Oswald Castillo
- License
- C32890
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C32890 at the Board for Professional Engineers
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Boiled Architecture
- Based in
- San Francisco
- On San Francisco permits
- Apr 2008 to Sep 2015
8 permits since 2000 (architect on 5 permits, authorized agent-others on 2 permits, engineer on 1 permit): 7 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- C B 2 Builders Incorporated (2), Paradigm General Contractors (2), American Windows Cntr: Dba: Streamline C, Yerba Buena Builders Inc
- Architects
- Will Loftis (2), William Diefenbach
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 8
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 15, 2015 | Completed final sign-off Feb 2016 | 148 Townsend St | Yerba Buena Builders Inc | tenant improvement to expand existing suite on 3rd fl. 3, new conference rooms, new accessible toilet rooms, new closets, new ceiling mounted curtains. compliance with maher ordinance no 155-13 not required.Details
tenant improvement to expand existing suite on 3rd fl. 3, new conference rooms, new accessible toilet rooms, new closets, new ceiling mounted curtains. compliance with maher ordinance no 155-13 not required. | $105,000 |
| Sep 30, 2013 | Completed final sign-off Dec 2013 | 77 Beale St | Paradigm General Contractors | 16th flr: demolition of one (1) non structural partitionDetails
16th flr: demolition of one (1) non structural partition | $4,000 |
| Apr 5, 2013 | Completed final sign-off Aug 2014 | 77 Beale St | Paradigm General Contractors | basement level (b1) - selective demolitoin, ceiling, walls, non-structural as shown on plans, basement thru level 34 dumwaiter shaft. (ab-017) and (ab-005)Details
basement level (b1) - selective demolitoin, ceiling, walls, non-structural as shown on plans, basement thru level 34 dumwaiter shaft. (ab-017) and (ab-005) | $30,000 |
| Oct 30, 2012 | Completed final sign-off Feb 2014 | 3282 Mission St | barrier removal consisting of new accessible ramp, built up floor for currectly vacant space. scope includes structural work. no change to the building envelope & no mechanical, electrical or plumbing work.Details
barrier removal consisting of new accessible ramp, built up floor for currectly vacant space. scope includes structural work. no change to the building envelope & no mechanical, electrical or plumbing work. | $7,500 | |
| Apr 17, 2012 | Completed final sign-off Jul 2012 | 3282 Mission St | American Windows Cntr: Dba: Streamline C | revision to pa# 2012-0316-6220-to show automatic door operatorDetails
revision to pa# 2012-0316-6220-to show automatic door operator | $9,000 |
| Aug 5, 2008 | Completed final sign-off Feb 2009 | 120 Montgomery St | C B 2 Builders Incorporated | revision to permit# 200803207573 for men's and women's bathroom.Details
revision to permit# 200803207573 for men's and women's bathroom. | |
| Jul 30, 2008 | Completed final sign-off Apr 2009 | 120 Montgomery St | C B 2 Builders Incorporated | 20th floor-tenant improvements consisting of demolition of (e) ceiling. limited demolition of partitions & removal of (e) flooring. new ceiling, lights & finishes throughout. no work to (e) corridor of demising walls. no structural work or changes to building envelope. m.e.p. to be design build & suDetails
20th floor-tenant improvements consisting of demolition of (e) ceiling. limited demolition of partitions & removal of (e) flooring. new ceiling, lights & finishes throughout. no work to (e) corridor of demising walls. no structural work or changes to building envelope. m.e.p. to be design build & su | $50,000 |
| Apr 9, 2008 | Expired or cancelled expired Jul 2009 | 120 Montgomery St | tenant improvement consisting of new offices, reception area, break room w/ new finishes throughout. no work to corridor or demising walls w/ minor upgrades to existing toilet rooms. no structural work or changes to building envelope. mep. seperate permit.Details
tenant improvement consisting of new offices, reception area, break room w/ new finishes throughout. no work to corridor or demising walls w/ minor upgrades to existing toilet rooms. no structural work or changes to building envelope. mep. seperate permit. | $131,000 |