Permit GraphShortlistSan Francisco building permits since 2000

Kenneth Huesby

License
593668
State contractor license record
Listed as
authorized agent-others, contractor
Firm
Hillhouse Construction Company Inc
Based in
San Jose
On San Francisco permits
Dec 2003 to Sep 2026

70 permits since 2000 (contractor on 70 permits, authorized agent-others on 1 permit): 44 completed, 20 in progress, 4 never finaled, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 22, 2026In progress
issued Oct 2026
2323 Sacramento StHillhouse Construction Company Increvision to pa# 202401083567. technical infeasibility for garage entrance. new signage.
Details
Permit
202609228476
Status
issued
Filed
Sep 22, 2026
Permit issued
Oct 5, 2026
Declared cost
$70
Address
2323 Sacramento St

revision to pa# 202401083567. technical infeasibility for garage entrance. new signage.

Open the permit page

$70
Sep 16, 2026In progress
issued Sep 2026
149 New Montgomery StHillhouse Construction Company Incdeferred mechancial + electrical for pa# 202606183556.
Details
Permit
202609168187
Status
issued
Filed
Sep 16, 2026
Permit issued
Sep 24, 2026
Declared cost
$339,411
Address
149 New Montgomery St

deferred mechancial + electrical for pa# 202606183556.

Open the permit page

$339,411
Aug 13, 2026In progress
issued Aug 2026
149 New Montgomery StHillhouse Construction Company Incdeferred mep for 202512111568
Details
Permit
202608136531
Status
issued
Filed
Aug 13, 2026
Permit issued
Aug 17, 2026
Declared cost
$160,000
Address
149 New Montgomery St

deferred mep for 202512111568

Open the permit page

$160,000
Aug 5, 2026In progress
issued Aug 2026
149 New Montgomery StHillhouse Construction Company Increvisoin 202512111568 and ref 202605111058 to docuemnt removal of all grade restrooms on 6th floor
Details
Permit
202608056138
Status
issued
Filed
Aug 5, 2026
Permit issued
Aug 11, 2026
Address
149 New Montgomery St

revisoin 202512111568 and ref 202605111058 to docuemnt removal of all grade restrooms on 6th floor

Open the permit page

Jul 24, 2026In progress
filed Jul 2026, not yet issued
145 New Montgomery StHillhouse Construction Company Incground floor: select demolition of one bay of storefront and semi-circular overhang above new replacement entry with pilaster details, header and crest, new entry door and door hardware. replocation of existing lights in the soffit.
Details
Permit
202607245565
Status
filed
Filed
Jul 24, 2026
Declared cost
$200,000
Address
145 New Montgomery St

ground floor: select demolition of one bay of storefront and semi-circular overhang above new replacement entry with pilaster details, header and crest, new entry door and door hardware. replocation of existing lights in the soffit.

Open the permit page

$200,000
Jul 24, 2026In progress
issued Aug 2026
149 New Montgomery StHillhouse Construction Company Incroof to 2nd/f: installation of new building vrf mechanical system and vertical pipe distribution, including rated floor patching and non-rated furring partitions from roof to 2nd/f.
Details
Permit
202607245564
Status
issued
Filed
Jul 24, 2026
Permit issued
Aug 3, 2026
Declared cost
$1,193,158
Address
149 New Montgomery St

roof to 2nd/f: installation of new building vrf mechanical system and vertical pipe distribution, including rated floor patching and non-rated furring partitions from roof to 2nd/f.

Open the permit page

$1,193,158
Jul 21, 2026Completed
final sign-off Sep 2026
600 Montgomery StHillhouse Construction Company Increvision to 202512111506, consist of 3 new interior doors. permit also establishes the employee breakroom use in lieu of a service kitchen.
Details
Permit
202607215320
Status
complete
Filed
Jul 21, 2026
Permit issued
Jul 22, 2026
Final sign-off
Sep 18, 2026
Address
600 Montgomery St

revision to 202512111506, consist of 3 new interior doors. permit also establishes the employee breakroom use in lieu of a service kitchen.

Open the permit page

Jul 8, 2026Completed
final sign-off Sep 2026
600 Montgomery StHillhouse Construction Company Incmep revision for permit 202602256448. alterations in panel and smoke damper schedules & emergency door push botton and additional door security device.
Details
Permit
202607084717
Status
complete
Filed
Jul 8, 2026
Permit issued
Jul 14, 2026
Final sign-off
Sep 18, 2026
Declared cost
$1,000
Address
600 Montgomery St

mep revision for permit 202602256448. alterations in panel and smoke damper schedules & emergency door push botton and additional door security device.

Open the permit page

$1,000
Jun 18, 2026In progress
issued Jun 2026
149 New Montgomery StHillhouse Construction Company Incnew partitions for mail room and securiety desk area on gr fl for common building lobby. new furring, floor and wall finishes for lobby, hallway and elevator lobby, new lighting basis of design in area of work. no changes to exterior or historic fabric- mep deferred.
Details
Permit
202606183556
Status
issued
Filed
Jun 18, 2026
Permit issued
Jun 25, 2026
Declared cost
$350,000
Address
149 New Montgomery St

new partitions for mail room and securiety desk area on gr fl for common building lobby. new furring, floor and wall finishes for lobby, hallway and elevator lobby, new lighting basis of design in area of work. no changes to exterior or historic fabric- mep deferred.

