Casey Feeser
- License
- C34087
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Levy Design Partner Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2025 to Nov 2026
3 permits since 2000 (architect on 3 permits): 1 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Achill Beg Construction Inc
- Engineers
- Fareed Himmati, Wesley Lau
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 12, 2026 | In progress filed Nov 2026, not yet issued | 988 Fulton St | restriping of off-street parking to convert (1) non accessible parking space into (1) standard accessible parking space. new parking signage. new truncated domes. to comply with nov 202654575Details
restriping of off-street parking to convert (1) non accessible parking space into (1) standard accessible parking space. new parking signage. new truncated domes. to comply with nov 202654575 | $2,500 | |
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 1137 Folsom St | convert (e) garage to lounge, laundry room, trash room, & egress corridor. (n) accessible common area toilet. remove (e) sink & ranges from individual hotel units. remove (e) shared bathrooms flrs 2-4. (n) bathrooms & wet bars to hotel units. combining smaller hotel units and replacing lost unit....Details
convert (e) garage to lounge, laundry room, trash room, & egress corridor. (n) accessible common area toilet. remove (e) sink & ranges from individual hotel units. remove (e) shared bathrooms flrs 2-4. (n) bathrooms & wet bars to hotel units. combining smaller hotel units and replacing lost unit.... | $1,200,000 | |
| Jun 24, 2025 | Completed final sign-off Nov 2025 | 2000 Post St | Achill Beg Construction Inc | retail space renovation to include selective demo. mep safe-off and removal of existing cafe finishes. electrical service upgrade to 200 amp service and installation of mini split system. frame out of eixting cmu walls. installation of new restroom access.Details
retail space renovation to include selective demo. mep safe-off and removal of existing cafe finishes. electrical service upgrade to 200 amp service and installation of mini split system. frame out of eixting cmu walls. installation of new restroom access. | $300,000 |