Block 3720, lot 008
400 Howard St
- City’s use
- Commercial Office
- Built
- 2008
- Stories
- 10
- Units
- 5
- Building
- 370,128 sq ft
- Lot
- 45,367 sq ft
- Zoning
- C3OSD
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
134 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2026 | In progress issued Sep 2026 | 400 Howard St | Novo Construction Inc | revision to pa#: 202606183492 to modify mechanical work on the 5th flr and add exterior louver.Details
revision to pa#: 202606183492 to modify mechanical work on the 5th flr and add exterior louver. | |
| Sep 25, 2026 | In progress issued Oct 2026 | 400 Howard St | Novo Construction Inc | revision to pa 202605121069 scope includes adding a fire rated corridor wall detail at the existing raised access floor. see ab-05 local equivalency request formDetails
revision to pa 202605121069 scope includes adding a fire rated corridor wall detail at the existing raised access floor. see ab-05 local equivalency request form | $6,000 |
| Sep 16, 2026 | In progress issued Sep 2026 | 400 Howard St | Novo Construction Inc | 6th fl - mechanical work for tenant improvement ref pa 202605121069Details
6th fl - mechanical work for tenant improvement ref pa 202605121069 | $28,000 |
| Aug 10, 2026 | In progress issued Aug 2026 | 400 Howard St | Novo Construction Inc | plumbing work t.i. on the 6th flr. ref#: 202605121069Details
plumbing work t.i. on the 6th flr. ref#: 202605121069 | $20,000 |
| Aug 10, 2026 | In progress issued Sep 2026 | 400 Howard St | Novo Construction Inc | plumbing work t.i. on the 5th flr. ref#: 202606183492Details
plumbing work t.i. on the 5th flr. ref#: 202606183492 | $20,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | 4th floor: electrical work for ti 202604219766. new power and signal dev.Details
4th floor: electrical work for ti 202604219766. new power and signal dev. | $25,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | 5th floor: electrical work for t.i. to include new power and signal devised throughout the space at 5th floor. ref pa #202604219807Details
5th floor: electrical work for t.i. to include new power and signal devised throughout the space at 5th floor. ref pa #202604219807 | $35,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | 6th floor: electrical work for t.i. servery to include new power and signal . new lighting and controls. ref arch. #202605121069Details
6th floor: electrical work for t.i. servery to include new power and signal . new lighting and controls. ref arch. #202605121069 | $275,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | 6th floor: electrical work for t.i. to include new power and signal devised throughout the space at 6th floor. ref pa #202604219806Details
6th floor: electrical work for t.i. to include new power and signal devised throughout the space at 6th floor. ref pa #202604219806 | $30,000 |
| Jul 23, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | mechanical work for tenant improvement on the 4th floor. ref.202604219766Details
mechanical work for tenant improvement on the 4th floor. ref.202604219766 | $125,000 |
| Jul 23, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | 5th floor: mechanical work for t.i. ref pa #202604219807Details
5th floor: mechanical work for t.i. ref pa #202604219807 | $125,000 |
| Jul 23, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | 6th floor: mechanical work for t.i. ref pa #202604219806Details
6th floor: mechanical work for t.i. ref pa #202604219806 | $125,000 |
| Jun 18, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | rev to pa# 2026-0421-9807: alteratin includes demo of 2 cofference rooms and existing millwork and construction of a prep room, janitor closet, and new millwork for break room and coffee stationDetails
rev to pa# 2026-0421-9807: alteratin includes demo of 2 cofference rooms and existing millwork and construction of a prep room, janitor closet, and new millwork for break room and coffee station | $19,596 |
| May 21, 2026 | Completed final sign-off Jun 2026 | 400 Howard St | Sc Builders, Inc | 4th fl - interior office improvement including demoing 1 wall to combine 2 offices into 1. new gyp board header and patching (e) finishes. no mepDetails
4th fl - interior office improvement including demoing 1 wall to combine 2 offices into 1. new gyp board header and patching (e) finishes. no mep | $7,050 |
| May 12, 2026 | In progress issued Jun 2026 | 400 Howard St | Novo Construction Inc | 6th fl, new dining hall tenant improvement, includes non-structural partitions, doors, lighting, millwork, plumbing, electrical, and finishes. mep deferred.Details
6th fl, new dining hall tenant improvement, includes non-structural partitions, doors, lighting, millwork, plumbing, electrical, and finishes. mep deferred. | $1,965,424 |
| Apr 21, 2026 | In progress issued May 2026 | 400 Howard St | Novo Construction Inc | 6th floor. addition of phone booths and work stations to existing office suite. alteration of existing idf room. new drinking fountains.Details
6th floor. addition of phone booths and work stations to existing office suite. alteration of existing idf room. new drinking fountains. | $215,720 |
| Apr 21, 2026 | In progress issued Jun 2026 | 400 Howard St | Novo Construction Inc | 4th floor. addition of phone booths and work stations to (e) suite on the 4th floor, infill of 1 (e) doorway at demising wall.Details
4th floor. addition of phone booths and work stations to (e) suite on the 4th floor, infill of 1 (e) doorway at demising wall. | $235,100 |
| Apr 21, 2026 | In progress issued May 2026 | 400 Howard St | Novo Construction Inc | 5th floor. addition of 58 phone booths and other work stations to existing office suite. alteration of existing idf room. new drinking fountains.Details
