Block 3709, lot 016

425 Market St

City’s use
Commercial Office
Built
1973
Stories
38
Rooms
74 bathrooms
Building
996,760 sq ft
Zoning
C3O
Construction type
A

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

49 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 14, 2026In progress
filed Jul 2026, not yet issued
425 Market Sttenanat improvement project involves demolition of non load bearing partitons, ceiling grid and tile, lights, electrical outlets, finishes, doors, frames, glazing. no remodediatin work included in scope. acm to be removed or encapsulated by landlord subcontractor prior to demolition.
Details
Permit
202607144965

tenanat improvement project involves demolition of non load bearing partitons, ceiling grid and tile, lights, electrical outlets, finishes, doors, frames, glazing. no remodediatin work included in scope. acm to be removed or encapsulated by landlord subcontractor prior to demolition.

Open the permit page

$250,000
May 13, 2026In progress
issued May 2026
425 Market StGci, Inc12th fl;reference:202604219808. mech: duct distribution is being modified per new space plan, (1) new condenser water pump is being added, no new fsds. elec: electric single line riser diagram & panel, two way comm.system power signal. plumbing:no new tank water heater being added.
Details
Permit
202605131174
Permit issued
May 27, 2026

12th fl;reference:202604219808. mech: duct distribution is being modified per new space plan, (1) new condenser water pump is being added, no new fsds. elec: electric single line riser diagram & panel, two way comm.system power signal. plumbing:no new tank water heater being added.

Open the permit page

$250,000
Apr 21, 2026In progress
issued May 2026
425 Market StGci, Incdemo of non-load bearing partions, doors, glazing, lighting & finishes & new construction
Details
Permit
202604219808
Permit issued
May 7, 2026

demo of non-load bearing partions, doors, glazing, lighting & finishes & new construction

Open the permit page

$150,000
Sep 30, 2025Completed
final sign-off Oct 2025
425 Market StPyro-Comm Systems, Inc.26th floor: 2 call stations will be added to elevator lobbies. pa#2025-0709-0436
Details
Permit
202509306348
Permit issued
Sep 30, 2025
Final sign-off
Oct 24, 2025

26th floor: 2 call stations will be added to elevator lobbies. pa#2025-0709-0436

Open the permit page

$2,000
Aug 25, 2022Completed
final sign-off Dec 2022
425 Market StSiemens Industry, Inc.1/f:fire alarm only to add 5 modules and 1 door release station for interface with the (e) 2 way comm system. no ref permit application.
Details
Permit
202208251215
Permit issued
Aug 25, 2022
Final sign-off
Dec 19, 2022

1/f:fire alarm only to add 5 modules and 1 door release station for interface with the (e) 2 way comm system. no ref permit application.

Open the permit page

$3,000
Jun 15, 2021Never finaled
issued Jun 2021, no final
425 Market StSkyline Construction13/f: rev to pa20201207382 to show new and existing card readers and updated door schedule. maher n/a
Details
Permit
202106152438
Permit issued
Jun 22, 2021

13/f: rev to pa20201207382 to show new and existing card readers and updated door schedule. maher n/a

Open the permit page

Aug 6, 2019Completed
final sign-off Jan 2020
425 Market StR.M.R. Construction Companysuite 970: construct a new tenant demising wall to split an (e) suite into 2 suites, suite 970 is too be occupied during construction, the new suite 9755 is to be occupied until completion of future tenant work per a-b-017
Details
Permit
201908067946
Permit issued
Aug 21, 2019
Final sign-off
Jan 23, 2020

suite 970: construct a new tenant demising wall to split an (e) suite into 2 suites, suite 970 is too be occupied during construction, the new suite 9755 is to be occupied until completion of future tenant work per a-b-017

Open the permit page

$64,800
Nov 2, 2016Completed
final sign-off Nov 2016
425 Market StAyoob & Peery Plumbing Co Inc2nd fl relocate 1 sprinkler to conform with the new wall ceiling layout of the tenant improvement
Details
Permit
201611021710
Permit issued
Nov 3, 2016
Final sign-off
Nov 8, 2016

2nd fl relocate 1 sprinkler to conform with the new wall ceiling layout of the tenant improvement

