Wing Kit Lau
- Listed as
- engineer
- Firm
- Ati Architects & Engineers
- Based in
- Danville
- On San Francisco permits
- Aug 2014 to Dec 2015
2 permits since 2000 (engineer on 2 permits): 2 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 7, 2015 | Completed final sign-off May 2016 | 245 Market St | Roebbelen Contracting Inc | basement/13th fl: replace 4 ats switches with wire conduit as needed. build concrete housekeeping pads, new door and frames in electriclal rooms. n/a maher ordinance.Details
basement/13th fl: replace 4 ats switches with wire conduit as needed. build concrete housekeeping pads, new door and frames in electriclal rooms. n/a maher ordinance. | $763,685 |
| Aug 25, 2014 | Completed final sign-off Oct 2017 | 45 Beale St | Roebbelen Contracting Inc | remove seven existing automatic transfer switches, replace with one automatic transfer switch. replace one electrical panel including conduit & cables. n/a maher ordinanceDetails
remove seven existing automatic transfer switches, replace with one automatic transfer switch. replace one electrical panel including conduit & cables. n/a maher ordinance | $230,000 |