Permits filed here
118 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 23, 2026 | In progress filed Sep 2026, not yet issued | 45 Beale St | abatement of exterior asbestos paintDetails
abatement of exterior asbestos paint | $100,000 | |
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 45 Beale St | Bayview Environmental Services Inc. | interior soft demolition and asbestos abatement.Details
interior soft demolition and asbestos abatement. | $3,249,085 |
| Aug 28, 2026 | In progress filed Aug 2026, not yet issued | 50 Main St | removal of asbestos skin coat on wallsDetails
removal of asbestos skin coat on walls | $1,000,000 | |
| Dec 8, 2022 | Never finaled filed Dec 2022, never issued | 215 Market St | alteration & addition to(e) historic bldg.work on street facing facade limite to(n)windows,doors 7 mechanical louvers;work on interior sides of bldg to add horizontal addition of office & retail space;(e)basement will be partially demolished & rebuilt with(n) underground parking & bldg services.Details
alteration & addition to(e) historic bldg.work on street facing facade limite to(n)windows,doors 7 mechanical louvers;work on interior sides of bldg to add horizontal addition of office & retail space;(e)basement will be partially demolished & rebuilt with(n) underground parking & bldg services. | $9,116,204 | |
| Sep 8, 2022 | Expired or cancelled withdrawn Sep 2025 | 50 Main St | Turner Construction Co | to construct a 88-story, 808 dwelling units, type 1-a building.Details
to construct a 88-story, 808 dwelling units, type 1-a building. | $180,239,092 |
| Sep 8, 2022 | Expired or cancelled withdrawn May 2026 | 50 Main St | Turner Construction Co | to demolish existing parking garage. 2-story, 1-basement, type i.Details
to demolish existing parking garage. 2-story, 1-basement, type i. | |
| Jun 13, 2022 | Never finaled issued Jun 2022, no final | 215 Market St | Turner Construction Co | interior temporary demolition of (e) elements as indicated in drawings to achieve confirmation all elements, demolished are to be re-installed as previous. no change in occupancy use or area.Details
interior temporary demolition of (e) elements as indicated in drawings to achieve confirmation all elements, demolished are to be re-installed as previous. no change in occupancy use or area. | $89,500 |
| Sep 12, 2020 | Never finaled filed Sep 2020, never issued | 245 Market St | replace (e) diesel fire pump w/electric, replace controller of other electric fire pumpDetails
replace (e) diesel fire pump w/electric, replace controller of other electric fire pump | $875,747 | |
| Jul 22, 2020 | Never finaled issued Aug 2020, no final | 45 Beale St | Siemens Industry, Inc. | 1/f: fire alarm system, addition of (4) monitor modules to connect into (4) smoke detector held-open door locations for auditorium on 1/f; detectors and door holders are provided by othersDetails
1/f: fire alarm system, addition of (4) monitor modules to connect into (4) smoke detector held-open door locations for auditorium on 1/f; detectors and door holders are provided by others | $2,200 |
| Mar 5, 2020 | Never finaled issued Mar 2020, no final | 245 Market St | street spaceDetails
street space | ||
| Dec 27, 2019 | Completed final sign-off Apr 2021 | 245 Market St | Clune Construction Company L P | rev to pa# 201711022935; relocate power door actuators, provide level landing to door activators. n/a maherDetails
rev to pa# 201711022935; relocate power door actuators, provide level landing to door activators. n/a maher | $20,000 |
| Sep 20, 2019 | Never finaled issued Sep 2019, no final | 50 Main St | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| Aug 15, 2019 | Never finaled issued Aug 2019, no final | 245 Market St | street spaceDetails
street space | ||
| Jul 16, 2019 | Never finaled issued Jul 2019, no final | 245 Market St | Siemens Industry, Inc. | 1st flr - fire alarm as built per sffd inspector. no devices added or removed as the dwgs reflect final device locations as installed. life safety permit app# 201804277562; note: 3 of 8 (9) sheets submitted for "as built" set; ref 201802151427 (ti)Details
1st flr - fire alarm as built per sffd inspector. no devices added or removed as the dwgs reflect final device locations as installed. life safety permit app# 201804277562; note: 3 of 8 (9) sheets submitted for "as built" set; ref 201802151427 (ti) | |
| Feb 20, 2019 | Never finaled issued Feb 2019, no final | 245 Market St | street spaceDetails
street space | ||
| Oct 9, 2018 | Never finaled issued Oct 2018, no final | 245 Market St | street spaceDetails
street space | ||
| Aug 8, 2018 | Never finaled issued Aug 2018, no final | 25 Beale St | street spaceDetails
street space | ||
| May 8, 2018 | Never finaled issued May 2018, no final | 245 Market St | street spaceDetails
street space | ||
