Block 0292, lot 015
165 Sutter St
- City’s use
- Commercial Retail
- Built
- 1983
- Stories
- 2
- Building
- 139,070 sq ft
- Lot
- 27,851 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
87 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 14, 2025 | In progress filed Aug 2025, not yet issued | 50 Post St | limited-structural demolition of tenant improvement, fixtures ,finishes, and utility components in the crocker galleria.Details
limited-structural demolition of tenant improvement, fixtures ,finishes, and utility components in the crocker galleria. | $700,000 | |
| Jun 6, 2025 | In progress filed Jun 2025, not yet issued | 50 Post St | core & shell renovation of an open-air retail facility. selective demolition of (e) bldg elements,enclosure of open-air atrium w/ (n) curtain walls, (n) facades on post st. & sutter st.(n) stairs & elevators, infrastructure for (n) commercial cooking facilities,(n) mechanical & smoke control systemsDetails
core & shell renovation of an open-air retail facility. selective demolition of (e) bldg elements,enclosure of open-air atrium w/ (n) curtain walls, (n) facades on post st. & sutter st.(n) stairs & elevators, infrastructure for (n) commercial cooking facilities,(n) mechanical & smoke control systems | $40,000,000 | |
| Dec 18, 2019 | Expired or cancelled withdrawn Apr 2025 | 50 Post St | complete renovation of crocker galleria core and shell. facase and sidewalk to be altered at exterior. architectural. structural, mechnical, eletrical, plumbing to be updated per modern codes. ada upgrades to entry and path of travel.**maher n/a**Details
complete renovation of crocker galleria core and shell. facase and sidewalk to be altered at exterior. architectural. structural, mechnical, eletrical, plumbing to be updated per modern codes. ada upgrades to entry and path of travel.**maher n/a** | $40,000,000 | |
| Feb 10, 2015 | Completed final sign-off Feb 2015 | 50 Post St | B H Chen Inc | relocate 4 existing heads on existing system. no new meterDetails
relocate 4 existing heads on existing system. no new meter | $3,800 |
| Jan 6, 2015 | Completed final sign-off Jan 2015 | 50 Post St | Grand Electric & Construction Co. | demo counters, soffit, lights and flooring. per ab-017 remains still vacant.Details
demo counters, soffit, lights and flooring. per ab-017 remains still vacant. | $5,000 |
| Dec 17, 2014 | Completed final sign-off Aug 2015 | 50 Post St | Grand Electric & Construction Co. | change restaurant on 3rd floor to deli with kitchen - remove existing millwork, add new millwork, add new equipment.Details
change restaurant on 3rd floor to deli with kitchen - remove existing millwork, add new millwork, add new equipment. | $30,000 |
| Oct 6, 2014 | Completed final sign-off Oct 2014 | 50 Post St | Aaa Restaurant Fire Control/Dba Aaa Fire | as built drawings for previous permit #201406249273 for a hood and duct fire suppression system.Details
as built drawings for previous permit #201406249273 for a hood and duct fire suppression system. | $3,000 |
| Jun 24, 2014 | Completed final sign-off Oct 2014 | 50 Post St | Aaa Restaurant Fire Control/Dba Aaa Fire | install one (1) ansul r102 fire suppression system in the main kitchen areaDetails
install one (1) ansul r102 fire suppression system in the main kitchen area | $3,000 |
| May 16, 2014 | Completed final sign-off Oct 2014 | 50 Post St | Johnson Controls Fire | galleria:fire alarm tenant improvement to galleria fl 3 space 58. 1 booster pane, 1 smoke detectors, 1 monitor module, 1 strobe, 1 speaker strobeDetails
galleria:fire alarm tenant improvement to galleria fl 3 space 58. 1 booster pane, 1 smoke detectors, 1 monitor module, 1 strobe, 1 speaker strobe | $3,000 |
| Mar 14, 2014 | Completed final sign-off Jul 2014 | 50 Post St | Johnson Controls Fire | galleria level 1- fire alarm work for new equipment room, 1 smoke, 1 relay, 1 speaker.Details
galleria level 1- fire alarm work for new equipment room, 1 smoke, 1 relay, 1 speaker. | $2,500 |
