David Coyle
- License
- 38155
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Interface Engineering
- Based in
- San Francisco
- On San Francisco permits
- Oct 2019 to Jan 2020
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Bana Construction Inc, C B 2 Builders Incorporated
- Architects
- David Hecht, Michael Stanton, Priti Lund
- Engineers
- Wesley S. Lau (2), Geoffrey Bomba, Kirk Johnston, Nathan Wittasek, Thomas De Senna
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 24, 2020 | Completed final sign-off Jul 2021 | 200 Larkin St | C B 2 Builders Incorporated | construction of a temporary art installation w/in an (e) gallery space. work include temporary partitions, floor & ceiling finishes and modifications to (e) air conditioning and lighting systemsDetails
construction of a temporary art installation w/in an (e) gallery space. work include temporary partitions, floor & ceiling finishes and modifications to (e) air conditioning and lighting systems | $1,000,000 |
| Oct 10, 2019 | Completed final sign-off Jan 2021 | 430 California St | Bana Construction Inc | scope of work includeds the partial rmeodel of e level 1, b1, & b3, including selective wall dmeo & installation of new doors & walls for fitness room, locker room & bike storage. fire sprinkler under separate permit. exterior scope reference permit #201805310546. maher naDetails
scope of work includeds the partial rmeodel of e level 1, b1, & b3, including selective wall dmeo & installation of new doors & walls for fitness room, locker room & bike storage. fire sprinkler under separate permit. exterior scope reference permit #201805310546. maher na | $1,634,000 |