| May 7, 2018 | Never finaled filed May 2018, never issued | 245 Market St | street space | ||
| Apr 27, 2018 | Never finaled issued Apr 2018, no final | 245 Market St | Siemens Industry, Inc. | 1st flr - fire alarm - add 1 smk det, 1 strobe power supply, 16 speakers/strobes and 6 strobes. maher naDetails
1st flr - fire alarm - add 1 smk det, 1 strobe power supply, 16 speakers/strobes and 6 strobes. maher na | $15,600 |
| Apr 12, 2018 | Never finaled issued Apr 2018, no final | 215 Market St | street space permitDetails
street space permit | ||
| Apr 12, 2018 | Never finaled issued Apr 2018, no final | 215 Market St | street space permitDetails
street space permit | ||
| Mar 26, 2018 | Completed final sign-off Jun 2018 | 245 Market St | R L H Fire Protection Inc | 1/f fire sprinkler ti: 5 relocated pendents, 16 added pendents, 21 heads total .ref pa #201708104421. maher naDetails
1/f fire sprinkler ti: 5 relocated pendents, 16 added pendents, 21 heads total .ref pa #201708104421. maher na | $10,497 |
| Mar 22, 2018 | Completed final sign-off Jul 2024 | 245 Market St | Siemens Industry, Inc. | fire alarm work to upgrade the (e) life safety system. the work will include the replacement of 23 panels. all field devices to be revised and will remain as installed.Details
fire alarm work to upgrade the (e) life safety system. the work will include the replacement of 23 panels. all field devices to be revised and will remain as installed. | $240,000 |
| Mar 20, 2018 | Never finaled issued Mar 2018, no final | 25 Beale St | strret space permitDetails
strret space permit | ||
| Feb 28, 2018 | Never finaled issued Feb 2018, no final | 215 Market St | street spaceDetails
street space | ||
| Feb 15, 2018 | Completed final sign-off Sep 2019 | 245 Market St | Clune Construction Company L P | revision to app#201708104421. work consisting of interior t.i. partitions, ceiling, finishes and mep. n/a for maherDetails
revision to app#201708104421. work consisting of interior t.i. partitions, ceiling, finishes and mep. n/a for maher | $350,000 |
| Jan 4, 2018 | Never finaled issued Jan 2018, no final | 25 Beale St | street spaceDetails
street space | ||
| Jan 4, 2018 | Never finaled issued Jan 2018, no final | 215 Market St | street spaceDetails
street space | ||
| Nov 30, 2017 | Never finaled issued Dec 2017, no final | 245 Market St | street space permitDetails
street space permit | ||
| Nov 2, 2017 | Completed final sign-off Apr 2021 | 245 Market St | Clune Construction Company L P | proposed tenant improvement to include demo of canopies on streets market and main new entrance doors market st, new light fixtures. minor alteration.Details
proposed tenant improvement to include demo of canopies on streets market and main new entrance doors market st, new light fixtures. minor alteration. | $10,000 |
| Oct 6, 2017 | Never finaled issued Oct 2017, no final | 25 Beale St | street space w/mtaDetails
street space w/mta | ||
| Sep 15, 2017 | Never finaled issued Sep 2017, no final | 25 Beale St | street spaceDetails
street space | ||
| Sep 13, 2017 | Never finaled issued Sep 2017, no final | 215 Market St | street spaceDetails
street space | ||
| Sep 13, 2017 | Never finaled issued Sep 2017, no final | 215 Market St | street space w/mtaDetails
street space w/mta | ||
| Aug 10, 2017 | Completed final sign-off Sep 2019 | 245 Market St | Clune Construction Company L P | demo partitions, doors, millwork, floor & mep. create offices, ada restrooms, breakroom, load bearing partitions, mepDetails
demo partitions, doors, millwork, floor & mep. create offices, ada restrooms, breakroom, load bearing partitions, mep | $1,500,000 |
| Mar 23, 2017 | Never finaled issued Mar 2017, no final | 215 Market St | street spaceDetails
street space | ||
| Mar 14, 2017 | Completed final sign-off Apr 2018 | 215 Market St | Skyline Construction | maintenance and repairs to exterior walls. n/a ordinance #155-13Details
maintenance and repairs to exterior walls. n/a ordinance #155-13 | $2,000,000 |
| Mar 7, 2017 | Never finaled issued Mar 2017, no final | 45 Beale St | Siemens Industry, Inc. | 4th flr: fire alarm as builts per the sffd testing inspector. revision reflect the as installed work for the "s4/s6 hvac phase 3" project. no new devices added under this permit. ref 201312124045Details
4th flr: fire alarm as builts per the sffd testing inspector. revision reflect the as installed work for the "s4/s6 hvac phase 3" project. no new devices added under this permit. ref 201312124045 | |
| Feb 22, 2017 | Never finaled issued Feb 2017, no final | 215 Market St | street space permitDetails
street space permit | ||
| Dec 20, 2016 | Never finaled filed Dec 2016, never issued | 245 Market St | Roebbelen Contracting Inc | window washing equipment. demolition & installation of push out riggers, rotation of davit bases and installation of davits, install of guard rails. maher n/a ordinance #155-13Details