5th floor. addition of 58 phone booths and other work stations to existing office suite. alteration of existing idf room. new drinking fountains. | $365,040 |
| Apr 9, 2026 | Completed final sign-off Sep 2026 | 400 Howard St | R M I Mechanical Contractors | 4/fl- add 2 heat pumps, supply fan, exhaust fan, and 3 smoke dampers. (n) ductworks, condenser water piping, ceiling and sidewall grilles, 2 thermostats, and air balance. ref-202602196138Details
4/fl- add 2 heat pumps, supply fan, exhaust fan, and 3 smoke dampers. (n) ductworks, condenser water piping, ceiling and sidewall grilles, 2 thermostats, and air balance. ref-202602196138 | $150,000 |
| Apr 2, 2026 | In progress issued Apr 2026 | 400 Howard St | Novo Construction Inc | 5th & 6th/f men's & women's restroom remodel, floors are currently unoccupied, no changes to mech, sprinkler, or fire alarm system. electrical deferredDetails
5th & 6th/f men's & women's restroom remodel, floors are currently unoccupied, no changes to mech, sprinkler, or fire alarm system. electrical deferred | $741,472 |
| Mar 5, 2026 | Completed final sign-off May 2026 | 400 Howard St | Dpr Construction A | retrofit door (interior). install new door. (interior). small partition wall (interior)Details
retrofit door (interior). install new door. (interior). small partition wall (interior) | $25,000 |
| Feb 19, 2026 | Completed final sign-off Sep 2026 | 400 Howard St | Rudolph Commercial Interiors Inc, Rci | 4/f: new exercise room, lockers, showers and restroom, scope includes demo and construction of non structural partitions, ceiling, lighting and finishes changes to exterior windows to accomodate new mechanical louvers. mechanical deferred.Details
4/f: new exercise room, lockers, showers and restroom, scope includes demo and construction of non structural partitions, ceiling, lighting and finishes changes to exterior windows to accomodate new mechanical louvers. mechanical deferred. | $473,200 |
| Oct 21, 2025 | Completed final sign-off Nov 2025 | 400 Howard St | Martin Sign Co Inc. | the fabrication and installation of 5 acrylic evacuation maps.Details
the fabrication and installation of 5 acrylic evacuation maps. | $1,200 |
| Oct 14, 2025 | In progress issued Oct 2025 | 400 Howard St | Decker Electric Co Inc Electrical Contra | 4/f: revision to fire alarm system permit 202505307560. relocate existing smoke detectors devices as outlined in updated/revised fas permit drawings.Details
4/f: revision to fire alarm system permit 202505307560. relocate existing smoke detectors devices as outlined in updated/revised fas permit drawings. | $2,500 |
| Sep 30, 2025 | In progress issued Dec 2025 | 400 Howard St | Skanska Usa Building Inc | remove and replace a limited portion of the parking level 2 (p2) basement slab to permit repair of sewage ejector discharge pipe. work affects less than 100 sqft of basement slab. does not affect lateral force resisting system or overall gravity load carrying system ob building. repair is being treaDetails
remove and replace a limited portion of the parking level 2 (p2) basement slab to permit repair of sewage ejector discharge pipe. work affects less than 100 sqft of basement slab. does not affect lateral force resisting system or overall gravity load carrying system ob building. repair is being trea | $198,800 |
| Jul 9, 2025 | In progress issued Jul 2025 | 400 Howard St | Paganini Electric Corp(See Signatories) | 4th floor:modifications to existing fire alarm sytem 80 devices . fire alarm only 2025.0602.7719 202504023527Details
4th floor:modifications to existing fire alarm sytem 80 devices . fire alarm only 2025.0602.7719 202504023527 | $55,000 |
| Jun 2, 2025 | Completed final sign-off Oct 2025 | 400 Howard St | Sc Builders, Inc | 4th flr - permit revision to 202504023527 - deconfiguration of non-structural demising partitions, light fixtures of ceiling assembly, millwork, plumbing, power outlets and finishes and structuralDetails
4th flr - permit revision to 202504023527 - deconfiguration of non-structural demising partitions, light fixtures of ceiling assembly, millwork, plumbing, power outlets and finishes and structural | |
| May 30, 2025 | Completed final sign-off Jan 2026 | 400 Howard St | Rudolph Commercial Interiors Inc, Rci | 5th floor. interior non structural demolition of select partitions, ceilings, light fixtures, millwork, and finishes, unoccupied floor. the suite will remain unoccupied at the completion of the project. demo only, no build back.Details
5th floor. interior non structural demolition of select partitions, ceilings, light fixtures, millwork, and finishes, unoccupied floor. the suite will remain unoccupied at the completion of the project. demo only, no build back. | $20,000 |
| May 30, 2025 | In progress issued May 2025 | 400 Howard St | Decker Electric Co Inc Electrical Contra | electrical only revision to 4th floor office ti permit 202502190568.Details
electrical only revision to 4th floor office ti permit 202502190568. | |
| May 30, 2025 | Completed final sign-off Oct 2025 | 400 Howard St | Decker Electric Co Inc Electrical Contra | 4th/f: fire alarm only. consisting of notification devices, 8 speaker/strobe ref 202502190568 & 202503283334Details
4th/f: fire alarm only. consisting of notification devices, 8 speaker/strobe ref 202502190568 & 202503283334 | $35,000 |
| May 16, 2025 | Completed final sign-off Aug 2025 | 400 Howard St | R L H Fire Protection Inc | 4th fl ref pa # 2025-0402-3527 ti fire sprinkler add 48, relocate 124 and delete 7 fire sprinklersDetails
4th fl ref pa # 2025-0402-3527 ti fire sprinkler add 48, relocate 124 and delete 7 fire sprinklers | $60,000 |