| Mar 4, 2014 | Completed final sign-off Jan 2015 | 50 Post St | space 58: new sandwich shop re-using existing improvements. adding new millwork and kitchen equipment. mechanical, elec and plumbing to be permited separately. ansul system for ventless hood under separate permit.Details
space 58: new sandwich shop re-using existing improvements. adding new millwork and kitchen equipment. mechanical, elec and plumbing to be permited separately. ansul system for ventless hood under separate permit. | $25,000 | |
| Feb 11, 2014 | Completed final sign-off Jan 2015 | 50 Post St | Novo Construction Inc | barrier removal. level 3 restroomsDetails
barrier removal. level 3 restrooms | $20,000 |
| Feb 11, 2014 | Completed final sign-off Jan 2015 | 50 Post St | Novo Construction Inc | barrier removal level 1 restroomsDetails
barrier removal level 1 restrooms | $20,000 |
| Feb 10, 2014 | Completed final sign-off Apr 2014 | 50 Post St | Anderson, Rowe & Buckley, Inc. | level 1 : fire sprinkler t. i. remove 11 sprinklers and add 7 sprinklers t.i. # 201309197264 has not been issued. n/a for the maher ordinance #155-13Details
level 1 : fire sprinkler t. i. remove 11 sprinklers and add 7 sprinklers t.i. # 201309197264 has not been issued. n/a for the maher ordinance #155-13 | $3,500 |
| Sep 19, 2013 | Completed final sign-off Aug 2014 | 50 Post St | M H Builders | new 650 sf equipment room. new wall, electrical panel, lights, hvac 5h floorDetails
new 650 sf equipment room. new wall, electrical panel, lights, hvac 5h floor | $75,000 |
| Aug 21, 2013 | Never finaled issued Aug 2013, no final | 50 Post St | Simplexgrinnell Lp. | fire alarm t.i. to space #1 galleria fl 01, anderson bread, adding 1 speaker/strobe and one strobe. t.i. 201306210170Details
fire alarm t.i. to space #1 galleria fl 01, anderson bread, adding 1 speaker/strobe and one strobe. t.i. 201306210170 | $3,500 |
| Jul 25, 2013 | Completed final sign-off Aug 2013 | 50 Post St | Ayoob & Peery Plumbing Co Inc | unit #1: t.i relocate 4 sprinkler heads in the 1st floor. t.i app#201306210170Details
unit #1: t.i relocate 4 sprinkler heads in the 1st floor. t.i app#201306210170 | $2,056 |
| Jun 21, 2013 | Completed final sign-off Sep 2013 | 50 Post St | Eric F Anderson Incorporated | expansion of retail space; include alteration of walls and flooring, addition of new walls, quarry tile, cabinetry, restaurant equipment, painting. alterations to existing glass storefront, re-work of plumbing fixtures, new lighting, no change to hvac system. vif non infringement to smoke control.Details
expansion of retail space; include alteration of walls and flooring, addition of new walls, quarry tile, cabinetry, restaurant equipment, painting. alterations to existing glass storefront, re-work of plumbing fixtures, new lighting, no change to hvac system. vif non infringement to smoke control. | $95,000 |
| May 20, 2013 | Completed final sign-off Jun 2013 | 50 Post St | Certified Fire & Safety Co | install ansul fire system to p0rotect kitchen hood and cooking equipment. install ansul fire ssytem to protect pollution control unit (pcu). ref app#201209200283 on 1st floor.Details
install ansul fire system to p0rotect kitchen hood and cooking equipment. install ansul fire ssytem to protect pollution control unit (pcu). ref app#201209200283 on 1st floor. | $10,000 |
| Apr 3, 2013 | Completed final sign-off Apr 2013 | 50 Post St | Simplexgrinnell Lp. | fire alarm system t.i. gallaria level 01, weight watchers. 3 new speaker/strobe and sync module. t.i. 201209270812Details
fire alarm system t.i. gallaria level 01, weight watchers. 3 new speaker/strobe and sync module. t.i. 201209270812 | $2,500 |
| Mar 27, 2013 | Completed final sign-off Apr 2013 | 50 Post St | R L H Fire Protection Inc | suite #19 & 26-relocate 15 pendent sprinklers due to new ceiling & wall configurationDetails
suite #19 & 26-relocate 15 pendent sprinklers due to new ceiling & wall configuration | $3,200 |
| Mar 15, 2013 | Never finaled issued Mar 2013, no final | 50 Post St | Aaa Restaurant Fire Control/Dba Aaa Fire | furnish and install one ansul r102 fire suppression system in the main kitchen area.Details
furnish and install one ansul r102 fire suppression system in the main kitchen area. | $2,500 |