Open the permit page

$350,000
May 27, 2026In progress
issued Jun 2026
600 Montgomery StHillhouse Construction Company Inc18 floor: structural revison to bpa: 202512111506 and mep 202602256448 - upadate to the centralized ups system anchorage.
Details
Permit
202605271986
Status
issued
Filed
May 27, 2026
Permit issued
Jun 11, 2026
Address
600 Montgomery St

18 floor: structural revison to bpa: 202512111506 and mep 202602256448 - upadate to the centralized ups system anchorage.

Open the permit page

May 11, 2026In progress
issued Jun 2026
149 New Montgomery StHillhouse Construction Company Increlocate main building lobby for 149 new montogomery. select demo of partitions, millwork, and electrical for core and shell work. flooring level and layout adjustments revision to ground floor storefront including new lobby entry door and infill of previous cafe entry with insulated safety glass
Details
Permit
202605111060
Status
issued
Filed
May 11, 2026
Permit issued
Jun 9, 2026
Declared cost
$250,000
Address
149 New Montgomery St

relocate main building lobby for 149 new montogomery. select demo of partitions, millwork, and electrical for core and shell work. flooring level and layout adjustments revision to ground floor storefront including new lobby entry door and infill of previous cafe entry with insulated safety glass

Open the permit page

$250,000
May 11, 2026In progress
issued Jun 2026
149 New Montgomery StHillhouse Construction Company Incroof floor-revision 202512111568- replace roof membrane throughout roof drainage, cricketing and waterproofing to perform new work. roof framingstructural upgrade at area of work. upgrade and extend elevator at roof
Details
Permit
202605111058
Status
issued
Filed
May 11, 2026
Permit issued
Jun 8, 2026
Address
149 New Montgomery St

roof floor-revision 202512111568- replace roof membrane throughout roof drainage, cricketing and waterproofing to perform new work. roof framingstructural upgrade at area of work. upgrade and extend elevator at roof

Open the permit page

May 5, 2026Completed
final sign-off Jul 2026
149 New Montgomery StHillhouse Construction Company Incdeferred mep for 202603177710 for new cafe at ground fl
Details
Permit
202605050702
Status
complete
Filed
May 5, 2026
Permit issued
May 8, 2026
Final sign-off
Jul 21, 2026
Declared cost
$186,900
Address
149 New Montgomery St

deferred mep for 202603177710 for new cafe at ground fl

Open the permit page

$186,900
Mar 17, 2026Completed
final sign-off Jul 2026
149 New Montgomery StHillhouse Construction Company Incselect demo of non structural partition, doors, tile ceiling, relocation of existing cafe, new mill work, equpiment, finishes and gypsum board soffit, no exterior work, mep deferred. change of use from ground floor retail to cafe.
Details
Permit
202603177710
Status
complete
Filed
Mar 17, 2026
Permit issued
Apr 10, 2026
Final sign-off
Jul 21, 2026
Declared cost
$288,125
Address
149 New Montgomery St

select demo of non structural partition, doors, tile ceiling, relocation of existing cafe, new mill work, equpiment, finishes and gypsum board soffit, no exterior work, mep deferred. change of use from ground floor retail to cafe.

Open the permit page

$288,125
Feb 25, 2026Completed
final sign-off Apr 2026
149 New Montgomery StHillhouse Construction Company Incnon-structural interior demolition on floors 4,5, and 6 per ab-017
Details
Permit
202602256450
Status
complete
Filed
Feb 25, 2026
Permit issued
Mar 9, 2026
Final sign-off
Apr 30, 2026
Declared cost
$250,000
Address
149 New Montgomery St

non-structural interior demolition on floors 4,5, and 6 per ab-017

Open the permit page

$250,000
Feb 25, 2026In progress
issued Apr 2026
600 Montgomery StHillhouse Construction Company Inc18/fl- ref 202512111506- deffered engineering scope for ti meps
Details
Permit
202602256448
Status
issued
Filed
Feb 25, 2026
Permit issued
Apr 15, 2026
Declared cost
$450,000
Address
600 Montgomery St

18/fl- ref 202512111506- deffered engineering scope for ti meps

Open the permit page

$450,000
Feb 3, 2026In progress
issued Feb 2026
2311 Taraval StHillhouse Construction Company Increvision 202311301659 and ref 202506209135- basement layout reconfiguration to include wall reconfiguration at 1st floor due to drinking fountain. door 124 changed to 3 sectional sliding door, door 125 changed to sliding door, exposed mechanical duct at room 202
Details
Permit
202602035160
Status
issued
Filed
Feb 3, 2026
Permit issued
Feb 12, 2026
Declared cost
$1,500
Address
2311 Taraval St

revision 202311301659 and ref 202506209135- basement layout reconfiguration to include wall reconfiguration at 1st floor due to drinking fountain. door 124 changed to 3 sectional sliding door, door 125 changed to sliding door, exposed mechanical duct at room 202

Open the permit page

$1,500
Dec 18, 2025In progress
issued Mar 2026
2311 Taraval StHillhouse Construction Company Incproposed roof screen to be raised additional 3' (change the top elevation of the roof screen from 21'-7" to 24'-7"). revision to 2023-1130-1659
Details
Permit
202512182182
Status
issued
Filed
Dec 18, 2025
Permit issued
Mar 6, 2026
Declared cost
$160,123
Address
2311 Taraval St

proposed roof screen to be raised additional 3' (change the top elevation of the roof screen from 21'-7" to 24'-7"). revision to 2023-1130-1659

