Brian Braganza
- License
- C26089
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Ajanta Design
- Based in
- Phoenix
- On San Francisco permits
- Oct 2016 to Oct 2026
17 permits since 2000 (architect on 17 permits): 11 completed, 5 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Novo Construction Inc (12), Gci, Inc (2), Skyline Construction (2)
- Engineers
- Christopher Jordan Malabed, Mathew Bittleston, Mojtaba Ardebili, Nathan Short, Stephen Shaffer, Sylvia Petta
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 17
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 27, 2026 | In progress filed Oct 2026, not yet issued | 415 Kearny St | Novo Construction Inc | construction of interior office space including new partitions, millwork, dodors, frames sidelights, lighting and ceiling tiles.Details
construction of interior office space including new partitions, millwork, dodors, frames sidelights, lighting and ceiling tiles. | $353,000 |
| Apr 13, 2026 | Completed final sign-off Oct 2026 | 415 Kearny St | Novo Construction Inc | revision to bpa #2026.0313.7505 to add work station end panels and layout, elevations add drapery pocket detail, revise lights fixture layout at reception 309. add card readersDetails
revision to bpa #2026.0313.7505 to add work station end panels and layout, elevations add drapery pocket detail, revise lights fixture layout at reception 309. add card readers | |
| Apr 10, 2026 | In progress issued Apr 2026 | 415 Kearny St | Novo Construction Inc | revision to pa#202603137502 to add work station end panels, drapery pocket details, add ceiling to open office 410. addition of card readersDetails
revision to pa#202603137502 to add work station end panels, drapery pocket details, add ceiling to open office 410. addition of card readers | |
| Mar 13, 2026 | In progress issued Mar 2026 | 415 Kearny St | Novo Construction Inc | 4th fl - tenant improvement to include open office, phone rooms, break areaDetails
4th fl - tenant improvement to include open office, phone rooms, break area | $286,000 |
| Feb 10, 2026 | In progress issued Feb 2026 | 415 Kearny St | Novo Construction Inc | 3rd fl - selective demo of interior office space to remove millwork, doors, frames, side lights, lighting and ceiling ab-017Details
3rd fl - selective demo of interior office space to remove millwork, doors, frames, side lights, lighting and ceiling ab-017 | $34,000 |
| Feb 5, 2026 | In progress issued Feb 2026 | 415 Kearny St | Novo Construction Inc | 4/f: selective demolition of interior office space to remove millwork, doors, frames,side lights, lighting and ceilings. ab017.Details
4/f: selective demolition of interior office space to remove millwork, doors, frames,side lights, lighting and ceilings. ab017. | $34,000 |
| Nov 4, 2025 | Completed final sign-off Feb 2026 | 430 California St | Novo Construction Inc | 11/f: demolition of interior partitions to create open office. minor lighting and power. new finishes.Details
11/f: demolition of interior partitions to create open office. minor lighting and power. new finishes. | $193,000 |
| Jun 11, 2025 | Completed final sign-off Aug 2025 | 655 Montgomery St | Novo Construction Inc | 16th/fl: installation of pods and phone booths on the 16th floorDetails
16th/fl: installation of pods and phone booths on the 16th floor | $12,800 |
| Dec 9, 2024 | Completed final sign-off Sep 2025 | 655 Montgomery St | Novo Construction Inc | ti on the 16t fl. to include new training room two small meeting rooms and addtional power locaions for open office furniture mechanical and elctrical includedDetails
ti on the 16t fl. to include new training room two small meeting rooms and addtional power locaions for open office furniture mechanical and elctrical included | $212,000 |
| Mar 3, 2022 | Expired or cancelled cancelled Jan 2026 | 400 Taylor St | addition of new exterior security doors. construction of storefront, finishes and lighting. modification of (e) hvac and electrical.Details
addition of new exterior security doors. construction of storefront, finishes and lighting. modification of (e) hvac and electrical. | $500,000 | |
| Feb 7, 2022 | Completed final sign-off May 2022 | 655 Montgomery St | Novo Construction Inc | ti to consist of new break area where employees may store and consume their own food. mep & fire alarm safety under separate permitDetails
ti to consist of new break area where employees may store and consume their own food. mep & fire alarm safety under separate permit | $80,000 |
| Dec 29, 2020 | Completed final sign-off Jan 2022 | 420 Taylor St | Novo Construction Inc | basement t.i. . scope includes construction of new partitions. finishes, and lighting, extension of extg hvac and electrical.Details
basement t.i. . scope includes construction of new partitions. finishes, and lighting, extension of extg hvac and electrical. | $1,140,000 |
| Dec 29, 2020 | Completed final sign-off Jan 2022 | 420 Taylor St | Novo Construction Inc | 1st floor & mezzanine ti: scope includes construction of new partitions, finishes, and lighting. extension of existing hvac and electrical.Details
1st floor & mezzanine ti: scope includes construction of new partitions, finishes, and lighting. extension of existing hvac and electrical. | $1,180,000 |
| Apr 15, 2019 | Completed final sign-off Sep 2019 | 180 Montgomery St | Skyline Construction | 13th fl - ti including demo and construction of non-structural partitions, new lighting, new finishes. scope includes elevator lobbyDetails
13th fl - ti including demo and construction of non-structural partitions, new lighting, new finishes. scope includes elevator lobby | $600,000 |
| Feb 7, 2019 | Completed final sign-off Sep 2019 | 180 Montgomery St | Skyline Construction | 24th floor: interior demolition, new partitions flooring and wall finishes.Details
24th floor: interior demolition, new partitions flooring and wall finishes. | $350,000 |
| Apr 14, 2017 | Completed final sign-off Jul 2017 | 699 08th St | Gci, Inc | 4th floor: suite 480 + 475 - demo and construction of non-structural interior partitions, new meeting rooms & renovated restroom fixtures & finishes on 4th floor.Details
4th floor: suite 480 + 475 - demo and construction of non-structural interior partitions, new meeting rooms & renovated restroom fixtures & finishes on 4th floor. | $180,000 |
| Oct 11, 2016 | Completed final sign-off Feb 2017 | 650 Townsend St | Gci, Inc | 6/f- partial demo, not touching ceiling, removal of hvac unit, raised floor, per ab-17Details
6/f- partial demo, not touching ceiling, removal of hvac unit, raised floor, per ab-17 | $25,000 |