window washing equipment. demolition & installation of push out riggers, rotation of davit bases and installation of davits, install of guard rails. maher n/a ordinance #155-13 | $272,144 |
| Oct 12, 2016 | Never finaled issued Oct 2016, no final | 215 Market St | street spaceDetails
street space | ||
| Aug 1, 2016 | Never finaled issued Aug 2016, no final | 215 Market St | street spaceDetails
street space | ||
| Jun 3, 2016 | Completed final sign-off Jul 2016 | 45 Beale St | Siemens Industry, Inc. | 3rd floor: fire alarm work add a relay module, reference 2014.11.18.7733. maher naDetails
3rd floor: fire alarm work add a relay module, reference 2014.11.18.7733. maher na | $510 |
| Mar 28, 2016 | Never finaled issued Mar 2016, no final | 215 Market St | meters onlyDetails
meters only | ||
| Feb 10, 2016 | Never finaled issued Feb 2016, no final | 215 Market St | street space permitDetails
street space permit | ||
| Feb 4, 2016 | Never finaled issued Feb 2016, no final | 45 Beale St | Siemens Industry, Inc. | fire alarm work for the "electrical room" ti. remodel on floor 3; additions are 2 duct detectors and 8 speaker/strobes. ref pa 2015-0209-7788. maher naDetails
fire alarm work for the "electrical room" ti. remodel on floor 3; additions are 2 duct detectors and 8 speaker/strobes. ref pa 2015-0209-7788. maher na | $5,200 |
| Jan 7, 2016 | Never finaled issued Jan 2016, no final | 215 Market St | street spaceDetails
street space | ||
| Dec 7, 2015 | Completed final sign-off May 2016 | 245 Market St | Roebbelen Contracting Inc | basement/13th fl: replace 4 ats switches with wire conduit as needed. build concrete housekeeping pads, new door and frames in electriclal rooms. n/a maher ordinance.Details
basement/13th fl: replace 4 ats switches with wire conduit as needed. build concrete housekeeping pads, new door and frames in electriclal rooms. n/a maher ordinance. | $763,685 |
| Sep 1, 2015 | Completed final sign-off Jul 2017 | 215 Market St | Roebbelen Contracting Inc | amending extg permitted project per app#201406198847 with new information. window jamb details, misc. window repairs, stucco and terra cotta repairs, expansion joint repairs, stucco and terra cotta repairs, expansion joint repairs. n/a for maherDetails
amending extg permitted project per app#201406198847 with new information. window jamb details, misc. window repairs, stucco and terra cotta repairs, expansion joint repairs, stucco and terra cotta repairs, expansion joint repairs. n/a for maher | $100,000 |
| Jul 29, 2015 | Never finaled issued Jul 2015, no final | 215 Market St | street spaceDetails
street space | ||
| Jul 21, 2015 | Never finaled issued Jul 2015, no final | 215 Market St | street spaceDetails
street space | ||
| May 18, 2015 | Never finaled issued Jun 2015, no final | 25 Beale St | demo existing milolwork add new millwork, add new equipement. no change to existing hood, relocate non structural partitionDetails
demo existing milolwork add new millwork, add new equipement. no change to existing hood, relocate non structural partition | $70,000 | |
| Apr 10, 2015 | Completed final sign-off Dec 2015 | 215 Market St | Paradigm General Contractors | mep drawings for pa# 201409176520, hvac and electrical work only. n/a ordinance #155-13Details
mep drawings for pa# 201409176520, hvac and electrical work only. n/a ordinance #155-13 | $80,000 |
| Feb 9, 2015 | Completed final sign-off Oct 2016 | 45 Beale St | C B 2 Builders Incorporated | revision to pa #2014.1118.1733 - install new electrical equipment & relocate existing mechanical equipment provide new concrete pad for all equipment. n/a maher ordinanceDetails
revision to pa #2014.1118.1733 - install new electrical equipment & relocate existing mechanical equipment provide new concrete pad for all equipment. n/a maher ordinance | $1,500,000 |
| Nov 18, 2014 | Completed final sign-off Oct 2016 | 45 Beale St | C B 2 Builders Incorporated | replace outdated, non serviceable elec gear and remove single point of failure locations through the distribution. n2 existing ups systems and respective batteries reused and switch gear will be replaced. 2 existing elec rooms, 1 batter rm and adjacent corridor will be combined into 1 elec roomDetails
replace outdated, non serviceable elec gear and remove single point of failure locations through the distribution. n2 existing ups systems and respective batteries reused and switch gear will be replaced. 2 existing elec rooms, 1 batter rm and adjacent corridor will be combined into 1 elec room | $85,000 |
| Oct 23, 2014 | Completed final sign-off Jul 2015 | 215 Market St | Siemens Industry, Inc. | reference ti appl. 2014.0917.6520. fire alarm for the room 112b/116 opt 2h t.i. project on floor 1 additions are 2 speaker/strobes. maher n/a.Details