Open the permit page

$203
Sep 30, 2016Never finaled
issued Sep 2016, no final
425 Market Ststreet space
Details
Permit
M727007
Permit issued
Sep 30, 2016

street space

Open the permit page

Jul 21, 2016Never finaled
issued Jul 2016, no final
425 Market Ststreet space
Details
Permit
M707407
Permit issued
Jul 22, 2016

street space

Open the permit page

Mar 17, 2015Completed
final sign-off May 2015
425 Market StSiemens Industry, Inc.fire alarm work for the "alvarez & marsal" ti. remodel on flr 18; additions are 7 smoke detectors, 13 duct detectors, 1 speaker, 37 speaker/strobes, 7 strobes, and 4 door holders ref pa# 2014 1223 4360 maher - not req'd
Details
Permit
201503171023
Permit issued
Apr 2, 2015
Final sign-off
May 11, 2015

fire alarm work for the "alvarez & marsal" ti. remodel on flr 18; additions are 7 smoke detectors, 13 duct detectors, 1 speaker, 37 speaker/strobes, 7 strobes, and 4 door holders ref pa# 2014 1223 4360 maher - not req'd

Open the permit page

$28,500
Feb 17, 2015Completed
final sign-off Aug 2015
425 Market StNovo Construction Inc17th floor - revision to apl #2014.1117.1658: omit structural work associated with operable partition, minor aesthetic charged fo rvalue enginering, add (3) power/data outlets. mechanical infrigment statement for both applications--
Details
Permit
201502178477
Permit issued
Mar 24, 2015
Final sign-off
Aug 24, 2015

17th floor - revision to apl #2014.1117.1658: omit structural work associated with operable partition, minor aesthetic charged fo rvalue enginering, add (3) power/data outlets. mechanical infrigment statement for both applications--

Open the permit page

Nov 17, 2014Completed
final sign-off Sep 2015
425 Market StNovo Construction Inc17th flr: tenant improvement demo existing walls, new finishes, new offices, toilet room upgrades, new ceiling, mep modifications; maher n/a
Details
Permit
201411171658
Permit issued
Dec 8, 2014
Final sign-off
Sep 1, 2015

17th flr: tenant improvement demo existing walls, new finishes, new offices, toilet room upgrades, new ceiling, mep modifications; maher n/a

Open the permit page

$1,300,000
May 19, 2014Never finaled
issued May 2014, no final
425 Market Ststreet space
Details
Permit
M489287
Permit issued
May 19, 2014

street space

Open the permit page

Apr 21, 2014Never finaled
issued Apr 2014, no final
425 Market Ststreet space
Details
Permit
M481427
Permit issued
Apr 21, 2014

street space

Open the permit page

Apr 15, 2014Completed
final sign-off Oct 2014
425 Market StGci, Incnon-structural demo, (n) non structural partitions, ceiling & lighting, finishes, millwork, mep. no change in occupancy, use or area. life safety sep. permits n/a ordinance #155-13.
Details
Permit
201404153219
Permit issued
Apr 18, 2014
Final sign-off
Oct 30, 2014

non-structural demo, (n) non structural partitions, ceiling & lighting, finishes, millwork, mep. no change in occupancy, use or area. life safety sep. permits n/a ordinance #155-13.

Open the permit page

$1,785,000
Jan 8, 2014Never finaled
issued Jan 2014, no final
425 Market Ststreet space
Details
Permit
M456067
Permit issued
Jan 8, 2014

street space

Open the permit page

Jun 19, 2013Never finaled
issued Jun 2013, no final
425 Market Ststreet space
Details
Permit
M402467
Permit issued
Jun 19, 2013

street space

Open the permit page

Apr 12, 2013Never finaled
issued Apr 2013, no final
425 Market Ststreet space
Details
Permit
M385167
Permit issued
Apr 12, 2013

street space

Open the permit page

Mar 1, 2013Completed
final sign-off Jul 2013
425 Market StGolden Gate Fire Protection Inc23rd floor: fire sprinkler upgrade for tenant improvement, relocate 217 pendents, add 51 uprights, t.i. # 201301037194
Details
Permit
201303011283
Permit issued
Mar 1, 2013
Final sign-off
Jul 5, 2013