| Apr 8, 2025 | Completed final sign-off Jul 2025 | 400 Howard St | R L H Fire Protection Inc | 4th fl ref pa # 2025-0219-0568 ti fire sprinkler add 12, relocate 28 and delete 8 fire spinklersDetails
4th fl ref pa # 2025-0219-0568 ti fire sprinkler add 12, relocate 28 and delete 8 fire spinklers | $13,500 |
| Apr 2, 2025 | Completed final sign-off Oct 2025 | 400 Howard St | Sc Builders, Inc | 4th fl t.i.work includes interoir non structural demo of partitons, light fixtures, ceiling assembly, millwork, plumbing and finishes. build back non structural demising partitons, light fixtures,ceiling assembly, power outlets, finishesDetails
4th fl t.i.work includes interoir non structural demo of partitons, light fixtures, ceiling assembly, millwork, plumbing and finishes. build back non structural demising partitons, light fixtures,ceiling assembly, power outlets, finishes | $3,283,298 |
| Mar 28, 2025 | Completed final sign-off Dec 2025 | 400 Howard St | Western Allied Mechanical Inc. | deferred mech submittal for 202502190568. minor ductwork modification on 4th fl to accommodate new wall,Details
deferred mech submittal for 202502190568. minor ductwork modification on 4th fl to accommodate new wall, | $50,000 |
| Feb 19, 2025 | Completed final sign-off Dec 2025 | 400 Howard St | Rudolph Commercial Interiors Inc, Rci | 4th fl - (e) unoccupied floor to be demised into 2 office suite. scope includes: demo of partition, light fixtures, ceiling assembly, millwork, plumbing and finishes. build back non-structural partitions, lighting, ceiling assembly and fixtures.Details
4th fl - (e) unoccupied floor to be demised into 2 office suite. scope includes: demo of partition, light fixtures, ceiling assembly, millwork, plumbing and finishes. build back non-structural partitions, lighting, ceiling assembly and fixtures. | $210,586 |
| Jul 19, 2023 | Never finaled issued Jul 2023, no final | 400 Howard St | Bilcor Inc | 4/f: relocate the (e) fire alarm speaker strobes (3) in same location, n new devices being added. ref ti pa 202305097392.Details
4/f: relocate the (e) fire alarm speaker strobes (3) in same location, n new devices being added. ref ti pa 202305097392. | $1,600 |
| Jul 19, 2023 | Never finaled issued Jul 2023, no final | 400 Howard St | Bilcor Inc | 6/f: relocate the (e) fire alarm speaker strobes (2) in same location. ref ti pa 202305097393.Details
6/f: relocate the (e) fire alarm speaker strobes (2) in same location. ref ti pa 202305097393. | $1,600 |
| Jun 29, 2023 | Expired or cancelled cancelled Jan 2026 | 400 Howard St | Ad Art Inc. | 1-illuminated single face wall sign "ishares by blackrock"Details
1-illuminated single face wall sign "ishares by blackrock" | $10,000 |
| Jun 29, 2023 | Completed final sign-off Nov 2023 | 400 Howard St | Ad Art Inc. | 1-illuminated single face wall sign "blackrock"Details
1-illuminated single face wall sign "blackrock" | $15,000 |
| Jun 21, 2023 | Completed final sign-off Jul 2023 | 400 Howard St | Ayoob & Peery Plumbing Co Inc | 6/f: change out 4-sprinkler & add 3 heads per t.iDetails
6/f: change out 4-sprinkler & add 3 heads per t.i | $961 |
| Jun 21, 2023 | Completed final sign-off Jul 2023 | 400 Howard St | Ayoob & Peery Plumbing Co Inc | 4/f: change out 14-sprinkler & add 3 heads per t.iDetails
4/f: change out 14-sprinkler & add 3 heads per t.i | $3,362 |
| May 26, 2023 | Never finaled issued Jul 2023, no final | 400 Howard St | Dpr Construction A | administrative revision permit to memorialize existing elevator lobby door locking and communications syste to remain. ref pa# 2022-0824-1165, 2022-0824-1162, 2022-0615-6437, 2022-0713-8419, 2022-0713-8421, 2022-0713-8422Details
administrative revision permit to memorialize existing elevator lobby door locking and communications syste to remain. ref pa# 2022-0824-1165, 2022-0824-1162, 2022-0615-6437, 2022-0713-8419, 2022-0713-8421, 2022-0713-8422 | |
| May 11, 2023 | Never finaled filed May 2023, never issued | 400 Howard St | Bass Electric | 2/f: removal of 4-extg lead acid battery ups systems and installation of 4-lithium battery ups systemsDetails
2/f: removal of 4-extg lead acid battery ups systems and installation of 4-lithium battery ups systems | $440,000 |
| May 9, 2023 | Completed final sign-off Sep 2023 | 400 Howard St | Gci, Inc | 4/f: interior non-structural demolition of select partitions ceilings, lights, fixtures, millwork and finishes on the 4/f. ab-017. ref 2026-0621-0476Details
4/f: interior non-structural demolition of select partitions ceilings, lights, fixtures, millwork and finishes on the 4/f. ab-017. ref 2026-0621-0476 | $25,000 |
| May 9, 2023 | Completed final sign-off Sep 2023 | 400 Howard St | Gci, Inc | 6/f: interior non-structural demolition of select partitions ceilings, lights, fixturs, millwork and finishes on the 4/f. ab-017.Details
6/f: interior non-structural demolition of select partitions ceilings, lights, fixturs, millwork and finishes on the 4/f. ab-017. | $20,000 |
| May 8, 2023 | Never finaled filed May 2023, never issued | 400 Howard St | replace (e) signs a1,a2 (black rock)Details
replace (e) signs a1,a2 (black rock) | ||
| May 8, 2023 | Completed final sign-off Jul 2023 | 400 Howard St | Ad Art Inc. | replace (e) signs a1 & a2 (black rock)Details
replace (e) signs a1 & a2 (black rock) | $4,000 |
| Apr 4, 2023 | Expired or cancelled cancelled Jan 2026 | 400 Howard St | Gci, Inc | 6/f: interior non-structural demolition of select partitions, ceilings,light fixtures, millwork and finishes. ab.017Details
6/f: interior non-structural demolition of select partitions, ceilings,light fixtures, millwork and finishes. ab.017 | $83,450 |
| Mar 13, 2023 | Never finaled issued Mar 2023, no final | 400 Howard St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system-t.i, add 2 and relocate 18 sprinklers. apn # 202211156486Details