Open the permit page

$160,123
Dec 11, 2025In progress
issued Feb 2026
600 Montgomery StHillhouse Construction Company Incinterior demolition and construction of interior partitions. mep deferred to separate permit.pantry and coffee point to be defered permit. 18th fl. no food scope in this permit. deferred submisison for health scope will be sent for review at a later date.
Details
Permit
202512111506
Status
issued
Filed
Dec 11, 2025
Permit issued
Feb 20, 2026
Declared cost
$2,095,830
Address
600 Montgomery St

interior demolition and construction of interior partitions. mep deferred to separate permit.pantry and coffee point to be defered permit. 18th fl. no food scope in this permit. deferred submisison for health scope will be sent for review at a later date.

Open the permit page

$2,095,830
Dec 11, 2025In progress
issued Apr 2026
149 New Montgomery StHillhouse Construction Company Increlocate (e) rooftop mechanical equipment in area of work , remove skylight in area of work, upgrade and extend (e) elevator to rooftop, reconfigure and extend (e) exit stair areas at 6th floor to roof, create (n) occupied roofdeck area, new counter area, exterior lighting, guard rails, roof
Details
Permit
202512111568
Status
issued
Filed
Dec 11, 2025
Permit issued
Apr 6, 2026
Declared cost
$800,000
Address
149 New Montgomery St

relocate (e) rooftop mechanical equipment in area of work , remove skylight in area of work, upgrade and extend (e) elevator to rooftop, reconfigure and extend (e) exit stair areas at 6th floor to roof, create (n) occupied roofdeck area, new counter area, exterior lighting, guard rails, roof

Open the permit page

$800,000
Nov 19, 2025Expired or cancelled
withdrawn Sep 2026
2323 Sacramento StHillhouse Construction Company Increvision to permit 202401083567. remove existing cement plaster and install new gypsum sheathing and cement plaster. install new wood siding.
Details
Permit
202511190005
Status
withdrawn
Filed
Nov 19, 2025
Declared cost
$15,000
Address
2323 Sacramento St

revision to permit 202401083567. remove existing cement plaster and install new gypsum sheathing and cement plaster. install new wood siding.

Open the permit page

$15,000
Oct 10, 2025In progress
issued Oct 2025
2323 Sacramento StHillhouse Construction Company Increvision to 202401083567: swapping out e) concrete column for a steel column for feasibility of construction
Details
Permit
202510107201
Status
issued
Filed
Oct 10, 2025
Permit issued
Oct 29, 2025
Declared cost
$40,000
Address
2323 Sacramento St

revision to 202401083567: swapping out e) concrete column for a steel column for feasibility of construction

Open the permit page

$40,000
Jul 14, 2025In progress
issued Jan 2026
2311 Taraval StHillhouse Construction Company Increvision pa#:20231131659 &202506209135 is upgrading the facility to oshpd3 with new architect of record with the following change:(1)additional staff restroom doors at patient restrooms to be swinging outword to meet oshpd 3 requirement resulting relocation of the proposed drinking fountain,
Details
Permit
202506209135
Status
issued
Filed
Jul 14, 2025
Permit issued
Jan 15, 2026
Declared cost
$10,000
Address
2311 Taraval St

revision pa#:20231131659 &202506209135 is upgrading the facility to oshpd3 with new architect of record with the following change:(1)additional staff restroom doors at patient restrooms to be swinging outword to meet oshpd 3 requirement resulting relocation of the proposed drinking fountain,

Open the permit page

$10,000
Jul 1, 2025In progress
issued Jul 2025
2323 Sacramento StHillhouse Construction Company Increvision to 202401083567. voluntary strengthening to (e) concrete columns in basement via steel jacketing, 10 columns in total
Details
Permit
202507019874
Status
issued
Filed
Jul 1, 2025
Permit issued
Jul 10, 2025
Declared cost
$48,000
Address
2323 Sacramento St

revision to 202401083567. voluntary strengthening to (e) concrete columns in basement via steel jacketing, 10 columns in total

Open the permit page

$48,000
Jan 8, 2024In progress
issued Oct 2024
2323 Sacramento StHillhouse Construction Company Incchange of use and occupancy: prov. a senior res. care facility. basement:1 ada parking and renovate existing kitchen, laundry room and admin areas.1/f: provide 12 sleeping units,medical office, dining room,reception. 2/f:provide 17 sleeping units,activity/nursing room. total capacity 29 units/39 bed
Details
Permit
202401083567
Status
issued
Filed
Jan 8, 2024
Permit issued
Oct 15, 2024
Declared cost
$5,000,000
Address
2323 Sacramento St

change of use and occupancy: prov. a senior res. care facility. basement:1 ada parking and renovate existing kitchen, laundry room and admin areas.1/f: provide 12 sleeping units,medical office, dining room,reception. 2/f:provide 17 sleeping units,activity/nursing room. total capacity 29 units/39 bed