23rd floor: fire sprinkler upgrade for tenant improvement, relocate 217 pendents, add 51 uprights, t.i. # 201301037194

Open the permit page

$138,020
Feb 13, 2013Never finaled
issued Feb 2013, no final
425 Market Ststreet space permit
Details
Permit
M371368
Permit issued
Feb 13, 2013

street space permit

Open the permit page

Oct 24, 2012Completed
final sign-off Dec 2012
425 Market StPribuss Engineering Incnew fire sprinklers and piping grid on 15th floor. addition of 198 sprinkler heads, new pipe bracing. t.i. pa # 201209210383
Details
Permit
201210242688
Permit issued
Oct 24, 2012
Final sign-off
Dec 21, 2012

new fire sprinklers and piping grid on 15th floor. addition of 198 sprinkler heads, new pipe bracing. t.i. pa # 201209210383

Open the permit page

$101,985
Oct 1, 2012Never finaled
issued Oct 2012, no final
425 Market Ststreetspac
Details
Permit
M350650
Permit issued
Oct 1, 2012

streetspac

Open the permit page

Jan 9, 2012Completed
final sign-off Jan 2012
425 Market StAnderson, Rowe & Buckley, Inc.19th floor tenant improvenets existing fire sprinkler system. relocate (4) sprinklers.
Details
Permit
201201091858
Permit issued
Jan 9, 2012
Final sign-off
Jan 27, 2012

19th floor tenant improvenets existing fire sprinkler system. relocate (4) sprinklers.

Open the permit page

$2,000
Oct 13, 2011Completed
final sign-off Oct 2012
425 Market StBcci Construction Companyinterior tenant improvement including demo, drywall, ceiling work, doors, finishes, and millwork
Details
Permit
201110136718
Permit issued
Oct 13, 2011
Final sign-off
Oct 25, 2012

interior tenant improvement including demo, drywall, ceiling work, doors, finishes, and millwork

Open the permit page

$300,000
Aug 10, 2011Completed
final sign-off Jul 2012
425 Market StRichlen Constructionrevision to pa# 2010.03.29.9157. enlarge (e) fcc room, relocate annuciator panel. any electrical. fire sprinkler or life safety upgraded or relocated accordingly at ground floor.
Details
Permit
201108102178
Permit issued
Aug 12, 2011
Final sign-off
Jul 17, 2012

revision to pa# 2010.03.29.9157. enlarge (e) fcc room, relocate annuciator panel. any electrical. fire sprinkler or life safety upgraded or relocated accordingly at ground floor.

Open the permit page

$45,000
Jul 6, 2011Never finaled
issued Jul 2011, no final
425 Market Ststreet space permit
Details
Permit
M271587
Permit issued
Jul 6, 2011

street space permit

Open the permit page

Feb 11, 2011Completed
final sign-off Jul 2012
425 Market StRichlen Constructionrevision to app#201003299157. showing turnstyles in detail.
Details
Permit
201102110083
Permit issued
Feb 23, 2011
Final sign-off
Jul 17, 2012

revision to app#201003299157. showing turnstyles in detail.

Open the permit page

Jan 4, 2011Never finaled
issued Jan 2011, no final
425 Market Ststreet space and mta parking
Details
Permit
M235246
Permit issued
Jan 4, 2011

street space and mta parking

Open the permit page

Oct 5, 2010Completed
final sign-off Jul 2012
425 Market StRichlen Constructionlobby: arch. permit #201003299157 glazing permit. install new glazing on lobby on both plaza side and fremont street with (2) revolving door on each side & one set double doors. title 24 energy calcs. (envelope) under permit #201003299157.
Details
Permit
201010052279
Permit issued
Oct 6, 2010
Final sign-off
Jul 17, 2012

lobby: arch. permit #201003299157 glazing permit. install new glazing on lobby on both plaza side and fremont street with (2) revolving door on each side & one set double doors. title 24 energy calcs. (envelope) under permit #201003299157.

