Geoffrey Bomba
- License
- S5455
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S5455 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Jan 2020 to Jun 2025
5 permits since 2000 (engineer on 5 permits): 4 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- C B 2 Builders Incorporated, Hathaway Dinwiddie Co., Romak Iron Works, Skyline Construction
- Architects
- Randall Dowler (2), David Hecht, Priti Lund, Rebecca C. Sharkey, Stanley Lew
- Engineers
- Jose Herrera (2), Benson Balan, David Coyle, Michael Shepherd, Nathan Wittasek, Wesley S. Lau
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 17, 2025 | Completed final sign-off Sep 2025 | 151 03rd St | Romak Iron Works | install structural strongbank support and ceiling monorailtrack in level 7 temp. exhibit gallery to support movable exhibit wall panels; const. & installation of movable wall panels; const. of temporary wall panels. scope only applies to layout on a2.2. additional changes require separate permit(s).Details
install structural strongbank support and ceiling monorailtrack in level 7 temp. exhibit gallery to support movable exhibit wall panels; const. & installation of movable wall panels; const. of temporary wall panels. scope only applies to layout on a2.2. additional changes require separate permit(s). | $197,000 |
| Oct 3, 2023 | Never finaled filed Oct 2023, never issued | 1800 Owens St | new condenser water unit & new vfd's on sector 1 roof with associated structural support. chilled water piping from new condenser unit will run in an existing shaft down to level 1. no architectural work proposed. all work is mep w/ structural.Details
new condenser water unit & new vfd's on sector 1 roof with associated structural support. chilled water piping from new condenser unit will run in an existing shaft down to level 1. no architectural work proposed. all work is mep w/ structural. | $200,000 | |
| Aug 18, 2023 | Completed final sign-off Dec 2025 | 1800 Owens St | Hathaway Dinwiddie Co. | mechanical & electrical work only to convert sector 1 & 3 service elevator to transport hazardous materials.Details
mechanical & electrical work only to convert sector 1 & 3 service elevator to transport hazardous materials. | $300,000 |
| Jan 12, 2021 | Completed final sign-off Oct 2025 | 828 Brannan St | Skyline Construction | interior walls and floor slab. new two story ground up base. building including exterior facade, elevator, stairs, and restrooms. renovation to (e) 2 story & mezzanine. rmove an interior mezzanine horizontally & vertically expand the 2nd floor & undertake interior & exteriorDetails
interior walls and floor slab. new two story ground up base. building including exterior facade, elevator, stairs, and restrooms. renovation to (e) 2 story & mezzanine. rmove an interior mezzanine horizontally & vertically expand the 2nd floor & undertake interior & exterior | $12,000,000 |
| Jan 24, 2020 | Completed final sign-off Jul 2021 | 200 Larkin St | C B 2 Builders Incorporated | construction of a temporary art installation w/in an (e) gallery space. work include temporary partitions, floor & ceiling finishes and modifications to (e) air conditioning and lighting systemsDetails
construction of a temporary art installation w/in an (e) gallery space. work include temporary partitions, floor & ceiling finishes and modifications to (e) air conditioning and lighting systems | $1,000,000 |