Victor Steffen
- License
- E11872
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E11872 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Feb 2018 to Jul 2021
3 permits since 2000 (engineer on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Turner Construction Co (3)
- Architects
- Michelle Jones (2)
- Engineers
- Gurdaver Singh (2), Matthew Frantz
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 12, 2021 | Completed final sign-off Sep 2021 | 2180 Harrison St | Turner Construction Co | t.i. installing new security wall with access controlled entrance and separate entrance at guard desk, enhancements to pg&e security system.Details
t.i. installing new security wall with access controlled entrance and separate entrance at guard desk, enhancements to pg&e security system. | $195,000 |
| Feb 12, 2018 | Completed final sign-off Mar 2019 | 2180 Harrison St | Turner Construction Co | 3rd floor - restroom refresh - flooring, wall & ceiling finishes. ada upgrade to restrooms. maher naDetails
3rd floor - restroom refresh - flooring, wall & ceiling finishes. ada upgrade to restrooms. maher na | $200,000 |
| Feb 12, 2018 | Completed final sign-off Mar 2019 | 2180 Harrison St | Turner Construction Co | 2nd floor - restroom refresh - flooring, wall & ceiling finishes. ada upgrade to restrooms. maher naDetails
2nd floor - restroom refresh - flooring, wall & ceiling finishes. ada upgrade to restrooms. maher na | $200,000 |