existing fire sprinkler system-t.i, add 2 and relocate 18 sprinklers. apn # 202211156486 | $12,000 |
| Mar 13, 2023 | Never finaled issued Mar 2023, no final | 400 Howard St | Dpr Construction A | fire only administrative permit to obtain sffd assembly occupant load stamps (5) for existing assembly spaces. floors 1, 8, 10.Details
fire only administrative permit to obtain sffd assembly occupant load stamps (5) for existing assembly spaces. floors 1, 8, 10. | |
| Mar 7, 2023 | Never finaled issued Mar 2023, no final | 400 Howard St | Decker Electric Co Inc Electrical Contra | 1/f: minor modifications to exsiting life safety system due to tenant improvement consisting of 14 devices, 2 new speakers, 10 new speaker/strobes and 2 relocated speaker/strobes.Details
1/f: minor modifications to exsiting life safety system due to tenant improvement consisting of 14 devices, 2 new speakers, 10 new speaker/strobes and 2 relocated speaker/strobes. | $100,000 |
| Feb 23, 2023 | Never finaled issued Mar 2023, no final | 400 Howard St | Impac Group Inc. | 2-3, 7-10/f: fire only, evacuation maps signageDetails
2-3, 7-10/f: fire only, evacuation maps signage | $1,500 |
| Feb 6, 2023 | Completed final sign-off Feb 2023 | 400 Howard St | R L H Fire Protection Inc | ground/f:relocate (1) (e) sprinkler. no other work to system. ref bpa#202208311621Details
ground/f:relocate (1) (e) sprinkler. no other work to system. ref bpa#202208311621 | $500 |
| Jan 24, 2023 | Completed final sign-off Feb 2023 | 400 Howard St | Anderson, Rowe & Buckley, Inc. | 2nd fl - fire sprinkler only ref pa 2022-0824-1165 relocate 20 pendents & add 5 heads to 2nd fl black rock (total 25 heads)Details
2nd fl - fire sprinkler only ref pa 2022-0824-1165 relocate 20 pendents & add 5 heads to 2nd fl black rock (total 25 heads) | $13,000 |
| Jan 20, 2023 | Completed final sign-off Jan 2023 | 400 Howard St | Anderson, Rowe & Buckley, Inc. | 3rd fl - fire sprinkler relocate 17 sprinkler head, add 4 total of 21 sprinkler heads for blackrockDetails
3rd fl - fire sprinkler relocate 17 sprinkler head, add 4 total of 21 sprinkler heads for blackrock | $11,025 |
| Nov 15, 2022 | Completed final sign-off May 2024 | 400 Howard St | Dpr Construction A | ground floor ti for reconfiguration of mail/copy area and build out of employee health clinic.Details
ground floor ti for reconfiguration of mail/copy area and build out of employee health clinic. | $400,000 |
| Nov 2, 2022 | Never finaled issued Nov 2022, no final | 400 Howard St | Decker Electric Co Inc Electrical Contra | 2nd fl. modificatins to (e) life safety system due to tenant improvement consisting of (23) devices, (14) new speakers, (8) new speaker strobes and (1) candela adjustment to a speaker 1 strobeDetails
2nd fl. modificatins to (e) life safety system due to tenant improvement consisting of (23) devices, (14) new speakers, (8) new speaker strobes and (1) candela adjustment to a speaker 1 strobe | $16,100 |
| Nov 2, 2022 | Never finaled issued Nov 2022, no final | 400 Howard St | Decker Electric Co Inc Electrical Contra | 3/f minor modifications to existing life safety system due to ti including (17) devices, (3) new speakers, (10) new speaker/strobes and (4) relocated speaker/strobes. ref pa 202208241162.Details
3/f minor modifications to existing life safety system due to ti including (17) devices, (3) new speakers, (10) new speaker/strobes and (4) relocated speaker/strobes. ref pa 202208241162. | $650,000 |
| Oct 27, 2022 | Completed final sign-off Nov 2022 | 400 Howard St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only 202207138419. relocate 16 pendents, add 3 pendents, relocate uprights for blackrock 8th fl 21 headsDetails
fire sprinkler only 202207138419. relocate 16 pendents, add 3 pendents, relocate uprights for blackrock 8th fl 21 heads | $10,500 |
| Oct 27, 2022 | Completed final sign-off Nov 2022 | 400 Howard St | Anderson, Rowe & Buckley, Inc. | 10th fl - fire sprinkler only. relocate 2 pendents; for blackrock. ref pa 2022-0713-8422Details
10th fl - fire sprinkler only. relocate 2 pendents; for blackrock. ref pa 2022-0713-8422 | $1,000 |
| Oct 27, 2022 | Completed final sign-off Oct 2022 | 400 Howard St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only. 202206156437 relocate 25 pendents and add 5 pendents for black rock 7th fl 30 total headsDetails
fire sprinkler only. 202206156437 relocate 25 pendents and add 5 pendents for black rock 7th fl 30 total heads | $15,000 |
| Oct 27, 2022 | Completed final sign-off Nov 2022 | 400 Howard St | Anderson, Rowe & Buckley, Inc. | 9th fl - fire sprinkler only. relocate 16 pendent; relocate 4 uprights & add 2 upright; relocate 1 sidewalll for blackrock (23 heads). ref pa 2022-0713-8421Details
9th fl - fire sprinkler only. relocate 16 pendent; relocate 4 uprights & add 2 upright; relocate 1 sidewalll for blackrock (23 heads). ref pa 2022-0713-8421 | $11,500 |
| Oct 25, 2022 | Completed final sign-off Nov 2022 | 400 Howard St | Decker Electric Co Inc Electrical Contra | 8th fl: minor modifications to (e) life safety due to tenant improement consisting of (19) devices, (4) new speaker, (1) relocated speaker (8) new speaker/strobes, (5) relocated speaker/strobes and (1) candela adjustment to a speaker strobe. ref ti permit 202207138419Details
8th fl: minor modifications to (e) life safety due to tenant improement consisting of (19) devices, (4) new speaker, (1) relocated speaker (8) new speaker/strobes, (5) relocated speaker/strobes and (1) candela adjustment to a speaker strobe. ref ti permit 202207138419 | $12,000 |
| Oct 25, 2022 | Never finaled issued Oct 2022, no final | 400 Howard St | Decker Electric Co Inc Electrical Contra | 7th fl minor modifications to existing life safety system due to tenant improvement consiting of (22) devices. (7) new speakers, (11) new speaker/strobes, (4) relocated speaker/strobes.Details
