Block 0310, lot 001
101 Post St
- City’s use
- Commercial Retail
- Built
- 1969
- Stories
- 3
- Rooms
- 4 bathrooms
- Building
- 19,875 sq ft
- Lot
- 4,401 sq ft
- Zoning
- C3O
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
60 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 8, 2026 | In progress filed Sep 2026, not yet issued | 101 Post St | removal and replacement of the ceramic tile flooring at the exterior side of the main entrance vestibule.Details
removal and replacement of the ceramic tile flooring at the exterior side of the main entrance vestibule. | $25,000 | |
| Aug 19, 2025 | Completed final sign-off Sep 2025 | 101 Post St | Bigham Taylor Roofing Co | re-roofing no torch downDetails
re-roofing no torch down | $56,029 |
| Jul 30, 2025 | Completed final sign-off Mar 2026 | 101 Post St | Airco Mechanical Inc | interior t.i. of new supplemental mechanical equipent-ceiling, electrical scope. existing food service not affected by the scope of work.Details
interior t.i. of new supplemental mechanical equipent-ceiling, electrical scope. existing food service not affected by the scope of work. | $175,000 |
| Jul 24, 2025 | Completed final sign-off Sep 2025 | 101 Post St | Johnson Controls Fire | provide and install (n) 2 duct detectors for shutdown hvac units as shown on drawingsDetails
provide and install (n) 2 duct detectors for shutdown hvac units as shown on drawings | $3,000 |
| Apr 22, 2025 | Completed final sign-off Jun 2025 | 101 Post St | C B F Inc | to obtain a final inspection for work approved under permit 202204252917. all work complete.Details
to obtain a final inspection for work approved under permit 202204252917. all work complete. | $60,000 |
| Mar 28, 2025 | Completed final sign-off Jan 2026 | 101 Post St | Acco Engineered Systems Inc. Dba Acco En | acco to perform design-build mech construction services to remove/ replace e) 60 ton carrier rooftop cooling only air condition unit w/ a new like for like 60 ton rooftop cooling only unitDetails
acco to perform design-build mech construction services to remove/ replace e) 60 ton carrier rooftop cooling only air condition unit w/ a new like for like 60 ton rooftop cooling only unit | $325,000 |
| Sep 23, 2022 | Completed final sign-off Dec 2022 | 101 Post St | R L H Fire Protection Inc | voluntary elevator modernization per sffd letter remove sprinkler heads all piping from mech, top of shaft and pit. no other work.Details
voluntary elevator modernization per sffd letter remove sprinkler heads all piping from mech, top of shaft and pit. no other work. | $1,000 |
| Apr 25, 2022 | Never finaled issued Dec 2022, no final | 101 Post St | Johnson Controls Fire | modify (e) fire alarm system, upgrade panel with a new 4100es facp; all (e) horn/strobe appliance shall be replaced with new speaker strobes and strobe only appliances; no changes to the wire or circuit is rewiredDetails
modify (e) fire alarm system, upgrade panel with a new 4100es facp; all (e) horn/strobe appliance shall be replaced with new speaker strobes and strobe only appliances; no changes to the wire or circuit is rewired | $10,900 |
| Jul 12, 2019 | Never finaled issued Jul 2019, no final | 101 Post St | street spaceDetails
street space | ||
| Apr 4, 2019 | Completed final sign-off Feb 2020 | 101 Post St | ref: 2017-1113-3866: modify existing fire alarm system. add 2 wall horn strobes 5 wall strobes relocate 2 wall horn/strobes.Details
ref: 2017-1113-3866: modify existing fire alarm system. add 2 wall horn strobes 5 wall strobes relocate 2 wall horn/strobes. | $22,254 | |
| Mar 26, 2019 | Completed final sign-off Aug 2019 | 101 Post St | Superior Automatic Sprinkler | 12 adds and relocate 19. ref 201810294350Details
12 adds and relocate 19. ref 201810294350 | $21,700 |
| Jan 3, 2019 | Never finaled issued Jan 2019, no final | 101 Post St | street space with meters.Details
street space with meters. | ||
| Jan 3, 2019 | Never finaled issued Jan 2019, no final | 101 Post St | street space with meters.Details