| Mar 7, 2013 | Never finaled issued Mar 2013, no final | 50 Post St | Simplexgrinnell Lp. | #38a -street level & lower level fire alarm t.i. to crocker galleria - 1 monitor module for kitchen hood, 7 speaker/strobes. ref t.i.#2012.0920.0283.Details
#38a -street level & lower level fire alarm t.i. to crocker galleria - 1 monitor module for kitchen hood, 7 speaker/strobes. ref t.i.#2012.0920.0283. | $5,000 |
| Mar 7, 2013 | Never finaled issued Mar 2013, no final | 50 Post St | Simplexgrinnell Lp. | level 03: fire alarm ti to galleria flr 3, 1 monitor module for kitchen hood, 2 speaker/strobe, giorgios pizza ti #201301097551Details
level 03: fire alarm ti to galleria flr 3, 1 monitor module for kitchen hood, 2 speaker/strobe, giorgios pizza ti #201301097551 | $5,000 |
| Feb 28, 2013 | Never finaled issued Feb 2013, no final | 50 Post St | Pribuss Engineering Inc | 1st floor & basement level fire sprinkler t.i. - plug one (demo) , add 4 sprinkler heads, relocate 1 sprinkler head. ref pa #2012.09.20.0283.Details
1st floor & basement level fire sprinkler t.i. - plug one (demo) , add 4 sprinkler heads, relocate 1 sprinkler head. ref pa #2012.09.20.0283. | $2,573 |
| Feb 21, 2013 | Completed final sign-off Mar 2013 | 50 Post St | Pribuss Engineering Inc | fiire sprinkler ti. pa# 201301097551. add 2 sprinklers, relocate 12 sprinklers, relocate & change out 3 sprinklersDetails
fiire sprinkler ti. pa# 201301097551. add 2 sprinklers, relocate 12 sprinklers, relocate & change out 3 sprinklers | $8,749 |
| Jan 9, 2013 | Completed final sign-off May 2013 | 50 Post St | new restaurant in existing vacant space to include millwork, kitchen , walk in refrigerator & an office. new finishes & lighting on 3rd fl.Details
new restaurant in existing vacant space to include millwork, kitchen , walk in refrigerator & an office. new finishes & lighting on 3rd fl. | $50,000 | |
| Nov 16, 2012 | Completed final sign-off Apr 2013 | 161 Sutter St | Simplexgrinnell Lp. | fire alarm system ti 1 new monitor modul for supervision of security security panel, galleria level 1.Details
fire alarm system ti 1 new monitor modul for supervision of security security panel, galleria level 1. | $8,500 |
| Oct 31, 2012 | Completed final sign-off Nov 2012 | 161 Sutter St | Anderson, Rowe & Buckley, Inc. | 3rd floor:t.i. extg fire sprinkler system,one added sprinkler, 16 relocated sprinklersDetails
3rd floor:t.i. extg fire sprinkler system,one added sprinkler, 16 relocated sprinklers | $8,500 |
| Oct 5, 2012 | Completed final sign-off Apr 2013 | 161 Sutter St | San Francisco Commercial Builders Inc | 3rd floor space 61 - mechanical work - ductwork to be modified, new transfer fan is added, no new fsds are being added. reference change of use under pa #2012.05.18.0734.Details
3rd floor space 61 - mechanical work - ductwork to be modified, new transfer fan is added, no new fsds are being added. reference change of use under pa #2012.05.18.0734. | $30,000 |
| Sep 27, 2012 | Completed final sign-off Apr 2013 | 50 Post St | Horizon Retail Construction Inc | suites 19 & 26th:demolition of extg space. install new acoustical cieling. relocate sprinkler heads as required. install new partitions. install new lighting. install new flooring. paint install new outlets and exit lights. install new millwork.Details
suites 19 & 26th:demolition of extg space. install new acoustical cieling. relocate sprinkler heads as required. install new partitions. install new lighting. install new flooring. paint install new outlets and exit lights. install new millwork. | $80,000 |
| Sep 20, 2012 | Completed final sign-off Jun 2013 | 50 Post St | San Francisco Commercial Builders Inc | renovation to (e) ground floor and lower level retail space. accessibility upgrades to tenant entry door, restrooms and stair replacement. installation of commericial kitchen, construction of new partitions, door, electrical plumbing and mech.Details
renovation to (e) ground floor and lower level retail space. accessibility upgrades to tenant entry door, restrooms and stair replacement. installation of commericial kitchen, construction of new partitions, door, electrical plumbing and mech. | $450,000 |