Open the permit page

$5,000,000
Nov 30, 2023In progress
issued Dec 2024
2311 Taraval StHillhouse Construction Company Incti: basement, ground & mezz. selective demo of non-bearing partitions, doors, and ceilings. new scope incl: partitions; ceiling, lighting, finishes; reduction of (e)mezz; new basement electrical room; mep and civil. struc. scope: shear walls. ext scope: new storefront sys, infill of (e) openings,
Details
Permit
202311301659
Status
issued
Filed
Nov 30, 2023
Permit issued
Dec 9, 2024
Declared cost
$1,149,608
Address
2311 Taraval St

ti: basement, ground & mezz. selective demo of non-bearing partitions, doors, and ceilings. new scope incl: partitions; ceiling, lighting, finishes; reduction of (e)mezz; new basement electrical room; mep and civil. struc. scope: shear walls. ext scope: new storefront sys, infill of (e) openings,

Open the permit page

$1,149,608
Aug 7, 2023Completed
final sign-off Sep 2024
1430 Taraval StHillhouse Construction Company Increvision to pa# 202211176713 (phase 1) & 202212148342 (phase 2). structural only. revisons on elevator rail support (hss column) location.
Details
Permit
202308073891
Status
complete
Filed
Aug 7, 2023
Permit issued
Aug 8, 2023
Final sign-off
Sep 25, 2024
Address
1430 Taraval St

revision to pa# 202211176713 (phase 1) & 202212148342 (phase 2). structural only. revisons on elevator rail support (hss column) location.

Open the permit page

May 12, 2023Completed
final sign-off Sep 2024
1430 Taraval StHillhouse Construction Company Incpermit revision to #202211176713, no change of scope of work; revision includes floor plan layout changed at room #108, 109, 102. updated exit diagram and egress calculations; minor changes include partition and millwork details, and associated mep changes.
Details
Permit
202305127695
Status
complete
Filed
May 12, 2023
Permit issued
May 31, 2023
Final sign-off
Sep 25, 2024
Address
1430 Taraval St

permit revision to #202211176713, no change of scope of work; revision includes floor plan layout changed at room #108, 109, 102. updated exit diagram and egress calculations; minor changes include partition and millwork details, and associated mep changes.

Open the permit page

Nov 17, 2022Completed
final sign-off Apr 2025
1430 Taraval StHillhouse Construction Company Incdemo interior, new partitions, ceiling, mechanical, electrical, plumbing, new elevator pit, new entry door. new elevator to be under seperate permit.
Details
Permit
202211176713
Status
complete
Filed
Nov 17, 2022
Permit issued
Mar 30, 2023
Final sign-off
Apr 14, 2025
Declared cost
$625,000
Address
1430 Taraval St

demo interior, new partitions, ceiling, mechanical, electrical, plumbing, new elevator pit, new entry door. new elevator to be under seperate permit.

Open the permit page

$625,000
Jun 29, 2021Completed
final sign-off Sep 2021
600 Battery StHillhouse Construction Company Increvision to bpa 202009023304. minor adjustment to roof deck area, guardrail location changed and minor structural modifications.
Details
Permit
202106293398
Status
complete
Filed
Jun 29, 2021
Permit issued
Jun 29, 2021
Final sign-off
Sep 24, 2021
Declared cost
$10,000
Address
600 Battery St

revision to bpa 202009023304. minor adjustment to roof deck area, guardrail location changed and minor structural modifications.

Open the permit page

$10,000
Mar 1, 2021Completed
final sign-off Sep 2021
600 Battery StHillhouse Construction Company Incadd a few accent light fixtures to new lobby finishes
Details
Permit
202103015547
Status
complete
Filed
Mar 1, 2021
Permit issued
Jun 15, 2021
Final sign-off
Sep 24, 2021
Declared cost
$20,000
Address
600 Battery St

add a few accent light fixtures to new lobby finishes

Open the permit page

$20,000
Mar 1, 2021Completed
final sign-off Sep 2021
600 Battery StHillhouse Construction Company Increnovate lighting & power & lighting for new roof deck renovation permit #2020-0902-3304.
Details
Permit
202103015583
Status
complete
Filed
Mar 1, 2021
Permit issued
May 13, 2021
Final sign-off
Sep 24, 2021
Declared cost
$65,000
Address
600 Battery St

renovate lighting & power & lighting for new roof deck renovation permit #2020-0902-3304.

Open the permit page

$65,000
Feb 5, 2021Completed
final sign-off Jul 2021
600 Battery StHillhouse Construction Company Incrooftop exhaust fan relocation (for restrooms). ref t.i. pa202009023304. maher n/a
Details
Permit
202102054115
Status
complete
Filed
Feb 5, 2021
Permit issued
Apr 19, 2021
Final sign-off
Jul 23, 2021
Declared cost
$15,000
Address
600 Battery St

rooftop exhaust fan relocation (for restrooms). ref t.i. pa202009023304. maher n/a

Open the permit page

$15,000
Nov 20, 2020Completed
final sign-off Aug 2021
600 Battery StHillhouse Construction Company Inc1,2,3 flrs: demo of non-structural & non load bearing interior partitions including walls, glazing, doors & finishes on flr 1, 2 & 3. no structural demo. seperate permit issued for ti work. not to be occupied until completion of ti work per ab 017.
Details
Permit
202011209443
Status
complete
Filed
Nov 20, 2020
Permit issued
Jan 4, 2021
Final sign-off
Aug 31, 2021
Declared cost
$239,455
Address
600 Battery St

1,2,3 flrs: demo of non-structural & non load bearing interior partitions including walls, glazing, doors & finishes on flr 1, 2 & 3. no structural demo. seperate permit issued for ti work. not to be occupied until completion of ti work per ab 017.