reference ti appl. 2014.0917.6520. fire alarm for the room 112b/116 opt 2h t.i. project on floor 1 additions are 2 speaker/strobes. maher n/a. | $1,000 |
| Oct 21, 2014 | Completed final sign-off May 2015 | 45 Beale St | Roebbelen Contracting Inc | 3rd flr. t.i. remove existing pair doors, install single door, patch and fill opening as req'd. cut opening in existing partition and install new door. interior work only. maher n/a.Details
3rd flr. t.i. remove existing pair doors, install single door, patch and fill opening as req'd. cut opening in existing partition and install new door. interior work only. maher n/a. | $12,000 |
| Oct 3, 2014 | Completed final sign-off Oct 2014 | 215 Market St | H & M Fire Protection, Inc. | relocate 7 sprinklers for t.i. improvements (201409176520); maher n/aDetails
relocate 7 sprinklers for t.i. improvements (201409176520); maher n/a | $4,500 |
| Sep 24, 2014 | Never finaled issued Sep 2014, no final | 215 Market St | street spaceDetails
street space | ||
| Sep 22, 2014 | Completed final sign-off Sep 2015 | 45 Beale St | Siemens Industry, Inc. | 4th floor: fire alarm work for the "s4/s6 hvac revision. addition of a new remote panel and 20 relay modules. the inital f.a. permit for this job is 201407161364. ref app#201312124045. n/a for maher ordinance #155-13Details
4th floor: fire alarm work for the "s4/s6 hvac revision. addition of a new remote panel and 20 relay modules. the inital f.a. permit for this job is 201407161364. ref app#201312124045. n/a for maher ordinance #155-13 | $11,000 |
| Sep 17, 2014 | Completed final sign-off Dec 2015 | 215 Market St | Paradigm General Contractors | grnd floor, t.i. demo existing gyp board partitions as shown. construct new gyp bd partitions for new conference rooms, relocate (e) light fixtures, interior work only - mep separate permit. sprinkler and life safety under separate permits; maher n/aDetails
grnd floor, t.i. demo existing gyp board partitions as shown. construct new gyp bd partitions for new conference rooms, relocate (e) light fixtures, interior work only - mep separate permit. sprinkler and life safety under separate permits; maher n/a | $23,000 |
| Aug 25, 2014 | Completed final sign-off Oct 2017 | 45 Beale St | Roebbelen Contracting Inc | remove seven existing automatic transfer switches, replace with one automatic transfer switch. replace one electrical panel including conduit & cables. n/a maher ordinanceDetails
remove seven existing automatic transfer switches, replace with one automatic transfer switch. replace one electrical panel including conduit & cables. n/a maher ordinance | $230,000 |
| Jul 16, 2014 | Completed final sign-off Mar 2017 | 45 Beale St | Siemens Industry, Inc. | 4th floor:fire alarm work the " s4/s6 hvac revision" project on floor 4, addition of 37 duct detectors and 3 modules. ref app#201312124045. n/a for the maher ordinance #155-13Details
4th floor:fire alarm work the " s4/s6 hvac revision" project on floor 4, addition of 37 duct detectors and 3 modules. ref app#201312124045. n/a for the maher ordinance #155-13 | $23,200 |
| Jul 3, 2014 | Completed final sign-off May 2015 | 45 Beale St | Sabah International Incorporated | 3rd floor. relocate novec 1230 clean agent fire suppression system re-locate altonox power supply & 2 hoffman enclosures. add 1 discharge strobes at new door & re-locate 1 discharge strobe. ** maher: compliance with ordinance no# 155-13 not required **Details
3rd floor. relocate novec 1230 clean agent fire suppression system re-locate altonox power supply & 2 hoffman enclosures. add 1 discharge strobes at new door & re-locate 1 discharge strobe. ** maher: compliance with ordinance no# 155-13 not required ** | $46,181 |
| Jul 2, 2014 | Never finaled issued Apr 2015, no final | 50 Main St | Paradigm General Contractors | remove extenet's existing cell site from penthouse on roof of parking structural. remove antennas and associated equipment for at&t facility. n/a ordinance #155-13.Details
remove extenet's existing cell site from penthouse on roof of parking structural. remove antennas and associated equipment for at&t facility. n/a ordinance #155-13. | $1,200 |
| Jun 19, 2014 | Completed final sign-off Jul 2017 | 215 Market St | Roebbelen Contracting Inc | replace (e) windows on n,e, & s elevations with (n) wood windows. n/a for the maher ordinance #155-13Details
replace (e) windows on n,e, & s elevations with (n) wood windows. n/a for the maher ordinance #155-13 | $800,000 |
| Mar 18, 2014 | Never finaled issued Mar 2014, no final | 215 Market St | street spaceDetails
street space | ||
| Jan 3, 2014 | Completed final sign-off Jan 2014 | 245 Market St | Paradigm General Contractors | revision to 201305308242. revised sheet #a1.1 accessible entry/exit for change to ada push button type change to detail 4 on sheet a1.1Details
