Plus Kao
- License
- M23749
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M23749 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Salas Obrien Engineer
- Based in
- Oakland
- On San Francisco permits
- Mar 2007 to Mar 2016
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Roebbelen Contracting Inc, Skyline Construction
- Engineers
- Matthew Pagendarm
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 10, 2016 | Completed final sign-off Apr 2018 | 2180 Harrison St | Skyline Construction | t.i. mechanical, minor relocation of grill locations, relocate one sensor (temp), final air balance. electrical, demo (e) electrical equipment, install new ups units, new electrical equipment, new lighting/control, new branch circuiting. 2/f t.i.pa#201601288211 n/a ordinance #155-13Details
t.i. mechanical, minor relocation of grill locations, relocate one sensor (temp), final air balance. electrical, demo (e) electrical equipment, install new ups units, new electrical equipment, new lighting/control, new branch circuiting. 2/f t.i.pa#201601288211 n/a ordinance #155-13 | $75,000 |
| Mar 1, 2007 | Completed final sign-off Sep 2008 | 1 Bush St | Roebbelen Contracting Inc | replace four crac units, replace 20 ton chiller, pump, and air handler with new ac unit, modify existing overhead duct work, new controls, new electrical to support new mechanical work.Details
replace four crac units, replace 20 ton chiller, pump, and air handler with new ac unit, modify existing overhead duct work, new controls, new electrical to support new mechanical work. | $450,000 |