Wesley S. Lau

License
E22027
Electrical engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up E22027 at the Board for Professional Engineers
Listed as
engineer
Firm
Interface Engineering
Based in
San Francisco
On San Francisco permits
Dec 2018 to Apr 2026

15 permits since 2000 (engineer on 15 permits): 12 completed, 1 in progress, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Centric Construction Inc (4), Achill Beg Construction Inc (2), Nibbi Bros Assoc Inc. (2), Bana Construction Inc, C B 2 Builders Incorporated, Cahill Contractors Llc., Herrero Builders Incorporated, Pinnacle Constructing, Plant Construction Co, Lp
Architects
Jason Jones (4), Goldberg David William (2), Casey Feeser, David Hecht, John A. Chipman, Lev Weisbach, Megan Koehler, Michael Stanton, Priti Lund, Toby Stella Levy, W Liles
Engineers
Richard H. Russell (4), Eugene Tuan (3), Alina Yuen-Pui Carlson (2), David Clifton Mar (2), David Coyle (2), Mohit Kotecha (2), Thomas De Senna (2), Alix Kotkee, Geoffrey Bomba, Jason Lau, Kirk Johnston, Marc Press, Nathan Wittasek, Shawn Mclean, Xuong Quach, Yi-Shu Kung

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in. 1 of 15 have no building type on record and are shown as other.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Apr 30, 2026In progress
issued Jul 2026
1100 Van Ness AvHerrero Builders Incorporated14,500 gross sf interior build out of level 9 to support expanded clinical services in a non oshpd setting
Details
Permit
202604300418
Permit issued
Jul 15, 2026

14,500 gross sf interior build out of level 9 to support expanded clinical services in a non oshpd setting

Open the permit page

$2,900,000
Jun 24, 2025Completed
final sign-off Nov 2025
2000 Post StAchill Beg Construction Incretail space renovation to include selective demo. mep safe-off and removal of existing cafe finishes. electrical service upgrade to 200 amp service and installation of mini split system. frame out of eixting cmu walls. installation of new restroom access.
Details
Permit
202506249286
Permit issued
Jul 10, 2025
Final sign-off
Nov 3, 2025

retail space renovation to include selective demo. mep safe-off and removal of existing cafe finishes. electrical service upgrade to 200 amp service and installation of mini split system. frame out of eixting cmu walls. installation of new restroom access.

Open the permit page

$300,000
Nov 12, 2024Completed
final sign-off Oct 2026
3433 03rd StNibbi Bros Assoc Inc.to erect 2 story, no basement, type v-b, union meeting hall & office building. (a-3,b,s-2)
Details
Permit
202408148660
Permit issued
Mar 26, 2025
Final sign-off
Oct 9, 2026

to erect 2 story, no basement, type v-b, union meeting hall & office building. (a-3,b,s-2)

Open the permit page

$15,551,608
Nov 12, 2024Expired or cancelled
withdrawn Dec 2024
3433 03rd StNibbi Bros Assoc Inc.excavation, fill & grading of site located at 3433-03rd street in preparation for new construction of carpenter's union hall & offices.
Details
Permit
202410253723

excavation, fill & grading of site located at 3433-03rd street in preparation for new construction of carpenter's union hall & offices.

Open the permit page

$583,600
Sep 13, 2023Completed
final sign-off Jun 2025
388 Beale StAchill Beg Construction Inc4th fl - convert 1700 sf of storage area into an assembly area. area will consist of unfixed seating, tables, games and tv
Details
Permit
202309136504
Permit issued
Aug 22, 2024
Final sign-off
Jun 12, 2025

4th fl - convert 1700 sf of storage area into an assembly area. area will consist of unfixed seating, tables, games and tv

Open the permit page

$325,000
Jul 10, 2023Completed
final sign-off Nov 2023
829 Kearny StPinnacle Constructing1/f: mep work t.i. 202208241201.
Details
Permit
202307101814
Permit issued
Jul 14, 2023
Final sign-off
Nov 7, 2023

1/f: mep work t.i. 202208241201.

Open the permit page

$150,000
Oct 31, 2022Completed
final sign-off Oct 2023
450 Powell StCentric Construction Increvision to pa# 202108186642. 2nd fl: add beer coolet into scope. add equipment in warming kitchen.
Details
Permit
202210315581
Permit issued
Nov 28, 2022
Final sign-off
Oct 27, 2023

revision to pa# 202108186642. 2nd fl: add beer coolet into scope. add equipment in warming kitchen.