| Aug 27, 2012 | Completed final sign-off Oct 2012 | 50 Post St | Rafferty Construction Inc | space 64 a: revision to extg bldg permit #201206202989. revise construction type from type 5b to type 1 construction. "as built"Details
space 64 a: revision to extg bldg permit #201206202989. revise construction type from type 5b to type 1 construction. "as built" | |
| Aug 17, 2012 | Never finaled issued Aug 2012, no final | 50 Post St | Value Fire Protection Inc | fire modification for tenant improvement, space 64a. relocation of (8) heads.Details
fire modification for tenant improvement, space 64a. relocation of (8) heads. | $2,400 |
| Aug 15, 2012 | Completed final sign-off Jan 2013 | 50 Post St | Integrated Sign Installations Inc | erect an electric wall single faced new sign "jimmy john's"Details
erect an electric wall single faced new sign "jimmy john's" | $800 |
| Jun 20, 2012 | Completed final sign-off Oct 2012 | 50 Post St | crocker galleria - level 3, space #64a - 3rd floor-t.i. to an (e) 584 sq ft vacant retail space for a sandwich shop located on the 3rd fl of crocker galleria-new partitions, ceilings, equipment, finishes, lighting & associated electrical, plumbing & mechanical workDetails
crocker galleria - level 3, space #64a - 3rd floor-t.i. to an (e) 584 sq ft vacant retail space for a sandwich shop located on the 3rd fl of crocker galleria-new partitions, ceilings, equipment, finishes, lighting & associated electrical, plumbing & mechanical work | $76,000 | |
| May 18, 2012 | Completed final sign-off Apr 2013 | 161 Sutter St | San Francisco Commercial Builders Inc | #61- tenant improvements including new non load bearing partitons, ceilings, finishes. extent of work is limited to floor 3, tenant space 61. change of occupancy use from restaurant to beauty salonDetails
#61- tenant improvements including new non load bearing partitons, ceilings, finishes. extent of work is limited to floor 3, tenant space 61. change of occupancy use from restaurant to beauty salon | $210,000 |
| Feb 2, 2012 | Never finaled issued Feb 2012, no final | 50 Post St | Socha Visual Inc | remove existing and replace with new evacuation maps to new standards of sffd, field-verify locations.Details
remove existing and replace with new evacuation maps to new standards of sffd, field-verify locations. | $3,000 |
| Nov 21, 2011 | Completed final sign-off Dec 2011 | 50 Post St | Gotham Bay Construction | minor interior alteration to (e) restaurant including (n) flooring (n) ceiling, (n) casework, (n) partition. no changes to mechanical or lighting. fire protection under separate permit.Details
minor interior alteration to (e) restaurant including (n) flooring (n) ceiling, (n) casework, (n) partition. no changes to mechanical or lighting. fire protection under separate permit. | $76,200 |
| Nov 16, 2011 | Completed final sign-off Dec 2011 | 50 Post St | Pioneer Fire Inc. | suite #55 & 56-relocate 3 fire sprinklers, adjust 8 fire sprinklers to match new ceiling height. add 2 fire sprinklersDetails
suite #55 & 56-relocate 3 fire sprinklers, adjust 8 fire sprinklers to match new ceiling height. add 2 fire sprinklers | $2,000 |
| Nov 16, 2011 | Never finaled issued Nov 2011, no final | 50 Post St | Gotham Bay Construction | space 55 & 56 - interior soft demo (non-structural) in advance of tenant improvement under separate permit. fire protection under separate permit.Details
space 55 & 56 - interior soft demo (non-structural) in advance of tenant improvement under separate permit. fire protection under separate permit. | $6,200 |
| Oct 16, 2009 | Completed final sign-off Mar 2010 | 50 Post St | Bcci Construction Company | 1st floor-mechanical and electrical work associated with app 2009100886025 including new exhaust fans and lighting. ls under separate permitDetails
1st floor-mechanical and electrical work associated with app 2009100886025 including new exhaust fans and lighting. ls under separate permit | $113,195 |