7th fl minor modifications to existing life safety system due to tenant improvement consiting of (22) devices. (7) new speakers, (11) new speaker/strobes, (4) relocated speaker/strobes. | $650,000 |
| Oct 21, 2022 | Completed final sign-off Nov 2022 | 400 Howard St | Decker Electric Co Inc Electrical Contra | 10 fl: minor modifications to existing life safety system due to tenant improvement consisting of (3) devices - (2) new speakers, reloc (1) speaker/strobe.Details
10 fl: minor modifications to existing life safety system due to tenant improvement consisting of (3) devices - (2) new speakers, reloc (1) speaker/strobe. | $650,000 |
| Oct 21, 2022 | Completed final sign-off Nov 2022 | 400 Howard St | Decker Electric Co Inc Electrical Contra | 9 fl: minor modifications to existing life safety system due to tenant improvement consisting of (21) devices - 7 (n) speakers, 10 (n) speaker/strobes, 4 reloc speaker/strobes. ref 202207138421.Details
9 fl: minor modifications to existing life safety system due to tenant improvement consisting of (21) devices - 7 (n) speakers, 10 (n) speaker/strobes, 4 reloc speaker/strobes. ref 202207138421. | $650,000 |
| Sep 28, 2022 | Completed final sign-off Jan 2023 | 400 Howard St | Bilcor Inc | install (4) wall mounted weather proof speaker strobesDetails
install (4) wall mounted weather proof speaker strobes | $2,640 |
| Aug 31, 2022 | Completed final sign-off Jan 2024 | 400 Howard St | Gci, Inc | 1/f: t.i. (e) building lobby. demo lighting, millwork & finishes. construction of new nonstructural partitions, lighting, millwork & fimishesDetails
1/f: t.i. (e) building lobby. demo lighting, millwork & finishes. construction of new nonstructural partitions, lighting, millwork & fimishes | $583,264 |
| Aug 25, 2022 | Completed final sign-off Sep 2022 | 400 Howard St | Golden Gate Fire Protection Inc | concealed pendents on the 1st fl rr and shower rooms. ref ti #202204111935Details
concealed pendents on the 1st fl rr and shower rooms. ref ti #202204111935 | $8,400 |
| Aug 24, 2022 | Completed final sign-off May 2024 | 400 Howard St | Dpr Construction A | level 3 ti interior only. new partitions, doors, finishes, lighting. new all gender restroomDetails
level 3 ti interior only. new partitions, doors, finishes, lighting. new all gender restroom | $360,000 |
| Aug 24, 2022 | Completed final sign-off May 2024 | 400 Howard St | Dpr Construction A | level 2 interior ti. new partitoins, doors, finishes and lightingDetails
level 2 interior ti. new partitoins, doors, finishes and lighting | $500,000 |
| Jul 13, 2022 | Completed final sign-off May 2024 | 400 Howard St | Dpr Construction | 10/f: interior t.i. - new partitions, doors, finishes and lighting.Details
10/f: interior t.i. - new partitions, doors, finishes and lighting. | $120,000 |
| Jul 13, 2022 | Completed final sign-off May 2024 | 400 Howard St | Dpr Construction A | 9th flr interior t.i - new partitions, doors, finishes, and lightingDetails
9th flr interior t.i - new partitions, doors, finishes, and lighting | $400,000 |
| Jul 13, 2022 | Completed final sign-off May 2024 | 400 Howard St | Dpr Construction | 8/f: interior t.i. - new partitions, doors, finishes and lighting.Details
8/f: interior t.i. - new partitions, doors, finishes and lighting. | $375,000 |
| Jun 15, 2022 | Completed final sign-off May 2024 | 400 Howard St | Dpr Construction | 7th/f interior t.i. - new partitions, doors, finishes & lighting & breakroom.Details
7th/f interior t.i. - new partitions, doors, finishes & lighting & breakroom. | $650,000 |
| May 2, 2022 | Completed final sign-off Jun 2022 | 400 Howard St | C B F Inc | 1/f: fire life safety: install 2 ceiling mount speaker strobes, 1 smoke detector, 2 duct detectors, 3 control modules. ref permit 202112224861.Details
1/f: fire life safety: install 2 ceiling mount speaker strobes, 1 smoke detector, 2 duct detectors, 3 control modules. ref permit 202112224861. | $3,960 |
| Apr 11, 2022 | Completed final sign-off Feb 2023 | 400 Howard St | Gci, Inc | remodel & expansion of (e) shower rooms. demo & construction of non-structural partitions, plumbing fixtures, lighting & finishes.Details
remodel & expansion of (e) shower rooms. demo & construction of non-structural partitions, plumbing fixtures, lighting & finishes. | $140,000 |
| Mar 31, 2022 | Completed final sign-off Jun 2022 | 400 Howard St | Golden Gate Fire Protection Inc | g/f suite 130: fire sprinklers. relocate 13 pendent sprinklers and 1 upright. ref ti permit 202112224861.Details
g/f suite 130: fire sprinklers. relocate 13 pendent sprinklers and 1 upright. ref ti permit 202112224861. | $7,350 |
| Dec 22, 2021 | Completed final sign-off Nov 2022 | 400 Howard St | Gci, Inc | suite #130: interior tenant improvement. construction of (n) partitions, ceilings, lighting, millwork & finishes plus mechanical, electrical & plumbing.Details
suite #130: interior tenant improvement. construction of (n) partitions, ceilings, lighting, millwork & finishes plus mechanical, electrical & plumbing. | $125,726 |
| Feb 1, 2021 | Completed final sign-off Jul 2021 | 400 Howard St | Peacock Construction | suite 130: rev to pa 202010025699. addition of 2 baylights at open area.Details
suite 130: rev to pa 202010025699. addition of 2 baylights at open area. | |
| Dec 21, 2020 | Never finaled issued Feb 2021, no final | 400 Howard St | Victory Electric | fire alarm - 2 new wall mounted speakers strobes. new speakers will be added to the existing speaker circuit serving the 1st floor.Details
fire alarm - 2 new wall mounted speakers strobes. new speakers will be added to the existing speaker circuit serving the 1st floor. | $9,500 |
