Dec 2017 | 280 14th St | bathroom construction in extg permitted space. ref app#201602290740 n/a for maherDetails
bathroom construction in extg permitted space. ref app#201602290740 n/a for maher | $17,000 |
| Feb 17, 2016 | Completed final sign-off Sep 2017 | 3267 20th St | interior renovation of (e) single family residence. remove (e) slab & excavate for (n) foundation, convert 1 car garage to 3 car garage, convert rear 1/f from non habitable to habitable space, replace (e) interior stair from 1/f to 2/f, add (n) powder room on 2/f, (n) bath on 3/fDetails
interior renovation of (e) single family residence. remove (e) slab & excavate for (n) foundation, convert 1 car garage to 3 car garage, convert rear 1/f from non habitable to habitable space, replace (e) interior stair from 1/f to 2/f, add (n) powder room on 2/f, (n) bath on 3/f | $186,000 |
| Aug 11, 2015 | Completed final sign-off Dec 2015 | 532 Jessie St | to comply with n.o.v. #2015586118. install hood,oven, 3 compartment sink and other kitchen equipment and finishes.convert 2 non-ada to one ada bathroom. separate garage from kitchen area with non-bearing wall.Details
to comply with n.o.v. #2015586118. install hood,oven, 3 compartment sink and other kitchen equipment and finishes.convert 2 non-ada to one ada bathroom. separate garage from kitchen area with non-bearing wall. | $125,000 |
| Aug 10, 2015 | Never finaled issued Apr 2016, no final | 40 Temescal Tr | horizontal extension. remove & infill (e) court on 2/fl. horizontal expansion 3/fl: (n) roofdeck above 2/fl. remove & infill (e) fireplace & chimney. remodel 1, remove 1, & relocate 1 interior stairs. remodel kitchen & bathrooms.Details
horizontal extension. remove & infill (e) court on 2/fl. horizontal expansion 3/fl: (n) roofdeck above 2/fl. remove & infill (e) fireplace & chimney. remodel 1, remove 1, & relocate 1 interior stairs. remodel kitchen & bathrooms. | $350,000 |
| May 5, 2014 | Completed final sign-off Sep 2014 | 2346 Chestnut St | revision to permit #201312174392. adding wireless door openers to front entry and bathroom renovation. no change of front elevation.Details
revision to permit #201312174392. adding wireless door openers to front entry and bathroom renovation. no change of front elevation. | $18,000 |
| Nov 1, 2012 | Never finaled issued Oct 2013, no final | 1074 Dolores St | remodel/addition of a single family dwelling in a 2-unit condo. remodel of 2nd fl bedrm, kitchen, living rm, family rm & bath. addition of (n) interior stair conversion of 3rd fl (attic) to (n) master bedrm w/ new closet & (n) bath. addition of (n) deck on (e) roof.Details
remodel/addition of a single family dwelling in a 2-unit condo. remodel of 2nd fl bedrm, kitchen, living rm, family rm & bath. addition of (n) interior stair conversion of 3rd fl (attic) to (n) master bedrm w/ new closet & (n) bath. addition of (n) deck on (e) roof. | $210,000 |