Open the permit page

Jul 12, 2010Never finaled
issued Jul 2010, no final
425 Market Ststreet space
Details
Permit
M210547
Permit issued
Jul 12, 2010

street space

Open the permit page

May 20, 2010Completed
final sign-off Mar 2013
425 Market StRichlen Constructionarch. permit #201003299157 mep permit; demo lighting, hvac. install thermostats, 3-slot diffusers, return air dampers, controls, pressure heads, (n) lighting, 4-(n) drains for plumbing. life safety & fire sprinkler under separate permit.
Details
Permit
201005202876
Permit issued
May 20, 2010
Final sign-off
Mar 8, 2013

arch. permit #201003299157 mep permit; demo lighting, hvac. install thermostats, 3-slot diffusers, return air dampers, controls, pressure heads, (n) lighting, 4-(n) drains for plumbing. life safety & fire sprinkler under separate permit.

Open the permit page

$470,000
May 11, 2010Completed
final sign-off Nov 2010
425 Market StR.M.R. Construction Companyremove selective gyp bd partition and relocate 1 set door/frame/sidelite. new ceiling ht gyp bd partition and framed glazing. selective elec work and remove 2 ceiling 2x4 light fix
Details
Permit
201005112138
Permit issued
May 21, 2010
Final sign-off
Nov 2, 2010

remove selective gyp bd partition and relocate 1 set door/frame/sidelite. new ceiling ht gyp bd partition and framed glazing. selective elec work and remove 2 ceiling 2x4 light fix

Open the permit page

$9,000
Mar 29, 2010Completed
final sign-off Jul 2012
425 Market StRichlen Construction(n) interior lobby (ground floor only) finishes; (n) ext. grd flr lobby glazing; mep, fire life safety & lobby glazing structural under separate permit
Details
Permit
201003299157
Permit issued
Apr 19, 2010
Final sign-off
Jul 17, 2012

(n) interior lobby (ground floor only) finishes; (n) ext. grd flr lobby glazing; mep, fire life safety & lobby glazing structural under separate permit

Open the permit page

$2,000,000
May 27, 2009Completed
final sign-off Aug 2009
425 Market StHathaway Dinwiddie Co.t.i. at 32nd fl: provide 1 hour rating to existing idf room, replace existing non-rated door w/ new rated dor, add cooling heat pumps to existing idf rooms.
Details
Permit
200905279161
Permit issued
Jun 3, 2009
Final sign-off
Aug 20, 2009

t.i. at 32nd fl: provide 1 hour rating to existing idf room, replace existing non-rated door w/ new rated dor, add cooling heat pumps to existing idf rooms.

Open the permit page

$45,000
Oct 14, 2008Completed
final sign-off Oct 2008
425 Market StAnderson, Rowe & Buckley, Inc.t.i.at 13th fl: provements to the existing fire sprinkler system. 1 new, 9 relocated.
Details
Permit
200810144019
Permit issued
Oct 14, 2008
Final sign-off
Oct 23, 2008

t.i.at 13th fl: provements to the existing fire sprinkler system. 1 new, 9 relocated.

Open the permit page

$2,000
May 29, 2008Completed
final sign-off Oct 2008
425 Market St27th fl, full fl tenant improvement, consisting of limited demo partition, new trainging rm, storage rm and open office areas w/ new finishes in limited areas, no work to existing corredor, demising wall w/ minor upgrades to existing toilet fms, no structural work or change to building envelope.
Details
Permit
200805293154
Permit issued
May 29, 2008
Final sign-off
Oct 9, 2008

27th fl, full fl tenant improvement, consisting of limited demo partition, new trainging rm, storage rm and open office areas w/ new finishes in limited areas, no work to existing corredor, demising wall w/ minor upgrades to existing toilet fms, no structural work or change to building envelope.

