Block 0315, lot 019
399 Geary St
- City’s use
- Commercial Retail
- Built
- 1968
- Stories
- 2
- Units
- 6
- Rooms
- 2 bathrooms
- Building
- 14,761 sq ft
- Lot
- 2,796 sq ft
- Zoning
- C3G
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
55 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 13, 2024 | Completed final sign-off Jul 2025 | 399 Geary St | Martin Sign Co Inc. | fire evcauation signsDetails
fire evcauation signs | |
| Jun 10, 2024 | Completed final sign-off Jul 2024 | 399 Geary St | Fluoresco Services Llc/Everbrite West Ll | install illuminated (2) single sided 37.19sf each wall sign for cvs store "sign a1 and a2" facing the street. sharing plansDetails
install illuminated (2) single sided 37.19sf each wall sign for cvs store "sign a1 and a2" facing the street. sharing plans | $5,000 |
| Jun 10, 2024 | Completed final sign-off Jul 2024 | 399 Geary St | Fluoresco Services Llc/Everbrite West Ll | install (1) illuminated double sided 176sf blade sign for cvs store "sign c" facing the street. sharing plans with 202406104065Details
install (1) illuminated double sided 176sf blade sign for cvs store "sign c" facing the street. sharing plans with 202406104065 | $5,000 |
| Jun 10, 2024 | In progress issued Jun 2024 | 399 Geary St | Fluoresco Services Llc/Everbrite West Ll | cvs store house being installed at front entrance door with sticky letters for "sign b"Details
cvs store house being installed at front entrance door with sticky letters for "sign b" | $949 |
| Jun 9, 2021 | Completed final sign-off Sep 2021 | 399 Geary St | Weckworth Electric Group Inc | red cloud to replace bda head end unit as well as the roof errcs antenna to comply with sf frequencies. all other components remain unchanged.Details
red cloud to replace bda head end unit as well as the roof errcs antenna to comply with sf frequencies. all other components remain unchanged. | |
| Nov 7, 2019 | Never finaled issued Nov 2019, no final | 399 Geary St | International Fire Equip | install ul 300 fire system ref pa 2017-0915-8376Details
install ul 300 fire system ref pa 2017-0915-8376 | $8,000 |
| Nov 1, 2019 | Never finaled issued Nov 2019, no final | 399 Geary St | street space/mta metersDetails
street space/mta meters | ||
| Oct 31, 2019 | Never finaled issued Feb 2020, no final | 399 Geary St | Fire Detection Unlimited | monitoring of buildings errcs system. provide errcs annunciator adjacent to facu. ref pa# 2019/02/01/1872. as built fa plans. orig fa pa# 2018/06/25/2821. errcs pa# 2019/09/11/1295.Details
monitoring of buildings errcs system. provide errcs annunciator adjacent to facu. ref pa# 2019/02/01/1872. as built fa plans. orig fa pa# 2018/06/25/2821. errcs pa# 2019/09/11/1295. | $10,980 |
| Sep 11, 2019 | Completed final sign-off Feb 2020 | 399 Geary St | A S F Electric Inc, Eric F Anderson Incorporated | install errcs (emergency responder radio coverage system)**maher n/a**Details
install errcs (emergency responder radio coverage system)**maher n/a** | $55,000 |
| Aug 26, 2019 | Completed final sign-off Sep 2019 | 399 Geary St | Jones Sign Co Inc | revision to 201807114249 to show front canopy supports embedded into concrete footingsDetails
revision to 201807114249 to show front canopy supports embedded into concrete footings | $2,000 |
| Aug 15, 2019 | Expired or cancelled cancelled Jan 2026 | 399 Geary St | Integrated Enterprises Inc Dba Integrate | revision of plans #201709158376 - updated/revised framing & millwork. revision of plumbing - added hose bib, updated mechanical - revised electrical to etc system & adding lighting. maher naDetails
revision of plans #201709158376 - updated/revised framing & millwork. revision of plumbing - added hose bib, updated mechanical - revised electrical to etc system & adding lighting. maher na | |
| Jul 8, 2019 | Never finaled issued Jul 2019, no final | 399 Geary St | Integrated Enterprises Inc Dba Integrate | 3/f: install 3 retractable awnings and 11 drop shades in outside dining area on rooftop deck/patio.Details
3/f: install 3 retractable awnings and 11 drop shades in outside dining area on rooftop deck/patio. | $35,000 |
| May 30, 2019 | Never finaled issued May 2019, no final | 399 Geary St | Bana Construction Inc | place of entertainment - piano bar - in mastro's restaurant. n/a for maher.Details
place of entertainment - piano bar - in mastro's restaurant. n/a for maher. | $1,000 |
