| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 25, 2014 | Completed final sign-off Apr 2014 | 500 Terry A. Francois Bl | Pacific Auxiliary Fire Alarm | add 1 smoke detector, 32 horn strobes, 4 strobes, 2 modules, and 2 power supplies, relocate 1 existing smoke dector due to 2 tenant improvement on the 6th floor. ref building permit 2014-0123-6908Details
add 1 smoke detector, 32 horn strobes, 4 strobes, 2 modules, and 2 power supplies, relocate 1 existing smoke dector due to 2 tenant improvement on the 6th floor. ref building permit 2014-0123-6908 | $27,000 |
| Jan 23, 2014 | Completed final sign-off Apr 2014 | 500 Terry A. Francois Bl | Principal Builders Inc. | 6th floor t.i. to construct new partitions, doors, millwork finishes and flooring. mep included. n/a for maher ordinance no. 155-13Details
6th floor t.i. to construct new partitions, doors, millwork finishes and flooring. mep included. n/a for maher ordinance no. 155-13 | $1,400,000 |
| Dec 6, 2013 | Never finaled issued Dec 2013, no final | 550 Terry A. Francois Bl | Pacific Auxiliary Fire Alarm | add 5 smoke detectors, 3 plenum mount smoke detectors, 61 horn strobes, 1`5 strobes, 7 modules, 2 power supplies for ti on 2nd fl. ref bldg#201310119141.Details
add 5 smoke detectors, 3 plenum mount smoke detectors, 61 horn strobes, 1`5 strobes, 7 modules, 2 power supplies for ti on 2nd fl. ref bldg#201310119141. | $56,000 |
| Apr 15, 2013 | Completed final sign-off Oct 2013 | 500 Terry A. Francois Bl | Sobrato Construction Company | 6th floor-provide exterior rooftop deck & fence on 5th floor roof. private screen hvac equipment from 6th floor office spaceDetails
6th floor-provide exterior rooftop deck & fence on 5th floor roof. private screen hvac equipment from 6th floor office space | $300,000 |
| Mar 1, 2013 | Completed final sign-off Jun 2013 | 500 Terry A. Francois Bl | Devcon Construction | provide carpet and paint at 2 extg unfinished stair walls.Details
provide carpet and paint at 2 extg unfinished stair walls. | $200,000 |
| Jan 3, 2011 | Completed final sign-off Mar 2011 | 550 Terry A. Francois Bl | Ayoob & Peery Plumbing Co Inc | add and relocate fire sprinkler heads for tenant improvment. 5th fl: 144 add, 80 relocate. 6th fl: 202 adds, 41 relocateDetails
add and relocate fire sprinkler heads for tenant improvment. 5th fl: 144 add, 80 relocate. 6th fl: 202 adds, 41 relocate | $240,038 |
| Oct 28, 2010 | Completed final sign-off Nov 2010 | 550 Terry A. Francois Bl | Ayoob & Peery Plumbing Co Inc | 3rd, 4th & 5th floors-add, relocate & removed fire sprinkler heads per t.i. 3rd fl-add 4, relocate 9. 4th fl-add 3, relocate 37, remove 2. 5th fl-relocate 8Details
3rd, 4th & 5th floors-add, relocate & removed fire sprinkler heads per t.i. 3rd fl-add 4, relocate 9. 4th fl-add 3, relocate 37, remove 2. 5th fl-relocate 8 | $11,000 |
| Jan 28, 2010 | Completed final sign-off Mar 2010 | 550 Terry A. Francois Bl | Swinerton Builders | 2nd floor-interior tenant improvement for single tenant, selective demo, partitions, doors, lighting fixture relocation, store fixture relocation. separate permit, if required, for fire protection and hvac.Details
2nd floor-interior tenant improvement for single tenant, selective demo, partitions, doors, lighting fixture relocation, store fixture relocation. separate permit, if required, for fire protection and hvac. | $102,658 |
| Nov 5, 2008 | Never finaled issued Dec 2008, no final | 500 Terry A. Francois Bl | Turner Construction Co | roof tenant cooling tower addition.Details
roof tenant cooling tower addition. | $580,000 |
| Mar 18, 2008 | Completed final sign-off Apr 2008 | 500 Terry A. Francois Bl | revision to pa# 2000-0712-4981s3. design clarifications for chiller installationDetails
revision to pa# 2000-0712-4981s3. design clarifications for chiller installation | $17,000 | |
| Sep 18, 2007 | Completed final sign-off Apr 2008 | 500 Terry A. Francois Bl | install new non-life safety generator on roof.Details
install new non-life safety generator on roof. | $115,000 | |
| Jun 18, 2007 | Completed final sign-off Apr 2008 | 500 Terry A. Francois Bl | Pacific Auxiliary Fire Alarm | installation of new fire alarm system.Details
installation of new fire alarm system. | $120,000 |
| May 3, 2007 | Completed final sign-off Apr 2008 | 500 Terry A. Francois Bl | Swinerton Builders | temporary tower crane for construction of 6 story building.Details
temporary tower crane for construction of 6 story building. | $24,000 |
| Oct 28, 2004 | Completed final sign-off Oct 2004 | 1555 03rd St | renew demolition permit pa 200108146002- for final inspectionDetails
renew demolition permit pa 200108146002- for final inspection | ||
| Aug 14, 2001 | Expired or cancelled expired Oct 2004 | 1555 03rd St | Silverado Contractors Inc | to demolish concrete batch plantDetails
to demolish concrete batch plant | |
| Nov 7, 2000 | Expired or cancelled expired Jan 2002 | 1000 04th St | Marinship Construction | grading-develop interim drainage/erosion control devices-inlets, basins & pipes until permanent deviDetails
grading-develop interim drainage/erosion control devices-inlets, basins & pipes until permanent devi | $80,000 |
| Jul 25, 2000 | Never finaled filed Jul 2000, never issued | 500 Terry A. Francois Bl | record purposes only-approval by sffd of phased installation- low pressure water system-mission bayDetails
record purposes only-approval by sffd of phased installation- low pressure water system-mission bay | ||
| Jul 12, 2000 | Completed final sign-off Apr 2008 | 500 Terry A. Francois Bl | Swinerton Builders | construct office & retail supporting useDetails
construct office & retail supporting use | $33,000,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Pacific Auxiliary Fire Alarm (3), Swinerton Builders (3), Ayoob & Peery Plumbing Co Inc (2), Devcon Construction, Marinship Construction, Principal Builders Inc., Silverado Contractors Inc, Sobrato Construction Company, Turner Construction Co
- Architects
- Al Johansen, Amit Wadhwa & Assoc, John Duquette, Kuppe Sprinivas
- Engineers
- Kuppe Srinvas
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.