Roy J. Militar
- Listed as
- architect, engineer
- Firm
- Brereton Architects
- Based in
- Sf
- On San Francisco permits
- Feb 2016 to Feb 2020
25 permits since 2000 (architect on 20 permits, engineer on 5 permits): 17 completed, 6 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 13, 2020 | Completed final sign-off Sep 2020 | 350 California St | Plant Construction Co, Lp | operable interior partition system made of glass and aluminum. deferred submittal form dated 6/0/19 20190611305Details
operable interior partition system made of glass and aluminum. deferred submittal form dated 6/0/19 20190611305 | $40,000 |
| Feb 13, 2020 | Completed final sign-off Sep 2022 | 55 New Montgomery St | Skyline Capital Builders Llc | demolition of sidewalk & basement area, new construction of new underground pg & e vault installationDetails
demolition of sidewalk & basement area, new construction of new underground pg & e vault installation | $325,000 |
| Feb 7, 2020 | Completed final sign-off Apr 2021 | 125 Valdez Av | Winder Construction Inc. | per ordinance# 95-17; convert (e) basement to adu (remove stairs & add kitchen).Details
per ordinance# 95-17; convert (e) basement to adu (remove stairs & add kitchen). | $7,000 |
| Feb 7, 2020 | Completed final sign-off Sep 2020 | 350 California St | Plant Construction Co, Lp | demo (e) atm machine wall enclosure. salvaged glass storefront will be replacedDetails
demo (e) atm machine wall enclosure. salvaged glass storefront will be replaced | $8,000 |
| Jan 29, 2020 | Expired or cancelled cancelled Jan 2026 | 350 California St | Plant Construction Co, Lp | installation of operable interior partition system. glass and aluminum with integral exit door. reference to pa #2019-0611-3057Details
installation of operable interior partition system. glass and aluminum with integral exit door. reference to pa #2019-0611-3057 | $30,000 |
| Jan 17, 2020 | Completed final sign-off Sep 2020 | 350 California St | Plant Construction Co, Lp | deferred submittal for interior portion system (glass & aluminum) ref pa 2019-0611-3057Details
deferred submittal for interior portion system (glass & aluminum) ref pa 2019-0611-3057 | $30,000 |
| Jan 16, 2020 | Completed final sign-off Oct 2020 | 350 California St | Plant Construction Co, Lp | revision to pa 2019-0611-3060 to reflect partition wall revisions, relocation of light fixtures & equipmentDetails
revision to pa 2019-0611-3060 to reflect partition wall revisions, relocation of light fixtures & equipment | |
| Nov 15, 2019 | Completed final sign-off Apr 2021 | 127 Valdez Av | Winder Construction Inc. | 1st fl to be remodeled (n) bedroom with 2 (n) bathrooms. 2nd fl to be remodeled (bedroom with 2 (n) bathroomsDetails
1st fl to be remodeled (n) bedroom with 2 (n) bathrooms. 2nd fl to be remodeled (bedroom with 2 (n) bathrooms | $50,000 |
| Nov 15, 2019 | Never finaled issued Nov 2019, no final | 123 Mission St | Truebeck Construction | minor upgrades to path of travel including barier removal. work limited to garage. surface changes only. n/a maherDetails
minor upgrades to path of travel including barier removal. work limited to garage. surface changes only. n/a maher | $10,000 |
| Oct 25, 2019 | Completed final sign-off Jun 2020 | 1 Post St | Richlen Construction | 26th floor tenant lobby: demolition of extg ceiling in tennant lobby and corridor. removal of all floor and wall materials. new construction consists of new ceiling tile, grid, lighting and new floor and wall finishes.Details
26th floor tenant lobby: demolition of extg ceiling in tennant lobby and corridor. removal of all floor and wall materials. new construction consists of new ceiling tile, grid, lighting and new floor and wall finishes. | $108,000 |
| Oct 7, 2019 | Completed final sign-off Sep 2020 | 350 California St | Plant Construction Co, Lp | ground fl: tenant improvement project involves the construction of a new security desk, lobby feature wall, new finishes, and light fixture installation.n/a for maherDetails
ground fl: tenant improvement project involves the construction of a new security desk, lobby feature wall, new finishes, and light fixture installation.n/a for maher | $230,000 |
| Jun 11, 2019 | Completed final sign-off Jun 2022 | 350 California St | Plant Construction Co, Lp | t.i. upgrade of extg retail branch on the 1st floor: includes new finishes new finishes, lighting, office work spaces teller/banking area, atms and banking machines, security and restrooms. n/a for maherDetails
t.i. upgrade of extg retail branch on the 1st floor: includes new finishes new finishes, lighting, office work spaces teller/banking area, atms and banking machines, security and restrooms. n/a for maher | $1,300,000 |
| May 14, 2019 | Completed final sign-off Jun 2019 | 350 California St | Plant Construction Co, Lp | lobby - demo of (e) pendant light fixutre @ 350 california st ground floorDetails
lobby - demo of (e) pendant light fixutre @ 350 california st ground floor | $20,000 |
| May 8, 2019 | Completed final sign-off Sep 2024 | 350 California St | Plant Construction Co, Lp | demo of e lobby fountain and & infill of floor slab. includes demo of basement pump room and selective finishes in basement hallwaysDetails
demo of e lobby fountain and & infill of floor slab. includes demo of basement pump room and selective finishes in basement hallways | $230,000 |
