Ranko Koprivica
- Listed as
- engineer
- Firm
- Syska Hennessy Group
- On San Francisco permits
- Mar 2016 to Sep 2017
7 permits since 2000 (engineer on 7 permits): 6 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2017 | Completed final sign-off Apr 2019 | 399 Geary St | Fisher Development Inc | revision to pa#201611233479, saell and core remodel, additional of partial enclosed 3/f with open air roof terrace, new elevator, new exit stairs, new storefront, new glass curtain wall facade along geary st. revision to mep. n/a ordinance #155-13Details
revision to pa#201611233479, saell and core remodel, additional of partial enclosed 3/f with open air roof terrace, new elevator, new exit stairs, new storefront, new glass curtain wall facade along geary st. revision to mep. n/a ordinance #155-13 | |
| Jul 25, 2017 | Completed final sign-off Nov 2017 | 1455 Market St | Deb Construction Llc | basement l02- modify (e) storage space to accommodate a (n) mailroom processing center. work includes remove (e) chainlink fences, install non-bearing partitions, doors, millworks, rcp, mep. security system & upgrade unisex restroom. n/a ordinance #155-13Details
basement l02- modify (e) storage space to accommodate a (n) mailroom processing center. work includes remove (e) chainlink fences, install non-bearing partitions, doors, millworks, rcp, mep. security system & upgrade unisex restroom. n/a ordinance #155-13 | $425,000 |
| Jun 13, 2017 | Completed final sign-off Feb 2018 | 350 California St | Bcci Construction Company | 11th floor t.i. involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling grid & tiles, new gyp board ceiling, lighitng fixtures, door & frames, millwork & new finishes.Details
11th floor t.i. involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling grid & tiles, new gyp board ceiling, lighitng fixtures, door & frames, millwork & new finishes. | $1,100,000 |
| Jun 13, 2017 | Completed final sign-off Feb 2018 | 350 California St | Bcci Construction Company | 17th floor t.i. involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling grid & tiles, new gyp board ceiling, lighitng fixtures, door & frames, millwork & new finishes.Details
17th floor t.i. involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling grid & tiles, new gyp board ceiling, lighitng fixtures, door & frames, millwork & new finishes. | $1,100,000 |
| Jun 13, 2017 | Completed final sign-off Sep 2017 | 350 California St | Bcci Construction Company | 4th & 5th floor - revision to pa #201612054179 - revision to drawings ot incorporate new mechanical room on floor (5). n/a maher ordinanceDetails
4th & 5th floor - revision to pa #201612054179 - revision to drawings ot incorporate new mechanical room on floor (5). n/a maher ordinance | |
| May 2, 2017 | Completed final sign-off Oct 2017 | 201 California St | Peacock Construction | 15th fl a/mep t.i. - project include demolition of two (2) existing unisex restrooms and power/signal. new interior partitions for offices, glazing, doors/frames, lighting, power, millwork and sinks, there is no structural work associated with this scope of work. fire under separate permit n/a maherDetails
15th fl a/mep t.i. - project include demolition of two (2) existing unisex restrooms and power/signal. new interior partitions for offices, glazing, doors/frames, lighting, power, millwork and sinks, there is no structural work associated with this scope of work. fire under separate permit n/a maher | $1,252,707 |
| Mar 8, 2016 | Never finaled issued Mar 2016, no final | 101 California St | Truebeck Construction | modify hvac, electrical & lighting systesm to accomodate new office and conference room. title 24 compliance. ref t.i. pa#2016-0217-9789Details
modify hvac, electrical & lighting systesm to accomodate new office and conference room. title 24 compliance. ref t.i. pa#2016-0217-9789 | $5,000 |