Open the permit page

$239,455
Oct 21, 2020Completed
final sign-off Jun 2021
301 De Montfort AvHillhouse Construction Company Incremove temporary stairs installed under pa 2015 1006 8907
Details
Permit
202010217041
Status
complete
Filed
Oct 21, 2020
Permit issued
Feb 3, 2021
Final sign-off
Jun 30, 2021
Declared cost
$4,500
Address
301 De Montfort Av

remove temporary stairs installed under pa 2015 1006 8907

Open the permit page

$4,500
Sep 2, 2020Completed
final sign-off Nov 2021
600 Battery StHillhouse Construction Company Incpartial renovations & non-structural demo of roof deck and new lobby doors on ground floor.
Details
Permit
202009023304
Status
complete
Filed
Sep 2, 2020
Permit issued
Dec 17, 2020
Final sign-off
Nov 4, 2021
Declared cost
$1,875,000
Address
600 Battery St

partial renovations & non-structural demo of roof deck and new lobby doors on ground floor.

Open the permit page

$1,875,000
Aug 31, 2020Completed
final sign-off Aug 2021
600 Battery StHillhouse Construction Company Incdemo extg non-structural lobby finishes and construct new lobby finishes.
Details
Permit
202008313000
Status
complete
Filed
Aug 31, 2020
Permit issued
Dec 15, 2020
Final sign-off
Aug 30, 2021
Declared cost
$750,000
Address
600 Battery St

demo extg non-structural lobby finishes and construct new lobby finishes.

Open the permit page

$750,000
Aug 31, 2020Completed
final sign-off Oct 2021
600 Battery StHillhouse Construction Company Incada upgrade and path of travel upgrade for primary entrance.
Details
Permit
202008312997
Status
complete
Filed
Aug 31, 2020
Permit issued
Dec 15, 2020
Final sign-off
Oct 6, 2021
Declared cost
$170,466
Address
600 Battery St

ada upgrade and path of travel upgrade for primary entrance.

Open the permit page

$170,466
Jan 2, 2019Completed
final sign-off Feb 2019
635 14th AvHillhouse Construction Company Incinterior evacuation signage only. ref app#201710312729 (rev 2)
Details
Permit
201901029437
Status
complete
Filed
Jan 2, 2019
Permit issued
Jan 2, 2019
Final sign-off
Feb 27, 2019
Declared cost
$3,500
Address
635 14th Av

interior evacuation signage only. ref app#201710312729 (rev 2)

Open the permit page

$3,500
Oct 22, 2018Completed
final sign-off Mar 2019
635 14th AvHillhouse Construction Company Incnew ada parking stall, curb and ramp to replace existing, located in private parking lot. ref pa 2017-1031-2729 rev 2
Details
Permit
201810223761
Status
complete
Filed
Oct 22, 2018
Permit issued
Nov 5, 2018
Final sign-off
Mar 20, 2019
Declared cost
$4,500
Address
635 14th Av

new ada parking stall, curb and ramp to replace existing, located in private parking lot. ref pa 2017-1031-2729 rev 2

Open the permit page

$4,500
Jun 29, 2018Completed
final sign-off Mar 2019
635 14th AvHillhouse Construction Company Incmechanical & plumbing for pa 2017-1031-2729 - new rooftop units serving gym & new fan coil units throuhgout 1st and 2nd floors
Details
Permit
201806293351
Status
complete
Filed
Jun 29, 2018
Permit issued
Jul 10, 2018
Final sign-off
Mar 20, 2019
Declared cost
$750,000
Address
635 14th Av

mechanical & plumbing for pa 2017-1031-2729 - new rooftop units serving gym & new fan coil units throuhgout 1st and 2nd floors

Open the permit page

$750,000
Jun 26, 2018Completed
final sign-off Mar 2019
635 14th AvHillhouse Construction Company Increvision to 201710312729 structural - shearwall, load bearing wall and footings. no mep or life safety
Details
Permit
201806262922
Status
complete
Filed
Jun 26, 2018
Permit issued
Jul 3, 2018
Final sign-off
Mar 20, 2019
Declared cost
$65,000
Address
635 14th Av

revision to 201710312729 structural - shearwall, load bearing wall and footings. no mep or life safety

Open the permit page

$65,000
Apr 19, 2018Expired or cancelled
cancelled Jan 2026
635 14th AvHillhouse Construction Company Incmech equipment replacement (fan coil units exhauset fans) plumbing work to support revised toilet rooms. ref# 201710312729
Details
Permit
201804196832
Status
cancelled
Filed
Apr 19, 2018
Declared cost
$800,000
Address
635 14th Av

mech equipment replacement (fan coil units exhauset fans) plumbing work to support revised toilet rooms. ref# 201710312729