| Oct 11, 2018 | Completed final sign-off Jun 2019 | 1 Post St | Richlen Construction | 15,16,17,18th floors -full floor demo and abatement a5th, 16th & 17th floors.18th flr - partial abatement and full demo.reframe some columns if abated and add soffit. add linear fixtures around & in core & exit signs. sprinkler permit 201810092503 -all floors ab-017 da deferred to ti. maher n/a.Details
15,16,17,18th floors -full floor demo and abatement a5th, 16th & 17th floors.18th flr - partial abatement and full demo.reframe some columns if abated and add soffit. add linear fixtures around & in core & exit signs. sprinkler permit 201810092503 -all floors ab-017 da deferred to ti. maher n/a. | $1,750,000 |
| Nov 21, 2017 | Never finaled issued Nov 2017, no final | 8 Presidio Tr | Principal Builders Inc. | exterior improvements: new equipment pad and screening fence. in response to complaint 201702075. maher naDetails
exterior improvements: new equipment pad and screening fence. in response to complaint 201702075. maher na | $15,000 |
| May 31, 2017 | Never finaled issued Jun 2017, no final | 8 Presidio Tr | Principal Builders Inc. | revision to 201702018439 (n) structural details 10/sheet s5.02 for future sub grade jacuzzi including concrete enclosure wall & foundation, per insp.field condition.Details
revision to 201702018439 (n) structural details 10/sheet s5.02 for future sub grade jacuzzi including concrete enclosure wall & foundation, per insp.field condition. | |
| May 4, 2017 | Completed final sign-off Apr 2018 | 2164 Hyde St | Everest Waterproofing & Restoration Inc. | voluntary strengthening of existing residential balconies. work entails new structural post and beams for supportDetails
voluntary strengthening of existing residential balconies. work entails new structural post and beams for support | $400,000 |
| Feb 17, 2017 | Completed final sign-off Mar 2017 | 655 Montgomery St | Principal Builders Inc. | demolition of ceiling height partitions. space to remain vacant per ab-017 and all ada information to be provided under a future ti permitDetails
demolition of ceiling height partitions. space to remain vacant per ab-017 and all ada information to be provided under a future ti permit | $2,706 |
| Feb 1, 2017 | Never finaled issued Feb 2017, no final | 8 Presidio Tr | Principal Builders Inc. | revision to app#2016-0517-7684. scope includes 1 window infill on west facade, construction of new elevator lift and shaft wall, and slab modifications. elevator itself on deferred submittal.Details
revision to app#2016-0517-7684. scope includes 1 window infill on west facade, construction of new elevator lift and shaft wall, and slab modifications. elevator itself on deferred submittal. | $50,000 |
| Oct 31, 2016 | Completed final sign-off Feb 2018 | 501 02nd St | Novo Construction Inc | 3rd floor: ti to include demo of non load bearing partitions new non load bearing partitions, new ceilings and finishes. map/fie/life safety under sep permit maher naDetails
3rd floor: ti to include demo of non load bearing partitions new non load bearing partitions, new ceilings and finishes. map/fie/life safety under sep permit maher na | $350,000 |
| Aug 2, 2016 | Completed final sign-off Mar 2017 | 633 Folsom St | Bcci Construction Company | ti - partion on the 4th floor & full floor build out on the 7th floor including demolition of ceiling height partitions & construction of ceiling height partitions new lighting & finishes. associated m&e & life safety under separate permitDetails
ti - partion on the 4th floor & full floor build out on the 7th floor including demolition of ceiling height partitions & construction of ceiling height partitions new lighting & finishes. associated m&e & life safety under separate permit | $1,100,000 |
| Jun 7, 2016 | Never finaled issued Mar 2017, no final | 8 Presidio Tr | Principal Builders Inc. | construction of lower level improvement, partial 1st & 2nd floor t.i. and ada restrooms at lower level. core and shell under app#2016-0517-7684. life safety/lula/spa eqpt. deferred.Details
construction of lower level improvement, partial 1st & 2nd floor t.i. and ada restrooms at lower level. core and shell under app#2016-0517-7684. life safety/lula/spa eqpt. deferred. | $200,000 |
| May 17, 2016 | Never finaled issued Jul 2016, no final | 8 Presidio Tr | Malcolm Drilling Co Inc, Principal Builders Inc. | partial excavation of lower level to creat higher ceiling heights. shoring structural work. exterior alterations for lower portion of bldg. minor landscape improvement. ada upgrade under pa# 2016/06/07/9340 per ab-017. space to be unoccupied until ada restored.Details
partial excavation of lower level to creat higher ceiling heights. shoring structural work. exterior alterations for lower portion of bldg. minor landscape improvement. ada upgrade under pa# 2016/06/07/9340 per ab-017. space to be unoccupied until ada restored. | $75,000 |
| Feb 17, 2016 | Expired or cancelled withdrawn May 2017 | 2164 Hyde St | Everest Waterproofing & Restoration Inc. | voluntary strengthening of extg residental balconies. work entail new structural posts and beams for support.Details
voluntary strengthening of extg residental balconies. work entail new structural posts and beams for support. | $400,000 |