street space with meters. | ||
| Nov 21, 2018 | Completed final sign-off Aug 2019 | 101 Post St | Bulley & Andrews Inc. | interior ti on ground floor (e) coffee bar refresh surface finish upgrades no change to (e) function of space. work includes minimul demo, plm & powerDetails
interior ti on ground floor (e) coffee bar refresh surface finish upgrades no change to (e) function of space. work includes minimul demo, plm & power | $40,000 |
| Oct 29, 2018 | Completed final sign-off Sep 2019 | 101 Post St | Bulley & Andrews Inc. | revision 201711133866 to include modifications of nook spaces, mullion spaces at atm vestibule additional millwork, furniture changes. finishes and lightingDetails
revision 201711133866 to include modifications of nook spaces, mullion spaces at atm vestibule additional millwork, furniture changes. finishes and lighting | |
| Oct 9, 2018 | Never finaled issued Oct 2018, no final | 101 Post St | street spaceDetails
street space | ||
| Aug 6, 2018 | Never finaled issued Aug 2018, no final | 101 Post St | street spaceDetails
street space | ||
| Dec 26, 2017 | Never finaled issued Aug 2018, no final | 101 Post St | Golden Gate Sign Company Inc. | erect electric double faced sign, projecting. **maher n/a**Details
erect electric double faced sign, projecting. **maher n/a** | $10,000 |
| Dec 26, 2017 | Completed final sign-off Aug 2019 | 101 Post St | Golden Gate Sign Company Inc. | erect a electric doubled faced sign, interior window. **maher n/a**Details
erect a electric doubled faced sign, interior window. **maher n/a** | $5,000 |
| Dec 26, 2017 | Never finaled issued Aug 2018, no final | 101 Post St | Golden Gate Sign Company Inc. | erect a electric single faced wall sign. **maher n/a**Details
erect a electric single faced wall sign. **maher n/a** | $10,000 |
| Nov 13, 2017 | Completed final sign-off Sep 2019 | 101 Post St | Bulley & Andrews Inc. | ti on basement, ground, mezz and rooftop. floors for single tenant incl. selective demo, partition, structural (roof equip curb and anchorage; bsmt shear wall modifications). mep, ceiling, lighting and finishes. exist. food service facility is not affected by this permitDetails
ti on basement, ground, mezz and rooftop. floors for single tenant incl. selective demo, partition, structural (roof equip curb and anchorage; bsmt shear wall modifications). mep, ceiling, lighting and finishes. exist. food service facility is not affected by this permit | $2,500,000 |
| Jun 19, 2017 | Completed final sign-off Mar 2019 | 101 Post St | Bulley & Andrews Inc. | replace e exterior finishes in kind, new paint at e parapet, lintles, sills, stucco. replace e stonetile cladding in kind with new brick tile veneerDetails
replace e exterior finishes in kind, new paint at e parapet, lintles, sills, stucco. replace e stonetile cladding in kind with new brick tile veneer | $15,275 |
| Jul 14, 2016 | Completed final sign-off Aug 2016 | 101 Post St | Western Allied Mechanical Inc. | install (2) fan coil units for additional cooling for conference space on 3rd floor & roof.Details
install (2) fan coil units for additional cooling for conference space on 3rd floor & roof. | $50,000 |
| Jun 7, 2016 | Never finaled issued Jun 2016, no final | 101 Post St | Coast Sign Incorporated | remove "360 cafe" logo and center existing "capital one" sign on canopy. change lettering on existing canopy. n/a for maher.Details
remove "360 cafe" logo and center existing "capital one" sign on canopy. change lettering on existing canopy. n/a for maher. | $1,000 |
| Jun 24, 2014 | Never finaled issued Dec 2014, no final | 101 Post St | Golden Gate Sign Company Inc. | install 2 sets of non-illuminated single faced non-electric aluminum letters onto ends of extg canopy for " peets coffee "tea" n/a for the maher ordinanace #155-13Details
install 2 sets of non-illuminated single faced non-electric aluminum letters onto ends of extg canopy for " peets coffee "tea" n/a for the maher ordinanace #155-13 | $1,000 |