| Nov 17, 2020 | Completed final sign-off Feb 2021 | 400 Howard St | Golden Gate Fire Protection Inc | fire sprinkler only - ref # 2020-1002-5699 relocate 1 pendent in restroom (suite # 130)Details
fire sprinkler only - ref # 2020-1002-5699 relocate 1 pendent in restroom (suite # 130) | $1,000 |
| Oct 2, 2020 | Completed final sign-off Jul 2021 | 400 Howard St | Peacock Construction | suite# 130: architectural and electrical (t-24) work for 400 howard st. suite 130 retail shell suite project, barrier only work consists of the construction of single use accessible restroom in the suiteDetails
suite# 130: architectural and electrical (t-24) work for 400 howard st. suite 130 retail shell suite project, barrier only work consists of the construction of single use accessible restroom in the suite | $45,000 |
| Jun 26, 2020 | Never finaled issued Jul 2020, no final | 400 Howard St | street spaceDetails
street space | ||
| Jan 14, 2019 | Completed final sign-off May 2019 | 400 Howard St | Morton Smith Electrical Inc | suite #2: modification of (e) fire alarm. add relay. maher n/a.Details
suite #2: modification of (e) fire alarm. add relay. maher n/a. | $5,000 |
| Sep 17, 2018 | Completed final sign-off May 2019 | 400 Howard St | Evans Signs | to obtain final inspection for work approved under pa #201607283615 & #201607283617. all work is complete.Details
to obtain final inspection for work approved under pa #201607283615 & #201607283617. all work is complete. | |
| Jun 1, 2018 | Completed final sign-off Jun 2018 | 400 Howard St | Decker Electric Co Inc Electrical Contra | level #2: modifications to (e) life safety due to ti- 19 (devices) speaker replaced with sprinkler/strobes. same locations. ref app#201803294909Details
level #2: modifications to (e) life safety due to ti- 19 (devices) speaker replaced with sprinkler/strobes. same locations. ref app#201803294909 | $20,000 |
| May 31, 2018 | Completed final sign-off Jul 2018 | 400 Howard St | Allied Fire Protection | level 2 for "black rock" p x we, 17 relocates and 1 added fire sprinklers ref 201803294909Details
level 2 for "black rock" p x we, 17 relocates and 1 added fire sprinklers ref 201803294909 | $9,300 |
| May 21, 2018 | Completed final sign-off Aug 2018 | 400 Howard St | Dpr Construction | revision to 201803294909 address minor structural supports for new audio visual wall on 2nd flrDetails
revision to 201803294909 address minor structural supports for new audio visual wall on 2nd flr | $10,000 |
| Mar 29, 2018 | Completed final sign-off Aug 2018 | 400 Howard St | Dpr Construction | 2nd floor: single floor tenant improvement of second floor - work includes demolition, construction and associated mep trades. no work to structure, core or restrooms. fire alarm/fire sprinklers under sep. permit. maher naDetails
2nd floor: single floor tenant improvement of second floor - work includes demolition, construction and associated mep trades. no work to structure, core or restrooms. fire alarm/fire sprinklers under sep. permit. maher na | $1,100,000 |
| Jun 30, 2017 | Never finaled issued Jan 2018, no final | 400 Howard St | Tri-Quest Builders & Developers Inc | revision: suite 2: the following components and all associated wiring to be removed from project. 1.1 cs link monitor and control module, 1.2 hood temperative sensor from grease duct, 1.3 room temp sensor from space, fire supression system to be combined into 1 single system system to include theDetails
revision: suite 2: the following components and all associated wiring to be removed from project. 1.1 cs link monitor and control module, 1.2 hood temperative sensor from grease duct, 1.3 room temp sensor from space, fire supression system to be combined into 1 single system system to include the | $10,000 |
| Feb 10, 2017 | Never finaled issued Feb 2018, no final | 400 Howard St | Aaa Restaurant Fire Control/Dba Aaa Fire | #110- modify existing (2) ansul r-102 fire suppression systems so that one ansul r-102 fire system is protecting the kitchen hood and the pollution control unit. ref. 2017-0630-0856 n/a ordinance #155-13Details
#110- modify existing (2) ansul r-102 fire suppression systems so that one ansul r-102 fire system is protecting the kitchen hood and the pollution control unit. ref. 2017-0630-0856 n/a ordinance #155-13 | $5,000 |
| Oct 27, 2016 | Never finaled issued Oct 2016, no final | 400 Howard St | Tri-Quest Builders & Developers Inc | unit #110: as built revisions to plans pa 201608195475; added device at hood and walk-in; maher n/aDetails
unit #110: as built revisions to plans pa 201608195475; added device at hood and walk-in; maher n/a | |
| Oct 27, 2016 | Completed final sign-off Nov 2016 | 400 Howard St | Tri-Quest Builders & Developers Inc | revision to coversheet for pa 2016-0216-9655. updated non-infringement statement per jeff chin's, sffd, requestDetails
revision to coversheet for pa 2016-0216-9655. updated non-infringement statement per jeff chin's, sffd, request | |
| Oct 27, 2016 | Completed final sign-off Nov 2016 | 400 Howard St | Tri-Quest Builders & Developers Inc | revision to pa 2015-1222-5714 update non-infringement statementDetails
revision to pa 2015-1222-5714 update non-infringement statement | |
| Sep 28, 2016 | Completed final sign-off Nov 2016 | 400 Howard St | Aaa Restaurant Fire Control/Dba Aaa Fire | suite #2 - furnish and install one (1) ansul r-102 fire suppression system in the main kitchen area on the ground floor; furnish and install one ansul r-102 fire suppression system in the polution control unit on the mezzanine level. maher naDetails