revision to 201305308242. revised sheet #a1.1 accessible entry/exit for change to ada push button type change to detail 4 on sheet a1.1 | |
| Dec 12, 2013 | Completed final sign-off Apr 2017 | 45 Beale St | C B 2 Builders Incorporated | replacement of (6) air handling unit on 4th floor penthouse. 6 return/exhaust fan motors with vfds. replace reheat coil valve controls on 1st/mezzanine floor. replace fire dampers on 4th floor penthouse with fsd and monitoring panel.Details
replacement of (6) air handling unit on 4th floor penthouse. 6 return/exhaust fan motors with vfds. replace reheat coil valve controls on 1st/mezzanine floor. replace fire dampers on 4th floor penthouse with fsd and monitoring panel. | $3,000,000 |
| Dec 12, 2013 | Completed final sign-off Mar 2014 | 245 Market St | C B 2 Builders Incorporated | mechanical & electrical deferred submittal for equipment replacement & electrical work for building permit pa#2013-04-09-4049 for auditorium renovation.Details
mechanical & electrical deferred submittal for equipment replacement & electrical work for building permit pa#2013-04-09-4049 for auditorium renovation. | $156,500 |
| Dec 11, 2013 | Never finaled issued Dec 2013, no final | 45 Beale St | Siemens Industry, Inc. | floor 2 -addition of 2 monitor modules to monitor 2 existing crac unit's integral (built-in) smoke detectors. both devices connect onto the fire alarm system. the crac units are existing.Details
floor 2 -addition of 2 monitor modules to monitor 2 existing crac unit's integral (built-in) smoke detectors. both devices connect onto the fire alarm system. the crac units are existing. | $1,000 |
| Dec 11, 2013 | Completed final sign-off Feb 2014 | 245 Market St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler heads per ti 12 relocates, at gr flDetails
relocate fire sprinkler heads per ti 12 relocates, at gr fl | $6,168 |
| May 30, 2013 | Completed final sign-off Jan 2014 | 245 Market St | Paradigm General Contractors | construct 2 glazing walls on 15th floorDetails
construct 2 glazing walls on 15th floor | $3,000 |
| May 1, 2013 | Completed final sign-off Jan 2014 | 245 Market St | Paradigm General Contractors | 15th floor-remove non load bearing walls to create open office areaDetails
15th floor-remove non load bearing walls to create open office area | $10,000 |
| Apr 30, 2013 | Never finaled issued Apr 2013, no final | 45 Beale St | Siemens Industry, Inc. | submission of "as built" drawings (matrix & floor plan) per the requirement of the sffd inspector who performed the final test, original fa permmit ref. 201304094036Details
submission of "as built" drawings (matrix & floor plan) per the requirement of the sffd inspector who performed the final test, original fa permmit ref. 201304094036 | |
| Apr 9, 2013 | Completed final sign-off Mar 2014 | 245 Market St | C B 2 Builders Incorporated | ground floor - demo existing ceiling & section of partition at auditorium lobby, construction of new ceiling and partition, mech elec, life safety & sprinkler under separate permit. install coat closet.Details
ground floor - demo existing ceiling & section of partition at auditorium lobby, construction of new ceiling and partition, mech elec, life safety & sprinkler under separate permit. install coat closet. | $50,000 |
| Apr 9, 2013 | Completed final sign-off Feb 2014 | 45 Beale St | Siemens Industry, Inc. | addition of 2 duct detectors for the floor 1 "auditorium" project. both devices connect onto the fire alarm systemDetails
addition of 2 duct detectors for the floor 1 "auditorium" project. both devices connect onto the fire alarm system | $1,200 |
| Jan 16, 2013 | Expired or cancelled disapproved Nov 2018 | 50 Main St | 1 panel antenna to be installed at an existing wireless telecommunications facility located on a parking garage rooftop. a faux chase cover will be installed to completely screen the antenna. 2 bby cabinets and 2 radio node units will also be installed on the garage rooftop.Details
1 panel antenna to be installed at an existing wireless telecommunications facility located on a parking garage rooftop. a faux chase cover will be installed to completely screen the antenna. 2 bby cabinets and 2 radio node units will also be installed on the garage rooftop. | $10,000 | |
| Dec 21, 2012 | Expired or cancelled cancelled Jan 2016 | 215 Market St | C B 2 Builders Incorporated | (roof level)install new housekeeping pad at roof level for mechanical equipment. extend (e) emergency generator exhaust ducts, install new exhaust fans.Details
(roof level)install new housekeeping pad at roof level for mechanical equipment. extend (e) emergency generator exhaust ducts, install new exhaust fans. | $85,000 |
| Aug 20, 2012 | Completed final sign-off Jul 2013 | 245 Market St | Menemsha Development Group Inc | interior t.i. for (e) bank at ground floor. work includes (n) fixtures, finish int. partitions, relocateion of int. atm machines. no changes to m.e.p. fire protection under separate permit. no exterior work.Details