Open the permit page

$800,000
Mar 14, 2018Completed
final sign-off Mar 2019
635 14th AvHillhouse Construction Company Incdemo only permit including removal of interior non-load bearing partitions. electrical plmg, casework, finishes and restroom fixtures. this permit filed under ab-017 for unoccupied bldg. arch permit on seperate permit app#201710312729
Details
Permit
201803143656
Status
complete
Filed
Mar 14, 2018
Permit issued
Mar 15, 2018
Final sign-off
Mar 20, 2019
Address
635 14th Av

demo only permit including removal of interior non-load bearing partitions. electrical plmg, casework, finishes and restroom fixtures. this permit filed under ab-017 for unoccupied bldg. arch permit on seperate permit app#201710312729

Open the permit page

Oct 31, 2017Completed
final sign-off Mar 2019
635 14th AvHillhouse Construction Company Incimprovements to (e) school bldg & property. scope incl interior improvements, (n) exterior exit balcony&ada access upgrades. (n)automatic sprinkler sys,voice fire alarm &mep under separate permit.
Details
Permit
201710312729
Status
complete
Filed
Oct 31, 2017
Permit issued
Jun 21, 2018
Final sign-off
Mar 20, 2019
Declared cost
$1,250,000
Address
635 14th Av

improvements to (e) school bldg & property. scope incl interior improvements, (n) exterior exit balcony&ada access upgrades. (n)automatic sprinkler sys,voice fire alarm &mep under separate permit.

Open the permit page

$1,250,000
Oct 30, 2017Completed
final sign-off Jan 2018
1837 Union StHillhouse Construction Company Incscope is to add (n) furred walls @ perimeter and prep location for wall of tv monitors. revision to pa 2017-0911-7528 & 2017-1003-0211
Details
Permit
201710302632
Status
complete
Filed
Oct 30, 2017
Permit issued
Oct 30, 2017
Final sign-off
Jan 8, 2018
Declared cost
$5,000
Address
1837 Union St

scope is to add (n) furred walls @ perimeter and prep location for wall of tv monitors. revision to pa 2017-0911-7528 & 2017-1003-0211

Open the permit page

$5,000
Oct 3, 2017Completed
final sign-off Jan 2018
1837 Union StHillhouse Construction Company Increvision to pa#201709117528 to remove bearing wall and adjust restroom.
Details
Permit
201710030211
Status
complete
Filed
Oct 3, 2017
Permit issued
Oct 3, 2017
Final sign-off
Jan 8, 2018
Address
1837 Union St

revision to pa#201709117528 to remove bearing wall and adjust restroom.

Open the permit page

Sep 11, 2017Completed
final sign-off Jan 2018
1837 Union StHillhouse Construction Company Incremoval of non stuctural prtitions and doors, includes elec/plumbing. update finishe and lighting. update restroom for ada accessibility. change of use from retail to health services. (invisaligh)
Details
Permit
201709117528
Status
complete
Filed
Sep 11, 2017
Permit issued
Sep 20, 2017
Final sign-off
Jan 8, 2018
Declared cost
$136,976
Address
1837 Union St

removal of non stuctural prtitions and doors, includes elec/plumbing. update finishe and lighting. update restroom for ada accessibility. change of use from retail to health services. (invisaligh)

Open the permit page

$136,976
Mar 27, 2017Completed
final sign-off Feb 2020
1520 Stockton StHillhouse Construction Company Incvoluntary seismic upgrade in 6 story commercial building. work limited to front facing facade
Details
Permit
201703272445
Status
complete
Filed
Mar 27, 2017
Permit issued
Sep 7, 2018
Final sign-off
Feb 3, 2020
Declared cost
$1,300,000
Address
1520 Stockton St

voluntary seismic upgrade in 6 story commercial building. work limited to front facing facade

Open the permit page

$1,300,000
Aug 18, 2016Completed
final sign-off Oct 2016
301 De Montfort AvHillhouse Construction Company Increvision to app#201510068907. revision to number of wall anchors on temporary stair.
Details
Permit
201608185418
Status
complete
Filed
Aug 18, 2016
Permit issued
Aug 18, 2016
Final sign-off
Oct 5, 2016
Address
301 De Montfort Av

revision to app#201510068907. revision to number of wall anchors on temporary stair.

Open the permit page

Jun 24, 2016Completed
final sign-off Apr 2017
333 Eucalyptus DrHillhouse Construction Company Increvision to (e) pa#201512044176, provide lockers, lighting, flooring @ existing locker rooms.
Details
Permit
201606240869
Status
complete
Filed
Jun 24, 2016
Permit issued
Jun 28, 2016
Final sign-off
Apr 12, 2017
Declared cost
$165,000
Address
333 Eucalyptus Dr

revision to (e) pa#201512044176, provide lockers, lighting, flooring @ existing locker rooms.

Open the permit page

$165,000
Mar 29, 2016Completed
final sign-off Dec 2016
919 Clement StHillhouse Construction Company Incwaterproofing of existing building, plaster finish over existing brick to be removed.
Details
Permit
201603293310
Status
complete
Filed
Mar 29, 2016
Permit issued
Apr 7, 2016
Final sign-off
Dec 6, 2016
Declared cost
$35,000
Address
919 Clement St

waterproofing of existing building, plaster finish over existing brick to be removed.