suite #2 - furnish and install one (1) ansul r-102 fire suppression system in the main kitchen area on the ground floor; furnish and install one ansul r-102 fire suppression system in the polution control unit on the mezzanine level. maher na | $3,000 |
| Aug 22, 2016 | Never finaled issued Sep 2016, no final | 400 Howard St | Tri-Quest Builders & Developers Inc | electrical ti submittal for bldg/arch pa 201512225714 & mech 201602169655.Details
electrical ti submittal for bldg/arch pa 201512225714 & mech 201602169655. | |
| Aug 19, 2016 | Completed final sign-off Nov 2016 | 400 Howard St | Morton Smith Electrical Inc | 1/f- fire alarm system modifications, 2 duct smoke detector, relocate 1 strobe, 1 ansul monitoring, 1 strobe, 1 speaker strobe. maher naDetails
1/f- fire alarm system modifications, 2 duct smoke detector, relocate 1 strobe, 1 ansul monitoring, 1 strobe, 1 speaker strobe. maher na | $15,000 |
| Jul 28, 2016 | Completed final sign-off May 2019 | 400 Howard St | Evans Signs | #2- erect (1) illuminated wall sign for "chipotle". n/a ordinance #155-13Details
#2- erect (1) illuminated wall sign for "chipotle". n/a ordinance #155-13 | $3,950 |
| Jul 28, 2016 | Completed final sign-off May 2019 | 400 Howard St | Evans Signs | #2- erect (1) illuminated wall sign for "chipotle". n/a ordinance #155-13Details
#2- erect (1) illuminated wall sign for "chipotle". n/a ordinance #155-13 | $3,600 |
| Jul 8, 2016 | Completed final sign-off Dec 2016 | 400 Howard St | Tri-Quest Builders & Developers Inc | revision to 201512225714. alterations include kitchen equipment, switch from gas to electrical, misc arch items, correction of suite address from 2 to 110Details
revision to 201512225714. alterations include kitchen equipment, switch from gas to electrical, misc arch items, correction of suite address from 2 to 110 | |
| Jun 28, 2016 | Never finaled issued Jun 2016, no final | 400 Howard St | street spaceDetails
street space | ||
| Jun 21, 2016 | Completed final sign-off Oct 2016 | 400 Howard St | Bay Area Fire Protection Llc | #2 - modify existing fire sprinkelr system - demo, add, relcoate (26) fire sprinklers. ref pa #201512225714 (under review); relocate 15, add 11Details
#2 - modify existing fire sprinkelr system - demo, add, relcoate (26) fire sprinklers. ref pa #201512225714 (under review); relocate 15, add 11 | $10,000 |
| May 2, 2016 | Completed final sign-off Aug 2016 | 400 Howard St | Aeco Systems, Inc | change sequence of operation of fire alarm system to make duct detectors report as supervisoryDetails
change sequence of operation of fire alarm system to make duct detectors report as supervisory | $16,950 |
| Feb 16, 2016 | Completed final sign-off Dec 2016 | 400 Howard St | Tri-Quest Builders & Developers Inc | mechanical only for t.i. ref app#201512225714. n/a for maherDetails
mechanical only for t.i. ref app#201512225714. n/a for maher | $250,000 |
| Dec 22, 2015 | Completed final sign-off Dec 2016 | 400 Howard St | Tri-Quest Builders & Developers Inc | tenant improvement for restaurant, fixtures, finishes 3077 sq feet. mep under seperate permit #201602169655. fire and hood/ext under separate permit. n/a for maherDetails
tenant improvement for restaurant, fixtures, finishes 3077 sq feet. mep under seperate permit #201602169655. fire and hood/ext under separate permit. n/a for maher | $250,000 |
| Nov 18, 2015 | Completed final sign-off Jan 2016 | 400 Howard St | R L H Fire Protection Inc | add 6 pendent sprinkler heads. ref pa 2015-0725-1518. n/a ordinance #155-13Details
add 6 pendent sprinkler heads. ref pa 2015-0725-1518. n/a ordinance #155-13 | $4,967 |
| Jul 15, 2015 | Completed final sign-off Oct 2016 | 400 Howard St | Swinerton Builders | demo (e) fixtures, construct new partition furring door, ceiling, stand alone mech system outlets, finishes. n/a ordinance #155-13Details
demo (e) fixtures, construct new partition furring door, ceiling, stand alone mech system outlets, finishes. n/a ordinance #155-13 | $50,000 |
| May 14, 2015 | Never finaled issued Aug 2015, no final | 400 Howard St | Ad Art Inc. | erect an electric double faced projecting sign. n/a maher ordinanceDetails
erect an electric double faced projecting sign. n/a maher ordinance | $5,000 |
| May 14, 2015 | Never finaled issued Aug 2015, no final | 400 Howard St | Ad Art Inc. | erect an electric single faced wall sign. n/a maher ordinanceDetails
erect an electric single faced wall sign. n/a maher ordinance | $5,000 |
| Oct 24, 2014 | Never finaled issued Oct 2014, no final | 400 Howard St | Ad Art Inc. | erect one single faced electric wall sign on the 7/fDetails
erect one single faced electric wall sign on the 7/f | $10,000 |
| May 7, 2014 | Completed final sign-off Jun 2014 | 400 Howard St | Decker Electric Co Inc Electrical Contra | 1st flr: fire alarm ti- install speaker strobe for new atm space; compliance with ord 155-13 not required.Details
1st flr: fire alarm ti- install speaker strobe for new atm space; compliance with ord 155-13 not required. | $1,500 |
| Apr 25, 2014 | Completed final sign-off May 2014 | 400 Howard St | Westates Mechanical Corporation Inc | ground floor. add 1 pendent head at atm machineDetails
ground floor. add 1 pendent head at atm machine | $514 |
| Jan 30, 2014 | Never finaled issued Feb 2014, no final | 400 Howard St | Mina-Tree Signs, Inc | install one illuminated blade sign. n/a for the maher ordinance #155-13Details
install one illuminated blade sign. n/a for the maher ordinance #155-13 | $2,000 |
| Jan 30, 2014 | Never finaled issued Feb 2014, no final | 400 Howard St | Mina-Tree Signs, Inc | install one illuminated sign on to extg canopy. n/a for the maher ordinance #155-13Details
install one illuminated sign on to extg canopy. n/a for the maher ordinance #155-13 | $3,000 |