| Apr 25, 2019 | Never finaled issued May 2019, no final | 399 Geary St | Fire Detection Unlimited | new audible and visual occupant notification devices will be provided throughout the common areas of the ti sow area as per code and shall be powered by new remote poewr supplies with battery backup & activated by existing facp.Details
new audible and visual occupant notification devices will be provided throughout the common areas of the ti sow area as per code and shall be powered by new remote poewr supplies with battery backup & activated by existing facp. | $27,580 |
| Apr 11, 2019 | Never finaled issued Apr 2019, no final | 399 Geary St | street space/mta metersDetails
street space/mta meters | ||
| Apr 2, 2019 | Completed final sign-off Apr 2019 | 399 Geary St | Fire Detection Unlimited | as built record drawing resubmittal to pa 2019-0327-6327Details
as built record drawing resubmittal to pa 2019-0327-6327 | |
| Apr 1, 2019 | Completed final sign-off Feb 2020 | 399 Geary St | Westates Mechanical Corporation Inc | install fire sprinkler at 1st,2nd,and 3rd. total 146 heads. n/a for maherDetails
install fire sprinkler at 1st,2nd,and 3rd. total 146 heads. n/a for maher | $75,190 |
| Mar 29, 2019 | Never finaled issued Mar 2019, no final | 399 Geary St | street spaceDetails
street space | ||
| Mar 27, 2019 | Never finaled issued Aug 2019, no final | 399 Geary St | Integrated Enterprises Inc Dba Integrate | revision to 201709138376 - changing non load beaing walls to fit around standpipes on level 2 and 3Details
revision to 201709138376 - changing non load beaing walls to fit around standpipes on level 2 and 3 | |
| Mar 27, 2019 | Completed final sign-off Apr 2019 | 399 Geary St | Fire Detection Unlimited | record drawing submittal to pa 2019-0220-3373 cvs store #10495Details
record drawing submittal to pa 2019-0220-3373 cvs store #10495 | |
| Mar 19, 2019 | Never finaled issued Mar 2019, no final | 399 Geary St | Superior Electrical Advertising Inc | to erect 2 illuminated single face (cvs pharmacy) 2'-6"x14'-10 5/8" sign.Details
to erect 2 illuminated single face (cvs pharmacy) 2'-6"x14'-10 5/8" sign. | $20,000 |
| Mar 19, 2019 | Never finaled issued Mar 2019, no final | 399 Geary St | Superior Electrical Advertising Inc | to erect illuminated double face (cvs pharmacy) 8'x1'-10" sign.Details
to erect illuminated double face (cvs pharmacy) 8'x1'-10" sign. | $10,000 |
| Mar 18, 2019 | Completed final sign-off Apr 2019 | 399 Geary St | Eric F Anderson Incorporated | installation of the storage racks, shelving and gandolas for structural eadequacy at basement and ground floorDetails
installation of the storage racks, shelving and gandolas for structural eadequacy at basement and ground floor | $5,000 |
| Feb 20, 2019 | Completed final sign-off Apr 2019 | 399 Geary St | Fire Detection Unlimited | ti of (e) gamewell/fci s3 fire alarm. new and relocate (e) audible & visual occupant notification devices in common area of ti space 6 (n) horn strobes, relocate 2 horn strobes, 4 duct detectors for fsds 8 duct detectors and relays for fcu-1 through fcu-8 all existing out of scope to remainDetails
ti of (e) gamewell/fci s3 fire alarm. new and relocate (e) audible & visual occupant notification devices in common area of ti space 6 (n) horn strobes, relocate 2 horn strobes, 4 duct detectors for fsds 8 duct detectors and relays for fcu-1 through fcu-8 all existing out of scope to remain | $15,470 |
| Feb 15, 2019 | Completed final sign-off Apr 2019 | 399 Geary St | Eric F Anderson Incorporated | remodeling of interior space at lower level and ground level. new t.i. mechanical, elect. and plmg systems. ref app#201801118430. n/a for maherDetails
remodeling of interior space at lower level and ground level. new t.i. mechanical, elect. and plmg systems. ref app#201801118430. n/a for maher | |
| Feb 1, 2019 | Never finaled issued May 2019, no final | 399 Geary St | Fire Detection Unlimited | as-built: record drawings submittal to pa201806252821. maher n/a.Details
as-built: record drawings submittal to pa201806252821. maher n/a. | |
| Feb 1, 2019 | Never finaled issued Feb 2019, no final | 399 Geary St | Fire Detection Unlimited | installation of a new two-way communications system. install 1 base station, 6 call stations & required signage.Details
installation of a new two-way communications system. install 1 base station, 6 call stations & required signage. | $43,000 |