Open the permit page

$100,000
May 6, 2008Completed
final sign-off May 2008
425 Market Stumbrella permit, compliance with high rise sprinkler ordinance #377-93 ; no work
Details
Permit
200805061449
Permit issued
May 6, 2008
Final sign-off
May 7, 2008

umbrella permit, compliance with high rise sprinkler ordinance #377-93 ; no work

Open the permit page

Aug 31, 2007Never finaled
issued Aug 2007, no final
425 Market Ststreet space permit
Details
Permit
M84445
Permit issued
Aug 31, 2007

street space permit

Open the permit page

Jun 29, 2007Never finaled
issued Jun 2007, no final
425 Market Ststreet space permit
Details
Permit
M75467
Permit issued
Jun 29, 2007

street space permit

Open the permit page

Jan 19, 2007Expired or cancelled
expired Sep 2007
425 Market Stoti-1 rev. 22nd fl.
Details
Permit
200701192048
Permit issued
Jan 19, 2007

oti-1 rev. 22nd fl.

Open the permit page

$50
Sep 15, 2006Never finaled
issued Sep 2006, no final
425 Market Ststreet space and sidwalk permit
Details
Permit
M41983
Permit issued
Sep 15, 2006

street space and sidwalk permit

Open the permit page

Oct 21, 2003Completed
final sign-off Dec 2004
425 Market StSkyline Constructionoti-3 18th floor el
Details
Permit
200310218102
Permit issued
Dec 12, 2003
Final sign-off
Dec 14, 2004

oti-3 18th floor el

Open the permit page

$25,000
Nov 21, 2002Completed
final sign-off Oct 2003
425 Market StPribuss Engineering Incmodify (e) fire sprinkler system, relocate (e) srpinkler heads and add sprinkler heads
Details
Permit
200211211977
Permit issued
Nov 21, 2002
Final sign-off
Oct 16, 2003

modify (e) fire sprinkler system, relocate (e) srpinkler heads and add sprinkler heads

Open the permit page

$8,100
Feb 20, 2002Completed
final sign-off Apr 2002
425 Market StSkyline Constructionrelocate (3) heads and install (2) new heads on the 24th floor
Details
Permit
200202209530
Permit issued
Feb 20, 2002
Final sign-off
Apr 30, 2002

relocate (3) heads and install (2) new heads on the 24th floor

Open the permit page

$2,000
Feb 8, 2000Completed
final sign-off Dec 2000
425 Market StHathaway Dinwiddie Co.oti-3 16th fl, sp
Details
Permit
200002081330
Permit issued
Mar 6, 2000
Final sign-off
Dec 26, 2000

oti-3 16th fl, sp

Open the permit page

$20,000
Jan 11, 2000Completed
final sign-off Dec 2000
425 Market StHathaway Dinwiddie Co.oti 1 14th floor, el, me, ls & sp
Details
Permit
20000111765
Permit issued
Jan 26, 2000
Final sign-off
Dec 26, 2000

oti 1 14th floor, el, me, ls & sp

Open the permit page

$600,000
Jan 11, 2000Completed
final sign-off Dec 2000
425 Market Stoti 2 16th floor, me, el & ls
Details
Permit
20000111763
Permit issued
Mar 3, 2000
Final sign-off
Dec 26, 2000

oti 2 16th floor, me, el & ls

Open the permit page

$600,000
Jan 11, 2000Completed
final sign-off Dec 2000
425 Market Stoti 2 14th floor, el & me
Details
Permit
20000111768
Permit issued
Jan 27, 2000
Final sign-off
Dec 26, 2000

oti 2 14th floor, el & me

Open the permit page

$600,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Richlen Construction (5), Gci, Inc (3), Hathaway Dinwiddie Co. (3), Skyline Construction (3), Anderson, Rowe & Buckley, Inc. (2), Novo Construction Inc (2), Pribuss Engineering Inc (2), R.M.R. Construction Company (2), Siemens Industry, Inc. (2), Ayoob & Peery Plumbing Co Inc, Bcci Construction Company, Golden Gate Fire Protection Inc, Pyro-Comm Systems, Inc.
Architects
John Thiele (3), Michael E. Nolan (2), Smithgroup Arch & Engineer (2), George S Soskin, Melissa Pesci, Michael Castro, Omied Arvin
Engineers
Ajmani & Pamidi Inc, Douglas Street, Laurens Vaneveld, Patrick Buscovich, Richard Dreyer
Authorized agents
Amit Wadhwa
Designers
Pyro-Comm Systems, Inc.