Open the permit page

$10,000
Mar 1, 2022Completed
final sign-off Nov 2023
450 Powell StCentric Construction Increvision to pa 202108317502. changes include modifications to guestrooms and layout for a partial remodel of an existing 21 story 419 room, tourist hotel.
Details
Permit
202203018943
Permit issued
Mar 30, 2022
Final sign-off
Nov 2, 2023

revision to pa 202108317502. changes include modifications to guestrooms and layout for a partial remodel of an existing 21 story 419 room, tourist hotel.

Open the permit page

Feb 4, 2022Completed
final sign-off Aug 2022
450 Powell StCentric Construction Increv to pa202107094114. changes include revised layouts for womens, mens and gender newtual bathrooms.
Details
Permit
202202047401
Permit issued
Mar 9, 2022
Final sign-off
Aug 19, 2022

rev to pa202107094114. changes include revised layouts for womens, mens and gender newtual bathrooms.

Open the permit page

Aug 18, 2021Completed
final sign-off Oct 2023
450 Powell StCentric Construction Inclower lobby lvl: construction of meeting room space. lobby lvl: n lighting/elec outlets, finishes & furniture. mezz lvl: renovate (e) kitchen, convert meeting space to kitch area, n finishes in (e) lounge area, n bar canopy, millwork/equip, n lighting & elec outlets. 2/f: n equip in kitchen area...
Details
Permit
202108186642
Permit issued
May 2, 2022
Final sign-off
Oct 27, 2023

lower lobby lvl: construction of meeting room space. lobby lvl: n lighting/elec outlets, finishes & furniture. mezz lvl: renovate (e) kitchen, convert meeting space to kitch area, n finishes in (e) lounge area, n bar canopy, millwork/equip, n lighting & elec outlets. 2/f: n equip in kitchen area...

Open the permit page

$2,000,000
Mar 22, 2021Completed
final sign-off Mar 2022
3200 California StCahill Contractors Llc.remove existing aquatics center humidifier and associated ductwork and piping, lighting over pool, and plenum wall.
Details
Permit
202103227021
Permit issued
May 18, 2021
Final sign-off
Mar 31, 2022

remove existing aquatics center humidifier and associated ductwork and piping, lighting over pool, and plenum wall.

Open the permit page

$10,000
Mar 11, 2020Expired or cancelled
withdrawn Mar 2021
755 Sansome St3rd fl - new ti of existing office space. no exterior work proposed. new floor, wall, ceiling, millwork & fixture finishes. new electrical & lighting. demo of (e) non bearing partitions w/limited ceiling construction. updated mep. no food/beverages or third party catering will be provided by the
Details
Permit
202003116803

3rd fl - new ti of existing office space. no exterior work proposed. new floor, wall, ceiling, millwork & fixture finishes. new electrical & lighting. demo of (e) non bearing partitions w/limited ceiling construction. updated mep. no food/beverages or third party catering will be provided by the

Open the permit page

$590,000
Jan 24, 2020Completed
final sign-off Jul 2021
200 Larkin StC B 2 Builders Incorporatedconstruction of a temporary art installation w/in an (e) gallery space. work include temporary partitions, floor & ceiling finishes and modifications to (e) air conditioning and lighting systems
Details
Permit
202001242713
Permit issued
Feb 20, 2020
Final sign-off
Jul 8, 2021

construction of a temporary art installation w/in an (e) gallery space. work include temporary partitions, floor & ceiling finishes and modifications to (e) air conditioning and lighting systems

Open the permit page

$1,000,000
Oct 10, 2019Completed
final sign-off Jan 2021
430 California StBana Construction Incscope of work includeds the partial rmeodel of e level 1, b1, & b3, including selective wall dmeo & installation of new doors & walls for fitness room, locker room & bike storage. fire sprinkler under separate permit. exterior scope reference permit #201805310546. maher na
Details
Permit
201910104117
Permit issued
Oct 29, 2019
Final sign-off
Jan 5, 2021

scope of work includeds the partial rmeodel of e level 1, b1, & b3, including selective wall dmeo & installation of new doors & walls for fitness room, locker room & bike storage. fire sprinkler under separate permit. exterior scope reference permit #201805310546. maher na

Open the permit page

$1,634,000
Dec 20, 2018Completed
final sign-off Dec 2020
2230 Jerrold AvPlant Construction Co, Lperect 2-story, type 5b, no basement, no dwelling unit, production kitchen & support building. maher n/a.
Details
Permit
201812208904
Permit issued
Jun 17, 2019
Final sign-off
Dec 2, 2020

erect 2-story, type 5b, no basement, no dwelling unit, production kitchen & support building. maher n/a.

Open the permit page

$10,471,820