| Jan 31, 2019 | Never finaled issued Jan 2019, no final | 399 Geary St | street spaceDetails
street space | ||
| Jan 23, 2019 | Never finaled issued Jan 2019, no final | 399 Geary St | Eric F Anderson Incorporated | street spaceDetails
street space | |
| Jan 18, 2019 | Completed final sign-off Mar 2019 | 399 Geary St | Westates Mechanical Corporation Inc | add 74 pendent, 5 upright & 2 dry pendentDetails
add 74 pendent, 5 upright & 2 dry pendent | $41,715 |
| Jan 15, 2019 | Completed final sign-off Apr 2019 | 399 Geary St | Eric F Anderson Incorporated | trench 3'-0" wide max sad repair slab on grade. equipment on the framing duct opening support.Details
trench 3'-0" wide max sad repair slab on grade. equipment on the framing duct opening support. | $10,000 |
| Jul 11, 2018 | Completed final sign-off Mar 2020 | 399 Geary St | erect electrical wall mounted sign for restaurant (mastro's)Details
erect electrical wall mounted sign for restaurant (mastro's) | $10,000 | |
| Jul 11, 2018 | Never finaled issued Jun 2019, no final | 399 Geary St | Jones Sign Co Inc | exterior sign package canopy(mastro's)Details
exterior sign package canopy(mastro's) | $20,000 |
| Jun 25, 2018 | Completed final sign-off Sep 2019 | 399 Geary St | Fire Detection Unlimited | ref 201611233479 installation of new gamewell/fci 13 fire alarm panel. 3 single cab elevator banks. smk heat and monitoring for primary and secondary recall strubt trip. new audible powers bt new remote power supply activatied through facp smk det at elevator lobbies and rooms with facp pr rps. ductDetails
ref 201611233479 installation of new gamewell/fci 13 fire alarm panel. 3 single cab elevator banks. smk heat and monitoring for primary and secondary recall strubt trip. new audible powers bt new remote power supply activatied through facp smk det at elevator lobbies and rooms with facp pr rps. duct | $25,780 |
| Jun 13, 2018 | Expired or cancelled cancelled Jan 2026 | 399 Geary St | install illuminated double-faced projecting canopy sign. sign b.Details
install illuminated double-faced projecting canopy sign. sign b. | $25,000 | |
| Jun 13, 2018 | Expired or cancelled cancelled Jan 2026 | 399 Geary St | install illuminated single-faced wall sign. sign a.Details
install illuminated single-faced wall sign. sign a. | $15,000 | |
| Jun 13, 2018 | Expired or cancelled cancelled Jan 2026 | 399 Geary St | install two illuminated double-faced projecting wall sign. sign c & d.Details
install two illuminated double-faced projecting wall sign. sign c & d. | $60,000 | |
| Apr 5, 2018 | Completed final sign-off Aug 2018 | 399 Geary St | H & M Fire Protection, Inc. | revision to app#201712055574. delete fdc on geary, provide signage at bldg entry. delete sprinkler at top of passenger elevator shaft. arch ref #201709259436.Details
revision to app#201712055574. delete fdc on geary, provide signage at bldg entry. delete sprinkler at top of passenger elevator shaft. arch ref #201709259436. | |
| Jan 18, 2018 | Expired or cancelled cancelled Jan 2026 | 399 Geary St | new pg&e vault. maher n/a.Details
new pg&e vault. maher n/a. | $30,000 | |
| Jan 11, 2018 | Completed final sign-off Apr 2019 | 399 Geary St | Eric F Anderson Incorporated | remodel of interior space at lower level and ground floor, new ti mechanical, electrical & plumbing systemsDetails
remodel of interior space at lower level and ground floor, new ti mechanical, electrical & plumbing systems | $500,000 |
| Dec 5, 2017 | Completed final sign-off Feb 2019 | 399 Geary St | H & M Fire Protection, Inc. | install fire sprinkler system in 3 story building with basement. **maher n/a**Details
install fire sprinkler system in 3 story building with basement. **maher n/a** | $118,650 |
| Sep 25, 2017 | Completed final sign-off Apr 2019 | 399 Geary St | Fisher Development Inc | revision to pa#201611233479, saell and core remodel, additional of partial enclosed 3/f with open air roof terrace, new elevator, new exit stairs, new storefront, new glass curtain wall facade along geary st. revision to mep. n/a ordinance #155-13Details
revision to pa#201611233479, saell and core remodel, additional of partial enclosed 3/f with open air roof terrace, new elevator, new exit stairs, new storefront, new glass curtain wall facade along geary st. revision to mep. n/a ordinance #155-13 | |