Open the permit page

$35,000
Feb 29, 2016Never finaled
issued Feb 2016, no final
919 Clement StHillhouse Construction Company Incstructural repair of concrete column
Details
Permit
201602290777
Status
issued
Filed
Feb 29, 2016
Permit issued
Feb 29, 2016
Declared cost
$9,000
Address
919 Clement St

structural repair of concrete column

Open the permit page

$9,000
Dec 4, 2015Never finaled
issued Dec 2015, no final
919 Clement StHillhouse Construction Company Increvision to pa #201505055431: structural strengthenibg to existing roof framing of approx. 38'x20' area.
Details
Permit
201512044259
Status
issued
Filed
Dec 4, 2015
Permit issued
Dec 28, 2015
Declared cost
$8,000
Address
919 Clement St

revision to pa #201505055431: structural strengthenibg to existing roof framing of approx. 38'x20' area.

Open the permit page

$8,000
Oct 6, 2015Completed
final sign-off Oct 2016
301 De Montfort AvHillhouse Construction Company Increplace (e) window with an exit door and add new temporary stair from 2nd floor to play area for emergency egress.
Details
Permit
201510068907
Status
complete
Filed
Oct 6, 2015
Permit issued
Jun 16, 2016
Final sign-off
Oct 5, 2016
Declared cost
$25,000
Address
301 De Montfort Av

replace (e) window with an exit door and add new temporary stair from 2nd floor to play area for emergency egress.

Open the permit page

$25,000
May 5, 2015Completed
final sign-off Dec 2016
919 Clement StHillhouse Construction Company Incdemo interior finishes, light fixture, millwork, plumbing fixture, walls, doors, electrical. (n) glass conference room, office system, finishes, light fixtures, doors, millwork, plumbing fixtures. (e) restroom altered to be accessible.
Details
Permit
201505055431
Status
complete
Filed
May 5, 2015
Permit issued
Nov 5, 2015
Final sign-off
Dec 6, 2016
Declared cost
$455,000
Address
919 Clement St

demo interior finishes, light fixture, millwork, plumbing fixture, walls, doors, electrical. (n) glass conference room, office system, finishes, light fixtures, doors, millwork, plumbing fixtures. (e) restroom altered to be accessible.

Open the permit page

$455,000
Feb 19, 2015Never finaled
issued Mar 2015, no final
150 Greenwich StHillhouse Construction Company Incsuite 120: revision to app#201310179488 to change toilet 128 to storage 128. ref app#201310179488. n/a for the maher.
Details
Permit
201502198704
Status
issued
Filed
Feb 19, 2015
Permit issued
Mar 19, 2015
Declared cost
$65,000
Address
150 Greenwich St

suite 120: revision to app#201310179488 to change toilet 128 to storage 128. ref app#201310179488. n/a for the maher.

Open the permit page

$65,000
Dec 16, 2014Never finaled
issued Mar 2015, no final
150 Greenwich StHillhouse Construction Company Incti for lobby of e athletic club on gr fl and mezz. includes new partitions staircase, glass guards, flooring. mep & fire sep permit. no exterior work maher not required
Details
Permit
201412163863
Status
issued
Filed
Dec 16, 2014
Permit issued
Mar 19, 2015
Declared cost
$325,000
Address
150 Greenwich St

ti for lobby of e athletic club on gr fl and mezz. includes new partitions staircase, glass guards, flooring. mep & fire sep permit. no exterior work maher not required

Open the permit page

$325,000
Sep 23, 2013Completed
final sign-off Dec 2014
2055 Union StHillhouse Construction Company Incinterior tenant improvement to the fitness club. installation of juice bar and retail sales on ground floor. fire alarm & sprinklers on separate permit. ** maher: compliance with ordinance no# 155-13 not required **
Details
Permit
201309237503
Status
complete
Filed
Sep 23, 2013
Permit issued
Sep 11, 2014
Final sign-off
Dec 31, 2014
Declared cost
$165,000
Address
2055 Union St

interior tenant improvement to the fitness club. installation of juice bar and retail sales on ground floor. fire alarm & sprinklers on separate permit. ** maher: compliance with ordinance no# 155-13 not required **

Open the permit page

$165,000
Aug 16, 2013Completed
final sign-off Oct 2013
2030 Union StHillhouse Construction Company Inc1st floor-remodel restroom for accessibility compliance. revision to pa# 2013-0522-7675
Details
Permit
201308164582
Status
complete
Filed
Aug 16, 2013
Permit issued
Aug 19, 2013
Final sign-off
Oct 8, 2013
Declared cost
$40,000
Address
2030 Union St

1st floor-remodel restroom for accessibility compliance. revision to pa# 2013-0522-7675

Open the permit page

$40,000
Jul 31, 2013Completed
final sign-off Nov 2013
1601 Lane StHillhouse Construction Company Incremodel (e) fitness rooms & change (e) storage room into new shower rooms & 09
Details
Permit
201307313274
Status
complete
Filed
Jul 31, 2013
Permit issued
Aug 7, 2013
Final sign-off
Nov 7, 2013
Declared cost
$90,000
Address
1601 Lane St

remodel (e) fitness rooms & change (e) storage room into new shower rooms & 09

Open the permit page

$90,000
Jun 18, 2013Completed
final sign-off Nov 2013
1601 Lane StHillhouse Construction Company Inct.i. improvement of extg space to accommodate new child care center with/ stair down to street per fire requirement.
Details
Permit
201306189860
Status
complete
Filed
Jun 18, 2013
Permit issued
Aug 7, 2013
Final sign-off
Nov 15, 2013
Declared cost
$75,000
Address
1601 Lane St

t.i. improvement of extg space to accommodate new child care center with/ stair down to street per fire requirement.

