Seth Sherman
- Listed as
- engineer
- Firm
- Syska Hennessy Group
- On San Francisco permits
- Oct 2015 to Nov 2023
12 permits since 2000 (engineer on 12 permits): 8 completed, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 8, 2023 | Completed final sign-off Jan 2025 | 300 Grant Av | Alldon Construction Inc, Eunmin Ca, Inc | 6th fl tenantimprovement-mechanical, plumbing drawings and electrical drawings. ref 202305087342.Details
6th fl tenantimprovement-mechanical, plumbing drawings and electrical drawings. ref 202305087342. | $250,000 |
| Dec 29, 2022 | Completed final sign-off Apr 2025 | 335 Powell St | minor permit to alter application requst to convert 2 roof decks on the 2/f east side of the building facing union square to occupied decks for social events. access will be through (e) windows that will be changed to doors. the adjacent meeting rooms will be reconfigured.Details
minor permit to alter application requst to convert 2 roof decks on the 2/f east side of the building facing union square to occupied decks for social events. access will be through (e) windows that will be changed to doors. the adjacent meeting rooms will be reconfigured. | $345,000 | |
| May 21, 2021 | Completed final sign-off Feb 2022 | 128 Post St | Clune Construction Company L P | renovation of existing retail space ot include new partition walls, suspended ceiling clouds, new plumbing fixtures, electrical & mechanical for open retail display area, small breakroom area for staff, unisex restroom & storage room.Details
renovation of existing retail space ot include new partition walls, suspended ceiling clouds, new plumbing fixtures, electrical & mechanical for open retail display area, small breakroom area for staff, unisex restroom & storage room. | $970,000 |
| Jan 16, 2020 | Completed final sign-off Oct 2020 | 350 California St | Plant Construction Co, Lp | revision to pa 2019-0611-3060 to reflect partition wall revisions, relocation of light fixtures & equipmentDetails
revision to pa 2019-0611-3060 to reflect partition wall revisions, relocation of light fixtures & equipment | |
| Dec 18, 2019 | Expired or cancelled withdrawn Apr 2025 | 50 Post St | complete renovation of crocker galleria core and shell. facase and sidewalk to be altered at exterior. architectural. structural, mechnical, eletrical, plumbing to be updated per modern codes. ada upgrades to entry and path of travel.**maher n/a**Details
complete renovation of crocker galleria core and shell. facase and sidewalk to be altered at exterior. architectural. structural, mechnical, eletrical, plumbing to be updated per modern codes. ada upgrades to entry and path of travel.**maher n/a** | $40,000,000 | |
| Dec 5, 2018 | Completed final sign-off Aug 2019 | 560 Mission St | Dome Construction Corp | ti of a suite level 18 inside an existing shell/core 31-level office bldg, to include associated architectural, mechanical, electrical, and plumbing.Details
ti of a suite level 18 inside an existing shell/core 31-level office bldg, to include associated architectural, mechanical, electrical, and plumbing. | $1,166,900 |
| Nov 21, 2018 | Completed final sign-off Aug 2019 | 101 Post St | Bulley & Andrews Inc. | interior ti on ground floor (e) coffee bar refresh surface finish upgrades no change to (e) function of space. work includes minimul demo, plm & powerDetails
interior ti on ground floor (e) coffee bar refresh surface finish upgrades no change to (e) function of space. work includes minimul demo, plm & power | $40,000 |
| Apr 5, 2018 | Completed final sign-off Apr 2019 | 1000 Montgomery St | C B 2 Builders Incorporated | interior renov of exstg convalescent facility and assoc service and admin rooms. all changes to inside exstg bldg reconfig of toilet partitions for ada floor clearances. change sfdbi occupancy of ground floor from i-2 to i-4. no change to planning dept use/classification.Details
interior renov of exstg convalescent facility and assoc service and admin rooms. all changes to inside exstg bldg reconfig of toilet partitions for ada floor clearances. change sfdbi occupancy of ground floor from i-2 to i-4. no change to planning dept use/classification. | $700,000 |
| Jul 25, 2017 | Completed final sign-off Nov 2017 | 1455 Market St | Deb Construction Llc | basement l02- modify (e) storage space to accommodate a (n) mailroom processing center. work includes remove (e) chainlink fences, install non-bearing partitions, doors, millworks, rcp, mep. security system & upgrade unisex restroom. n/a ordinance #155-13Details
basement l02- modify (e) storage space to accommodate a (n) mailroom processing center. work includes remove (e) chainlink fences, install non-bearing partitions, doors, millworks, rcp, mep. security system & upgrade unisex restroom. n/a ordinance #155-13 | $425,000 |
| Dec 29, 2016 | Never finaled issued Mar 2017, no final | 1 Sansome St | Acco Engineered Systems Inc. Dba Acco En | mechanical plans for cooling towers (roof location) replacement. replace 2 existing cooling towers and water pumps with new new equipment like for like (electrical permit under separate permit)Details
mechanical plans for cooling towers (roof location) replacement. replace 2 existing cooling towers and water pumps with new new equipment like for like (electrical permit under separate permit) | $300,000 |
| Mar 8, 2016 | Never finaled issued Mar 2016, no final | 101 California St | Truebeck Construction | modify hvac, electrical & lighting systesm to accomodate new office and conference room. title 24 compliance. ref t.i. pa#2016-0217-9789Details
modify hvac, electrical & lighting systesm to accomodate new office and conference room. title 24 compliance. ref t.i. pa#2016-0217-9789 | $5,000 |
| Oct 27, 2015 | Never finaled issued Dec 2015, no final | 1455 Market St | Deb Construction Llc | partial floor ti for single tenant on 1st fl including but not limited to selective demo,partitions, ceiling and finishes. life safety under sep maher not req. ref pa201508113903. mechanical & electrical t24 plans.Details
partial floor ti for single tenant on 1st fl including but not limited to selective demo,partitions, ceiling and finishes. life safety under sep maher not req. ref pa201508113903. mechanical & electrical t24 plans. | $150,000 |