| Oct 8, 2009 | Completed final sign-off Mar 2010 | 50 Post St | Bcci Construction Company | 1st floor tenant improvement for suite 5,6,7,16 & 17 to i nclude minor demolition, new partitions, doors, ceilings & finishes. mechanical, electrical, life safety & sprinkler under separate permit.Details
1st floor tenant improvement for suite 5,6,7,16 & 17 to i nclude minor demolition, new partitions, doors, ceilings & finishes. mechanical, electrical, life safety & sprinkler under separate permit. | $155,000 |
| Jan 3, 2008 | Completed final sign-off Jun 2008 | 50 Post St | space#10 level 1. remodel interior of old food retail space to yogurt retail shop. redoing some plumbing, electrical, & flooring.Details
space#10 level 1. remodel interior of old food retail space to yogurt retail shop. redoing some plumbing, electrical, & flooring. | $62,000 | |
| Nov 21, 2007 | Completed final sign-off Nov 2007 | 50 Post St | San Francisco Commercial Builders Inc | clarification of info for # of stories shown on app #200704037884 #200705040544 200710125276 #200707318241 # stories should have read 38 and not 3 application #200704037884 address should state 50 post lot #15 instead of 1 montgomery st & lot 002Details
clarification of info for # of stories shown on app #200704037884 #200705040544 200710125276 #200707318241 # stories should have read 38 and not 3 application #200704037884 address should state 50 post lot #15 instead of 1 montgomery st & lot 002 | |
| Oct 12, 2007 | Completed final sign-off Nov 2007 | 50 Post St | Ok Fire System | install a fire system in a kitchen hood. ansul fire system hood and duct.Details
install a fire system in a kitchen hood. ansul fire system hood and duct. | $3,500 |
| Aug 22, 2007 | Never finaled issued Aug 2007, no final | 50 Post St | Occidental Express | coreect number of stories on pa# 200706285054-from 35 to 38 storiesDetails
coreect number of stories on pa# 200706285054-from 35 to 38 stories | |
| Jul 31, 2007 | Completed final sign-off Nov 2007 | 50 Post St | Potter Fire Protection | 3rd floor-relocate 5 fire sprinklers on level 3 onlyDetails
3rd floor-relocate 5 fire sprinklers on level 3 only | $1,800 |
| Jun 25, 2007 | Completed final sign-off Aug 2007 | 50 Post St | Occidental Express | establishing of a chair massage store front incl. installing of portable partitions, construction of storage room, carpet installation, painting, replacing fluorescent lights with fluorescent lightsDetails
establishing of a chair massage store front incl. installing of portable partitions, construction of storage room, carpet installation, painting, replacing fluorescent lights with fluorescent lights | $18,000 |
| May 4, 2007 | Completed final sign-off Nov 2007 | 50 Post St | San Francisco Commercial Builders Inc | 3rd floor - tenant improvement to include new partitions, lighting, electric, mill work equipment, mechical and finishes for a restaurant. no exterior or strutural work. convert to a full restaurant.Details
3rd floor - tenant improvement to include new partitions, lighting, electric, mill work equipment, mechical and finishes for a restaurant. no exterior or strutural work. convert to a full restaurant. | $107,000 |
| Apr 27, 2007 | Never finaled issued Apr 2007, no final | 165 Sutter St | Western Roofing Service | reroofingDetails
reroofing | $160,000 |
| Mar 7, 2007 | Expired or cancelled expired Apr 2009 | 161 Sutter St | Aaa Restaurant Fire Control/Dba Aaa Fire | install fire suppression system for hood & duct. 6 spray heads.Details
install fire suppression system for hood & duct. 6 spray heads. | $2,500 |
| Oct 19, 2006 | Completed final sign-off Dec 2006 | 50 Post St | Potter Fire Protection | relocate 12 fire sprklr on the street level dermatology suite onlyDetails
relocate 12 fire sprklr on the street level dermatology suite only | $3,000 |
| Oct 10, 2006 | Completed final sign-off Dec 2006 | 50 Post St | non structural interior tenant improvement. new partitions, new ceiling (gyp+acoustic) new elec power & lighting, new accessible restroom. demolition approved underDetails