| Dec 23, 2013 | Completed final sign-off Oct 2014 | 400 Howard St | One Source Security & Sound Inc | install two interior atms, new ceiling and mechanical system. f/a, sprinklers under separate permit. compliance with ord 15-133 not requiredDetails
install two interior atms, new ceiling and mechanical system. f/a, sprinklers under separate permit. compliance with ord 15-133 not required | $50,000 |
| Oct 29, 2013 | Completed final sign-off Oct 2014 | 400 Howard St | demolish existing exterior window & add new pair of doors, new canopy added above, modify existing sidewalk at doors, add one new interior partition at retail space. *note* canopy under seperate permit. mep, ls fa, sprinklers on separate.Details
demolish existing exterior window & add new pair of doors, new canopy added above, modify existing sidewalk at doors, add one new interior partition at retail space. *note* canopy under seperate permit. mep, ls fa, sprinklers on separate. | $50,000 | |
| Oct 23, 2012 | Never finaled issued Oct 2012, no final | 400 Howard St | All California Signs | erect an electric wall single faced indirect new signDetails
erect an electric wall single faced indirect new sign | $6,500 |
| Sep 20, 2012 | Completed final sign-off Oct 2012 | 400 Howard St | San Francisco Commercial Builders Inc | revision to pa# 2012-0514-0407-architect error regarding occupancy classification noted as m/b & is m/b/a-2 (for full service restuarant)Details
revision to pa# 2012-0514-0407-architect error regarding occupancy classification noted as m/b & is m/b/a-2 (for full service restuarant) | |
| Aug 21, 2012 | Expired or cancelled cancelled Jan 2026 | 400 Howard St | erect new 10'x3' sign "a" sign, note mutiple signs at this site. permit for sign a only.Details
erect new 10'x3' sign "a" sign, note mutiple signs at this site. permit for sign a only. | ||
| Aug 21, 2012 | Expired or cancelled cancelled Jan 2026 | 400 Howard St | erect new sign "b" sign, note mutiple signs at this site. permit for sign b only.Details
erect new sign "b" sign, note mutiple signs at this site. permit for sign b only. | ||
| Aug 21, 2012 | Never finaled issued Sep 2012, no final | 400 Howard St | Ainor Signs Inc | erect new sign "d" sign, note mutiple signs at this site. permit for sign d only.Details
erect new sign "d" sign, note mutiple signs at this site. permit for sign d only. | $8,600 |
| Aug 21, 2012 | Never finaled issued Sep 2012, no final | 400 Howard St | Ainor Signs Inc | erect new oval window sign "c" sign, note mutiple signs at this site. permit for sign c only.Details
erect new oval window sign "c" sign, note mutiple signs at this site. permit for sign c only. | $8,600 |
| Jan 17, 2012 | Completed final sign-off Jan 2012 | 400 Howard St | Golden Gate Sign Company Inc. | revision to p.a. #201112201012. revise attachment detail and wireway for wall sign.Details
revision to p.a. #201112201012. revise attachment detail and wireway for wall sign. | $500 |
| Dec 20, 2011 | Expired or cancelled cancelled Jan 2026 | 400 Howard St | to hange double faced electric sign in windowDetails
to hange double faced electric sign in window | $500 | |
| Dec 20, 2011 | Completed final sign-off Jan 2012 | 400 Howard St | Northwest Signs | to erect electrical sign.Details
to erect electrical sign. | $7,500 |
| Dec 1, 2011 | Completed final sign-off Jan 2012 | 400 Howard St | Allied Fire Protection | tenant improvement "fed ex" add 21 pendent sprinklers from extg outlet.Details
tenant improvement "fed ex" add 21 pendent sprinklers from extg outlet. | $10,500 |
| Aug 24, 2011 | Expired or cancelled cancelled Jan 2026 | 400 Howard St | new starbucks t-i build out inside an existing shell building.construction of cafe front bar & back. construction of new partition walls & overhead soffit. relocation of 2 (e) doors. painting. installation of new flooring,new wall covering finishes.new furniture & casework. installation of new floorDetails
new starbucks t-i build out inside an existing shell building.construction of cafe front bar & back. construction of new partition walls & overhead soffit. relocation of 2 (e) doors. painting. installation of new flooring,new wall covering finishes.new furniture & casework. installation of new floor | $300,000 | |
| Nov 24, 2009 | Never finaled issued Nov 2009, no final | 400 Howard St | street space permit on 1st street.2 metersDetails
street space permit on 1st street.2 meters | ||
| Jan 5, 2009 | Completed final sign-off Mar 2009 | 400 Howard St | Aeco Systems, Inc | 1st floor-modifications to (e) life safety system due to tenant improvements consisting of 2 strobes, 4 speaker strobes for a total of 6 devicesDetails
1st floor-modifications to (e) life safety system due to tenant improvements consisting of 2 strobes, 4 speaker strobes for a total of 6 devices | $2,000 |
| Jan 17, 2008 | Never finaled issued Jan 2008, no final | 400 Howard St | Morrow-Meadows Corp Dba: Arc Electric Co | revisions to p.a. 20000122762. change fire alarm sequence schedule. as builtDetails
revisions to p.a. 20000122762. change fire alarm sequence schedule. as built | |
| Apr 30, 2007 | Completed final sign-off Sep 2008 | 400 Howard St | 1st time tenant improvement of 10 story office bldg for single tenant (barclays global investors) retail space and fire protection/fire alarm under separate permit.Details
1st time tenant improvement of 10 story office bldg for single tenant (barclays global investors) retail space and fire protection/fire alarm under separate permit. | $46,403,372 | |
| Oct 5, 2006 | Never finaled issued Oct 2006, no final | 400 Howard St | street spaceDetails
street space | ||
| Oct 14, 2005 | Completed final sign-off Mar 2006 | 400 Howard St | demolish 2 stories office bldg.Details
demolish 2 stories office bldg. |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.