Open the permit page

$75,000
May 22, 2013Completed
final sign-off Oct 2013
2030 Union StHillhouse Construction Company Incchange a retail space to a temparoy office space to sale personal membership for one year. non strutrual partition, minor demo of shelving, flooring and finishes.
Details
Permit
201305227675
Status
complete
Filed
May 22, 2013
Permit issued
Jul 10, 2013
Final sign-off
Oct 8, 2013
Declared cost
$40,000
Address
2030 Union St

change a retail space to a temparoy office space to sale personal membership for one year. non strutrual partition, minor demo of shelving, flooring and finishes.

Open the permit page

$40,000
May 20, 2013Completed
final sign-off Feb 2014
1550 Bryant StHillhouse Construction Company Incremove 2 ladders at 12th floor deck. install patio heater. revision to application #201302120041; compliance with ord 155-13 not required
Details
Permit
201305207371
Status
complete
Filed
May 20, 2013
Permit issued
Feb 12, 2014
Final sign-off
Feb 13, 2014
Address
1550 Bryant St

remove 2 ladders at 12th floor deck. install patio heater. revision to application #201302120041; compliance with ord 155-13 not required

Open the permit page

May 7, 2013Completed
final sign-off Oct 2013
1550 Bryant StHillhouse Construction Company Incconstruct cafe and food prep area at ground floor lobby.
Details
Permit
201305076343
Status
complete
Filed
May 7, 2013
Permit issued
Jul 18, 2013
Final sign-off
Oct 8, 2013
Declared cost
$30,000
Address
1550 Bryant St

construct cafe and food prep area at ground floor lobby.

Open the permit page

$30,000
Mar 21, 2013Completed
final sign-off Jun 2014
2055 Union StHillhouse Construction Company Incinterior t.i. to fitness club. work to include new offices, laundry room, lounge, locker rooms, spa, steam room & mep on floors 1 through 4. core & shell, change of use & historic preservation approved under pa# 2012/08/01/6283.
Details
Permit
201303212733
Status
complete
Filed
Mar 21, 2013
Permit issued
Jan 21, 2014
Final sign-off
Jun 3, 2014
Declared cost
$2,000,000
Address
2055 Union St

interior t.i. to fitness club. work to include new offices, laundry room, lounge, locker rooms, spa, steam room & mep on floors 1 through 4. core & shell, change of use & historic preservation approved under pa# 2012/08/01/6283.

Open the permit page

$2,000,000
Aug 26, 2009Completed
final sign-off Mar 2010
300 Montgomery StHillhouse Construction Company Inc3rd fl. minor demolition & construction of 3rd floor elevator lobbies & partial corridor. mep & fire sprinkler under separate permit.
Details
Permit
200908265566
Status
complete
Filed
Aug 26, 2009
Permit issued
Sep 18, 2009
Final sign-off
Mar 5, 2010
Declared cost
$87,687
Address
300 Montgomery St

3rd fl. minor demolition & construction of 3rd floor elevator lobbies & partial corridor. mep & fire sprinkler under separate permit.

Open the permit page

$87,687
Aug 20, 2009Completed
final sign-off Mar 2010
300 Montgomery StHillhouse Construction Company Inc3rd floor t.i. revision to appl #200904146220 - add second exit door at back of space. build 1-hr exit corridor at main entry. delete plan check comment to install smoke guard at passenger elevator doors.
Details
Permit
200908205241
Status
complete
Filed
Aug 20, 2009
Permit issued
Aug 20, 2009
Final sign-off
Mar 5, 2010
Declared cost
$16,500
Address
300 Montgomery St

3rd floor t.i. revision to appl #200904146220 - add second exit door at back of space. build 1-hr exit corridor at main entry. delete plan check comment to install smoke guard at passenger elevator doors.

Open the permit page

$16,500
Apr 14, 2009Completed
final sign-off Mar 2010
300 Montgomery StHillhouse Construction Company Inct.i. at 3rd fl: remodel existing vacant office space, const new offices, confer rm, reception/exhibit area, staff rm, upgrade toilets to comply w/ ada, demo at pa 200808229899, mech, elect sprinkler, life safety under separate permits.
Details
Permit
200904146220
Status
complete
Filed
Apr 14, 2009
Permit issued
Jul 6, 2009
Final sign-off
Mar 5, 2010
Declared cost
$476,000
Address
300 Montgomery St

t.i. at 3rd fl: remodel existing vacant office space, const new offices, confer rm, reception/exhibit area, staff rm, upgrade toilets to comply w/ ada, demo at pa 200808229899, mech, elect sprinkler, life safety under separate permits.

Open the permit page

$476,000
Dec 15, 2003Completed
final sign-off Aug 2004
3951 Alemany BlHillhouse Construction Company Incthis permit incl arch floor plans missing under 200308111751 and for temp occupancy on 10/20/03.
Details
Permit
200312152318
Status
complete
Filed
Dec 15, 2003
Permit issued
Dec 17, 2003
Final sign-off
Aug 9, 2004
Address
3951 Alemany Bl

this permit incl arch floor plans missing under 200308111751 and for temp occupancy on 10/20/03.

Open the permit page