| Sep 15, 2017 | Never finaled issued Jan 2019, no final | 399 Geary St | Integrated Enterprises Inc Dba Integrate | new restaurant (vacant b to a-2) with an entrance lobby on ground floor, dining facilities on 2nd & 3rd floor - new kitchen, new restrooms, new dining area & m.e.p.. exterior work will be under separate permit. ref pa# 201611233479. ** maher: n/a **Details
new restaurant (vacant b to a-2) with an entrance lobby on ground floor, dining facilities on 2nd & 3rd floor - new kitchen, new restrooms, new dining area & m.e.p.. exterior work will be under separate permit. ref pa# 201611233479. ** maher: n/a ** | $3,500,000 |
| Jun 7, 2017 | Completed final sign-off Apr 2019 | 399 Geary St | Fisher Development Inc | micropile anchorage and connection to the pile cap.Details
micropile anchorage and connection to the pile cap. | $80,000 |
| May 24, 2017 | Completed final sign-off Dec 2018 | 399 Geary St | Fisher Development Inc | one testing micropile installation onlyDetails
one testing micropile installation only | $10,000 |
| Feb 3, 2017 | Never finaled issued Feb 2017, no final | 340 Mason St | streetspaceDetails
streetspace | ||
| Dec 14, 2016 | Completed final sign-off Nov 2018 | 399 Geary St | Fisher Development Inc | demo of indicated floor slabs for proposed elevator shaft & stair opening. demo of vault & stair cases. demo of (e) ceilings, partitions & the removal of (e) flooring. structural shoring on separate permit. space to remain vacant per sfbc ab-017.Details
demo of indicated floor slabs for proposed elevator shaft & stair opening. demo of vault & stair cases. demo of (e) ceilings, partitions & the removal of (e) flooring. structural shoring on separate permit. space to remain vacant per sfbc ab-017. | $5,000 |
| Nov 23, 2016 | Completed final sign-off Apr 2019 | 399 Geary St | Fisher Development Inc | change of occupancy. shell & core remodel & (n)3/f -no final completion until all related ti permits are complete. remodel an "e" 2 story concrete & masonry building. addition of partially enclosed 3rd flr with an open air-roof terrace. new elevation, new exit stairs, new mep.Details
change of occupancy. shell & core remodel & (n)3/f -no final completion until all related ti permits are complete. remodel an "e" 2 story concrete & masonry building. addition of partially enclosed 3rd flr with an open air-roof terrace. new elevation, new exit stairs, new mep. | $2,000,000 |
| Nov 3, 2016 | Never finaled issued Nov 2016, no final | 340 Mason St | street spaceDetails
street space | ||
| Sep 11, 2015 | Expired or cancelled disapproved Sep 2018 | 340 Mason St | planning entitlementDetails
planning entitlement | $1,000 | |
| Aug 11, 2015 | Completed final sign-off Sep 2018 | 340 Mason St | Peacock Construction | tenant 2: soft demo ab-017. tenant #2. n/a for maher.Details
tenant 2: soft demo ab-017. tenant #2. n/a for maher. | $5,000 |
| Aug 10, 2015 | Completed final sign-off Sep 2018 | 340 Mason St | Peacock Construction | demo of (e) interior partitions, installations of a (n) partition wall on 1st floor. tenant #5. maher na.Details
demo of (e) interior partitions, installations of a (n) partition wall on 1st floor. tenant #5. maher na. | $20,000 |
| Jan 7, 2015 | Never finaled issued Jan 2015, no final | 395 Geary St | street spaceDetails
street space | ||
| Sep 30, 2013 | Never finaled issued Sep 2013, no final | 340 Mason St | street spaceDetails
street space | ||
| Aug 14, 2013 | Never finaled issued Aug 2013, no final | 340 Mason St | Steven Phillips Construction Inc | emergency repair of 6" underground fire line to bldg.Details
emergency repair of 6" underground fire line to bldg. | $12,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Fire Detection Unlimited (8), Anderson Eric F Inc (6), Fisher Development Inc (5), Integrated Enterprises Inc Dba Integrate (4), Fluoresco Services Llc/Everbrite West Ll (3), H & M Fire Protection, Inc. (2), Jones Sign Co Inc (2), Peacock Construction (2), Superior Electrical Advertising Inc (2), Westates Mechanical Corporation Inc (2), A S F Electric Inc, Bana Construction Inc, International Fire Equip, Martin Sign Co Inc., Steven Phillips Construction Inc, Weckworth Electric Group Inc
- Architects
- James Zak (4), Benjamin R Urueta (3)
- Engineers
- Thomas Podesta (3), Jose Herrera (2), Tony Jacob (2), Alan Robinson, Ben Au, Peter Higgins, Philip Sheridan, Ranko Koprivica, Salvatore Italiano
- Designers
- James Louis Zak (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.