interior t.i. for (e) bank at ground floor. work includes (n) fixtures, finish int. partitions, relocateion of int. atm machines. no changes to m.e.p. fire protection under separate permit. no exterior work. | $77,000 |
| Jul 10, 2012 | Completed final sign-off Aug 2012 | 245 Market St | C B 2 Builders Incorporated | t.i. remove (e) drywall partitions, construct new drywall partition, install new doors as indicated, expand rooms 301 & 302. relocate (e) light fixtures. hvac under separate permit. sprinkler & life safety under separate permit.Details
t.i. remove (e) drywall partitions, construct new drywall partition, install new doors as indicated, expand rooms 301 & 302. relocate (e) light fixtures. hvac under separate permit. sprinkler & life safety under separate permit. | $14,000 |
| May 23, 2012 | Completed final sign-off Jan 2013 | 245 Market St | Rfi Enterprises Inc. | voluntary upgrade of visual notification appliances on existing phase ii. fire alarm permit. 42 new power supplies, 18 sync modules, 987 new notification appliances (strobes and speaker strobes).Details
voluntary upgrade of visual notification appliances on existing phase ii. fire alarm permit. 42 new power supplies, 18 sync modules, 987 new notification appliances (strobes and speaker strobes). | $100,000 |
| Apr 26, 2012 | Completed final sign-off Jun 2012 | 245 Market St | C B 2 Builders Incorporated | 1st flr, ste 1b: t.i. to an extg salon. minor partition walls and finishes added. mep separate permit.Details
1st flr, ste 1b: t.i. to an extg salon. minor partition walls and finishes added. mep separate permit. | $80,000 |
| Apr 10, 2012 | Completed final sign-off Jan 2013 | 215 Market St | Paradigm General Contractors | floor 4th - add (1) new private office: walls, door, side light, new electrical & lighting, adj hvac. life safety/sprinkler under design build.Details
floor 4th - add (1) new private office: walls, door, side light, new electrical & lighting, adj hvac. life safety/sprinkler under design build. | $7,500 |
| Feb 8, 2012 | Never finaled issued Feb 2012, no final | 25 Beale St | Siemens Industry, Inc. | floor 1st - addition of 3 smoke detectors, 1 relay modules, & 5 door holders for the "corridor remodel" project @ pg&e. all devices connect onto the life safety system.Details
floor 1st - addition of 3 smoke detectors, 1 relay modules, & 5 door holders for the "corridor remodel" project @ pg&e. all devices connect onto the life safety system. | $3,600 |
| Feb 3, 2012 | Completed final sign-off Feb 2012 | 45 Beale St | Siemens Industry, Inc. | addition of 2 smoke detectors and a relay module for the "battery room" on 2nd floor. all devices connect onto the existing fire alarm system.Details
addition of 2 smoke detectors and a relay module for the "battery room" on 2nd floor. all devices connect onto the existing fire alarm system. | $1,500 |
| Dec 28, 2011 | Never finaled issued Dec 2011, no final | 50 Main St | street space,sidewalk and mtaDetails
street space,sidewalk and mta | ||
| Nov 18, 2011 | Completed final sign-off Feb 2012 | 245 Market St | Paradigm General Contractors | 5th fl. - ti to construct 12'-6" lf of new gyp. bd. partition in existing office. sprinkler & life safey existing compliant.Details
5th fl. - ti to construct 12'-6" lf of new gyp. bd. partition in existing office. sprinkler & life safey existing compliant. | $3,000 |
| May 24, 2011 | Completed final sign-off Aug 2011 | 45 Beale St | Siemens Industry, Inc. | addition of 2 speaker/strobes and a relay module for (fsd),as well as the replacement of 2 smoke detectors with heat detectors,for the generator room on the roof level. the work was installed and tested with the sffd under extg permit application #201102230817 for a project at the basement level.Details
addition of 2 speaker/strobes and a relay module for (fsd),as well as the replacement of 2 smoke detectors with heat detectors,for the generator room on the roof level. the work was installed and tested with the sffd under extg permit application #201102230817 for a project at the basement level. | $2,500 |
| Apr 1, 2011 | Completed final sign-off May 2011 | 50 Main St | C B 2 Builders Incorporated | rework curb configuration in basement pump room. revision to app#201012036034.Details
rework curb configuration in basement pump room. revision to app#201012036034. | |
| Feb 23, 2011 | Never finaled issued Feb 2011, no final | 50 Main St | Siemens Industry, Inc. | basement level. addition of 2 smoke detectors, 1 relay module, 1 speaker/strobe, and 1 data circut card for the compressor pump room at the basement level. all new field devices convert on to the existing fire alarm system.Details
