Dustin Curtis
- License
- C28698
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Curtis Arch
- Based in
- Saint Louis
- On San Francisco permits
- Sep 2012 to Aug 2014
3 permits since 2000 (architect on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Tri-North Builders Inc (2), Horizon Retail Construction Inc
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 25, 2014 | Completed final sign-off Oct 2014 | 3251 20th Av | Tri-North Builders Inc | space 267:demolition of extg fixtures drywall and walls. remove flooring.Details
space 267:demolition of extg fixtures drywall and walls. remove flooring. | $10,000 |
| Jul 8, 2014 | Completed final sign-off Oct 2014 | 3251 20th Av | Tri-North Builders Inc | ti space #267 for " charming charlie " 4568 sq ft. partitions, doors, ceilings, finishes, mep. no final inspection & / or cfc issuance until pa# 2014/06/27/9771. ab-56 permit is complete & letter issued to process.Details
ti space #267 for " charming charlie " 4568 sq ft. partitions, doors, ceilings, finishes, mep. no final inspection & / or cfc issuance until pa# 2014/06/27/9771. ab-56 permit is complete & letter issued to process. | $190,000 |
| Sep 27, 2012 | Completed final sign-off Apr 2013 | 50 Post St | Horizon Retail Construction Inc | suites 19 & 26th:demolition of extg space. install new acoustical cieling. relocate sprinkler heads as required. install new partitions. install new lighting. install new flooring. paint install new outlets and exit lights. install new millwork.Details
suites 19 & 26th:demolition of extg space. install new acoustical cieling. relocate sprinkler heads as required. install new partitions. install new lighting. install new flooring. paint install new outlets and exit lights. install new millwork. | $80,000 |