non structural interior tenant improvement. new partitions, new ceiling (gyp+acoustic) new elec power & lighting, new accessible restroom. demolition approved under | $122,000 | |
| Sep 26, 2006 | Completed final sign-off Dec 2006 | 50 Post St | interior non structral demolition: remov partitions light fixtures in vcant space, life saafety devices and sprinklers to remain in plae and operationalDetails
interior non structral demolition: remov partitions light fixtures in vcant space, life saafety devices and sprinklers to remain in plae and operational | $3,200 | |
| Mar 1, 2006 | Completed final sign-off Apr 2006 | 50 Post St | Acg Construction Inc | t.i. for bakery style cafe. no exterior work.Details
t.i. for bakery style cafe. no exterior work. | $137,000 |
| Jan 24, 2006 | Never finaled issued Jan 2006, no final | 50 Post St | new cabinets, millwork and finish details for existing coffee shop. no change to storefront and no new wallsDetails
new cabinets, millwork and finish details for existing coffee shop. no change to storefront and no new walls | $75,000 | |
| Jan 13, 2006 | Never finaled issued Jan 2006, no final | 50 Post St | interior non structural soft demo of extg spaceDetails
interior non structural soft demo of extg space | $11,000 | |
| Nov 7, 2005 | Expired or cancelled withdrawn May 2006 | 50 Post St | remodel (e) coffee shopDetails
remodel (e) coffee shop | $75,000 | |
| Sep 12, 2005 | Completed final sign-off Jan 2006 | 50 Post St | Potter Fire Protection | relocate (18) and plug (8) fire sprinklers on level one onlyDetails
relocate (18) and plug (8) fire sprinklers on level one only | $4,000 |
| Jul 29, 2005 | Never finaled issued Jul 2005, no final | 161 Sutter St | replacement canopy structure - signage under separate permitDetails
replacement canopy structure - signage under separate permit | $10,000 | |
| Jul 19, 2005 | Completed final sign-off Nov 2005 | 161 Sutter St | All Purpose Fire Protection | assemble fire system in hood to protect stove, fryer, griddle, ducts - 3rd floorDetails
assemble fire system in hood to protect stove, fryer, griddle, ducts - 3rd floor | $600 |
| Jul 6, 2005 | Completed final sign-off Jan 2006 | 50 Post St | non structural t.i.,new partions,replace suspended ceiling,new lighting,new restroom.Details
non structural t.i.,new partions,replace suspended ceiling,new lighting,new restroom. | $105,000 | |
| Jun 16, 2005 | Completed final sign-off Nov 2005 | 161 Sutter St | erect sign - non-electric, single faced, replacement, non-illuminated.Details
erect sign - non-electric, single faced, replacement, non-illuminated. | ||
| Jun 16, 2005 | Completed final sign-off Nov 2005 | 161 Sutter St | erect sign - electric, single faced, wall, replacement, direct.Details
erect sign - electric, single faced, wall, replacement, direct. | ||
| May 13, 2005 | Completed final sign-off Nov 2005 | 161 Sutter St | Pribuss Engineering Inc | fire sprkr t.i. jc 2198 medicine restaurant level 3 space#61.Details
fire sprkr t.i. jc 2198 medicine restaurant level 3 space#61. | $13,500 |
| May 10, 2005 | Completed final sign-off Nov 2005 | 161 Sutter St | barrier removal & health code finish upgrade to existing good prep area. widen doors, constructionDetails
barrier removal & health code finish upgrade to existing good prep area. widen doors, construction | $25,000 | |
| Feb 15, 2005 | Completed final sign-off Nov 2005 | 161 Sutter St | interior t.i for new restaurant: non structural partitions, new lighting, plumbing + mechanical workDetails
interior t.i for new restaurant: non structural partitions, new lighting, plumbing + mechanical work | $422,000 | |
| Feb 15, 2005 | Completed final sign-off Nov 2005 | 161 Sutter St | non structural demo of tenant interior improvements to expose base building conditions, removal ofDetails
non structural demo of tenant interior improvements to expose base building conditions, removal of | $63,000 | |
| Oct 13, 2004 | Never finaled issued Oct 2004, no final | 165 Sutter St | La Hue & Associates Inc. | remove part of (e)structure to expand banner area, reuse of (e) attachments/connsDetails
remove part of (e)structure to expand banner area, reuse of (e) attachments/conns | |