basement level. addition of 2 smoke detectors, 1 relay module, 1 speaker/strobe, and 1 data circut card for the compressor pump room at the basement level. all new field devices convert on to the existing fire alarm system. | $3,200 |
| Feb 8, 2011 | Completed final sign-off Feb 2012 | 50 Main St | C B 2 Builders Incorporated | basment. install new supply duct & new exhaust fan from (e) duct to exhaust garage only. architectural work performed under app#2010-12-03-6034. 1 hour shaft required- see note on plans----Details
basment. install new supply duct & new exhaust fan from (e) duct to exhaust garage only. architectural work performed under app#2010-12-03-6034. 1 hour shaft required- see note on plans---- | $11,500 |
| Feb 1, 2011 | Completed final sign-off Jun 2011 | 45 Beale St | R L H Fire Protection Inc | roof & garage fire sprinkler permit - add 16 new uprights & piping in generator room on roof. add 1 new upright in parking garage.Details
roof & garage fire sprinkler permit - add 16 new uprights & piping in generator room on roof. add 1 new upright in parking garage. | $8,500 |
| Dec 3, 2010 | Completed final sign-off Jun 2011 | 50 Main St | C B 2 Builders Incorporated | remove and replace existing sidewalk acess doors to meter room in basement with new sidewalk. existing meter room in basement to remain in useDetails
remove and replace existing sidewalk acess doors to meter room in basement with new sidewalk. existing meter room in basement to remain in use | $11,000 |
| Dec 3, 2010 | Completed final sign-off May 2011 | 50 Main St | C B 2 Builders Incorporated | construct 1 hr rated partition around existing fuel pump room, install 1 hour rated doors. construct concrete curb for water containment per fire dept and preapp meeting. mechanical and sprinklers separate permit.Details
construct 1 hr rated partition around existing fuel pump room, install 1 hour rated doors. construct concrete curb for water containment per fire dept and preapp meeting. mechanical and sprinklers separate permit. | $18,000 |
| Nov 22, 2010 | Completed final sign-off Jun 2011 | 25 Beale St | C B 2 Builders Incorporated | construct 2-hr rated electrical closet on ground floor lobby space, interior work onlyDetails
construct 2-hr rated electrical closet on ground floor lobby space, interior work only | $4,700 |
| Nov 15, 2010 | Completed final sign-off Jan 2011 | 45 Beale St | Siemens Industry, Inc. | 3rd floor-addition of 2 monitor modules, 1 relay module for fire alarm system inputs from the supporession system & epo switch panelsDetails
3rd floor-addition of 2 monitor modules, 1 relay module for fire alarm system inputs from the supporession system & epo switch panels | $1,500 |
| Oct 18, 2010 | Never finaled issued Oct 2010, no final | 45 Beale St | C B 2 Builders Incorporated | construct 2 hour rated enclosure around new electrical pull can, install 2 hr rated door and frame assembly at enclosure. not affecting any stair enclosureDetails
construct 2 hour rated enclosure around new electrical pull can, install 2 hr rated door and frame assembly at enclosure. not affecting any stair enclosure | $4,500 |
| Oct 5, 2010 | Expired or cancelled cancelled Jan 2026 | 245 Market St | tenant improvement. remove extg partitions, fixtures, construct new partitions, ceiling crown to remain.Details
tenant improvement. remove extg partitions, fixtures, construct new partitions, ceiling crown to remain. | $83,000 | |
| Sep 22, 2010 | Completed final sign-off Jun 2011 | 45 Beale St | C B 2 Builders Incorporated | install support beams w/isolators for future 2-600 kw diesel generators & support for future exhaust pipes. generator & exhaust pipes' under separate permit.Details
install support beams w/isolators for future 2-600 kw diesel generators & support for future exhaust pipes. generator & exhaust pipes' under separate permit. | $1,300,000 |
| Aug 16, 2010 | Never finaled issued Aug 2010, no final | 45 Beale St | Siemens Industry, Inc. | addition of 1 interface module at 3rd fl for ups thermal monitoring. new device to be tied to existing circuitDetails
addition of 1 interface module at 3rd fl for ups thermal monitoring. new device to be tied to existing circuit | $4,100 |
| Jun 18, 2010 | Never finaled issued Jun 2010, no final | 45 Beale St | Sabah International Incorporated | split previously submitted 3 zone nevel 1230 fire suppression system zones into add. zones. test and check 100% of sys devices. perform pressure test and pipe puff test. 200912102975Details
split previously submitted 3 zone nevel 1230 fire suppression system zones into add. zones. test and check 100% of sys devices. perform pressure test and pipe puff test. 200912102975 | $40,000 |
| Jun 1, 2010 | Completed final sign-off Oct 2010 | 45 Beale St | Fakouri Electrical Engrng | replace 2 existing 450 kva ups (uninteruptable power system) with new 150 kva parallel redundant upsDetails
