Bass Electric
- Based in
- So. Sf
- On San Francisco permits
- Sep 2009 to Sep 2025
- Last 24 months
- 2 permits filed
5 permits since 2000: 1 completed, 2 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 3
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2025 | In progress issued Apr 2026 | 200 Paul Av | demo (e) pdu's and install (n) pdu's and remote power panel with smart monitoringDetails
demo (e) pdu's and install (n) pdu's and remote power panel with smart monitoring | $500,000 |
| Jun 2, 2025 | In progress issued Nov 2026 | 200 Paul Av | live on line migration of (e) critical distrib fr (e) 1500kw ups 2n distrb power to new 2n 1500kw ups. demo (e) ups and battery system & incoming & distrib switchboards. installation of 2 new switchboards & 4 new 750kw ups and lithium ion battery cabinets.Details
live on line migration of (e) critical distrib fr (e) 1500kw ups 2n distrb power to new 2n 1500kw ups. demo (e) ups and battery system & incoming & distrib switchboards. installation of 2 new switchboards & 4 new 750kw ups and lithium ion battery cabinets. | $750,000 |
| May 11, 2023 | Never finaled filed May 2023, never issued | 400 Howard St | 2/f: removal of 4-extg lead acid battery ups systems and installation of 4-lithium battery ups systemsDetails
2/f: removal of 4-extg lead acid battery ups systems and installation of 4-lithium battery ups systems | $440,000 |
| Oct 22, 2012 | Expired or cancelled cancelled Jan 2026 | 2242 Polk St | roof mounted grid tied photovoltaic system | $99,000 |
| Sep 8, 2009 | Completed final sign-off Sep 2010 | 1949 24th Av | retaining wall, 11' max height wall and excavation of existing grade. off haul spoils. new electrical equipment yard & equipment anchorage.Details
retaining wall, 11' max height wall and excavation of existing grade. off haul spoils. new electrical equipment yard & equipment anchorage. | $285,000 |