| Nov 12, 2003 | Completed final sign-off Apr 2004 | 50 Post St | renew#200305094167 to complete workDetails
renew#200305094167 to complete work | $1,500 | |
| Oct 17, 2003 | Completed final sign-off May 2004 | 165 Sutter St | Cannon Constructors North Inc | demo & construction of partition & opening modification of (e) cash wrap & const of new cash wrap poDetails
demo & construction of partition & opening modification of (e) cash wrap & const of new cash wrap po | $17,800 |
| Aug 27, 2003 | Expired or cancelled expired Jul 2005 | 165 Sutter St | La Hue & Associates Inc. | to erect non-electrical signDetails
to erect non-electrical sign | |
| May 9, 2003 | Expired or cancelled expired Apr 2004 | 50 Post St | install a 2 hrs access panel to access a retail display windowDetails
install a 2 hrs access panel to access a retail display window | $1,500 | |
| Mar 5, 2002 | Expired or cancelled expired Sep 2003 | 50 Post St | Ok Fire System | install five system in kitchen hood, unit 63Details
install five system in kitchen hood, unit 63 | $1,500 |
| Mar 5, 2002 | Expired or cancelled expired Sep 2003 | 50 Post St | Ok Fire System | install fire system in kitchen hood. work is on 3rd fl, unit #64.Details
install fire system in kitchen hood. work is on 3rd fl, unit #64. | $1,500 |
| Jan 28, 2002 | Completed final sign-off Jul 2002 | 50 Post St | West And East Bay Cosntruction, Inc | relocate fire sprinkler heads in both spaces. work is on 3rd fl. only. spaces 63,64aDetails
relocate fire sprinkler heads in both spaces. work is on 3rd fl. only. spaces 63,64a | $5,000 |
| Jan 8, 2002 | Completed final sign-off Jun 2002 | 50 Post St | mechanical portion of t.i. approved on previous permit #200112265921 on the 3rd floor space 63Details
mechanical portion of t.i. approved on previous permit #200112265921 on the 3rd floor space 63 | $5,000 | |
| Dec 26, 2001 | Completed final sign-off Jun 2002 | 50 Post St | interior t/i for self-serve restaurant, (n) partitons, (n) lighting, (n) t-bar ceilingDetails
interior t/i for self-serve restaurant, (n) partitons, (n) lighting, (n) t-bar ceiling | $82,300 | |
| Dec 21, 2001 | Completed final sign-off Jun 2002 | 50 Post St | mechanical portion for interior t.i. for self-serve restaurant under app #200111163387Details
mechanical portion for interior t.i. for self-serve restaurant under app #200111163387 | $7,000 | |
| Nov 16, 2001 | Completed final sign-off Jun 2002 | 50 Post St | spac 64a 3/fl t/i self serve restaurant new partitions finishes casewrk and lighting mecDetails
spac 64a 3/fl t/i self serve restaurant new partitions finishes casewrk and lighting mec | $50,000 | |
| Nov 16, 2001 | Expired or cancelled expired Sep 2003 | 50 Post St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler heads per t/i (8 heads only)Details
relocate fire sprinkler heads per t/i (8 heads only) | $1,800 |
| Oct 22, 2001 | Completed final sign-off Apr 2002 | 50 Post St | Peacock Construction Inc | lighting, millwork,paint,flooring,drywall ceiling.power,data,no chg to mechanical.Details
lighting, millwork,paint,flooring,drywall ceiling.power,data,no chg to mechanical. | $68,000 |
| Nov 15, 2000 | Expired or cancelled expired May 2001 | 50 Post St | Swinerton Builders | sprinkler relocation and duct relocates at 3rd floor onlyDetails
sprinkler relocation and duct relocates at 3rd floor only | $7,000 |
| Oct 16, 2000 | Expired or cancelled expired Dec 2001 | 50 Post St | Swinerton Builders | interior tenant improvements in (e restaurant new clg height partitions & associated elect & finishDetails
interior tenant improvements in (e restaurant new clg height partitions & associated elect & finish | $42,400 |
| Jul 24, 2000 | Expired or cancelled expired Nov 2000 | 50 Post St | non structural ti to retail space renew permit 896070 for finalDetails
non structural ti to retail space renew permit 896070 for final | ||
| Feb 18, 2000 | Expired or cancelled expired Jun 2000 | 50 Post St | fire sprinkler tenant improvementDetails
fire sprinkler tenant improvement | $2,200 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.