replace 2 existing 450 kva ups (uninteruptable power system) with new 150 kva parallel redundant ups | $130,000 |
| May 26, 2010 | Never finaled issued Jun 2010, no final | 245 Market St | Siemens Industry, Inc. | provide relay to unlock turnstyle during a fire event in basement 1Details
provide relay to unlock turnstyle during a fire event in basement 1 | $2,000 |
| May 26, 2010 | Never finaled issued Jun 2010, no final | 25 Beale St | Siemens Industry, Inc. | fire alarm system. proc vide relay to unlock turn style during a fire event in basement 1.Details
fire alarm system. proc vide relay to unlock turn style during a fire event in basement 1. | $2,000 |
| May 26, 2010 | Never finaled issued Jun 2010, no final | 215 Market St | Siemens Industry, Inc. | fire alarm system. provide relay to unlock turnstyle during a fire event in basement.Details
fire alarm system. provide relay to unlock turnstyle during a fire event in basement. | $2,000 |
| Apr 28, 2010 | Completed final sign-off Jun 2010 | 45 Beale St | Siemens Industry, Inc. | 5th floor-revision to pa# 2008-1112-6287-add module to monitor new flow switch on roof, as built plansDetails
5th floor-revision to pa# 2008-1112-6287-add module to monitor new flow switch on roof, as built plans | $1,500 |
| Feb 26, 2010 | Completed final sign-off Apr 2010 | 45 Beale St | Siemens Industry, Inc. | 4th floor new smoke detector & relay base for new fire life safety.Details
4th floor new smoke detector & relay base for new fire life safety. | $5,000 |
| Dec 10, 2009 | Never finaled issued Jan 2010, no final | 45 Beale St | Sabah International Incorporated | 3rd floor-install 3 zones of novel 1230 fire suppression system, all on 3rd floor-total flooring. final & testDetails
3rd floor-install 3 zones of novel 1230 fire suppression system, all on 3rd floor-total flooring. final & test | $216,900 |
| Oct 20, 2009 | Never finaled issued Oct 2009, no final | 45 Beale St | Western Roofing Service | reroofingDetails
reroofing | $521,288 |
| Sep 30, 2009 | Never finaled issued Nov 2009, no final | 77 Beale St | Siemens Industry, Inc. | 4th floor. add module to monitor ats. provide 3 new tri-r modules to monitor ats. panel & relay points to security panel.Details
4th floor. add module to monitor ats. provide 3 new tri-r modules to monitor ats. panel & relay points to security panel. | $4,100 |
| Sep 30, 2009 | Never finaled issued Nov 2009, no final | 77 Beale St | Siemens Industry, Inc. | basement. add 2 modules to monitor, suppression panel in basement. connect to existing fire alarm.Details
basement. add 2 modules to monitor, suppression panel in basement. connect to existing fire alarm. | $4,100 |
| Sep 22, 2009 | Never finaled issued Oct 2009, no final | 77 Beale St | R L H Fire Protection Inc | ti upgrade on the e fire sprinkler system for pge on the 29th fl office space 2928, relocate 2 headsDetails
ti upgrade on the e fire sprinkler system for pge on the 29th fl office space 2928, relocate 2 heads | $400 |
| Aug 20, 2009 | Completed final sign-off Dec 2009 | 77 Beale St | Paradigm General Contractors | for final inspection app#2004/10/28/7949.Details
for final inspection app#2004/10/28/7949. | |
| Aug 20, 2009 | Completed final sign-off Dec 2009 | 77 Beale St | Paradigm General Contractors | for final inspection app#200412282210.Details
for final inspection app#200412282210. | |
| Mar 11, 2008 | Completed final sign-off May 2008 | 77 Beale St | Metropolitan Electrical Construction | renew pa#200608311134 for final inspection.Details
renew pa#200608311134 for final inspection. | |
| Aug 31, 2006 | Never finaled issued Nov 2006, no final | 77 Beale St | Metropolitan Electrical Construction | install new micro cellular panel antenna painted to match existing. install associated equipment, cabling and cable trays.Details
install new micro cellular panel antenna painted to match existing. install associated equipment, cabling and cable trays. | $25,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Siemens Industry, Inc. (26), C B 2 Builders Incorporated (15), Paradigm General Contractors (10), Roebbelen Contracting Inc (6), Clune Construction Company L P (4), R L H Fire Protection Inc (3), Sabah International Incorporated (3), Turner Construction Co (3), Metropolitan Electrical Construction (2), Ayoob & Peery Plumbing Co Inc, Bayview Environmental Services Inc., Fakouri Electrical Engrng, H & M Fire Protection, Inc., Menemsha Development Group Inc, Rfi Enterprises Inc., Skyline Construction, Western Roofing Service
- Architects
- Lori Winning (4), Rollie Childers (4), Michael Downey (3), Randall Lamb (2), Adrian Mcjunkin, Joseph Mendoza, Oscia Wilson, Peter Braun
- Engineers
- Wing Kit Lau (2), Adrian Mcjunkin, Carolyn Searls, Christopher Lloyd, Gurdaver Singh, Jon Yukio Yokoyama, Philip Tapia, Randall J. Girouard
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.