| Jun 24, 2014 | Completed final sign-off Sep 2014 | 101 Post St | Horizon Retail Construction Inc | remodel of existing cafe, new interior walls, new plumbing fixtures, new supply & returns. n/a ordinance #155-13.Details
remodel of existing cafe, new interior walls, new plumbing fixtures, new supply & returns. n/a ordinance #155-13. | $150,000 |
| Jun 24, 2014 | Never finaled issued Dec 2014, no final | 101 Post St | Golden Gate Sign Company Inc. | painted non-structural sign. install 2 sets of door vinyl for "capital one cafe" measuring 4"h x 18"w each. n/a for the maher ordinance #155-13Details
painted non-structural sign. install 2 sets of door vinyl for "capital one cafe" measuring 4"h x 18"w each. n/a for the maher ordinance #155-13 | $200 |
| Jun 24, 2014 | Completed final sign-off Aug 2015 | 101 Post St | Golden Gate Sign Company Inc. | install 4 illuminated double faced electric window sign on bldg interior. n/a for the maher ordinanace #155-13Details
install 4 illuminated double faced electric window sign on bldg interior. n/a for the maher ordinanace #155-13 | $6,000 |
| Jun 24, 2014 | Never finaled issued Dec 2014, no final | 101 Post St | Golden Gate Sign Company Inc. | install 1 sets of non-illuminated aluminum letters onto face of extg canopy for "capital one cafe" n/a for the maher ordinanace #155-13Details
install 1 sets of non-illuminated aluminum letters onto face of extg canopy for "capital one cafe" n/a for the maher ordinanace #155-13 | $500 |
| Apr 23, 2014 | Completed final sign-off Feb 2015 | 101 Post St | Bcci Construction Company | 2/f: revision to app# 201308093986, request for technical infeasibility an office t.i.-non conforming clear space at restroom.Details
2/f: revision to app# 201308093986, request for technical infeasibility an office t.i.-non conforming clear space at restroom. | |
| Nov 12, 2013 | Completed final sign-off Jan 2014 | 101 Post St | Johnson Controls Fire | fire alarm t.i. to 2nd floor. seven new horn/strobes. t.i. 201308093986Details
fire alarm t.i. to 2nd floor. seven new horn/strobes. t.i. 201308093986 | $4,000 |
| Nov 4, 2013 | Completed final sign-off Jan 2014 | 101 Post St | Cisco Fire Sprinklers, Inc. | 2nd floor-relocate & add 10 fire sprinklers & upgrade bracing on (e) systemDetails
2nd floor-relocate & add 10 fire sprinklers & upgrade bracing on (e) system | $6,000 |
| Oct 25, 2013 | Completed final sign-off Feb 2015 | 101 Post St | Bcci Construction Company | reivision to pa# 2013-0809-3986-delete rated walls from work area, replace with accoustic walls, remove fire dampers. room does not need to be rated per sfab 060Details
reivision to pa# 2013-0809-3986-delete rated walls from work area, replace with accoustic walls, remove fire dampers. room does not need to be rated per sfab 060 | |
| Aug 9, 2013 | Completed final sign-off Feb 2015 | 101 Post St | Bcci Construction Company | inter connecting stair between 2 & 3 floors. 2nd floor t.i. conference and break room build out. new lighting and electrical. demo restroom finishes, partial removal of slab above to 3rd floor for new stair. construct non-structural partitions, doors. mepDetails
inter connecting stair between 2 & 3 floors. 2nd floor t.i. conference and break room build out. new lighting and electrical. demo restroom finishes, partial removal of slab above to 3rd floor for new stair. construct non-structural partitions, doors. mep | $500,000 |
| Dec 10, 2012 | Completed final sign-off May 2013 | 101 Post St | Golden Gate Sign Company Inc. | erect non-electric, wall, single-faced, non-illuminated, new sign.Details
erect non-electric, wall, single-faced, non-illuminated, new sign. | $2,000 |
| Dec 10, 2012 | Completed final sign-off May 2013 | 101 Post St | Golden Gate Sign Company Inc. | painted non-electric, projecting, double-faced, non-illuminated, replacement canvas banner.Details
painted non-electric, projecting, double-faced, non-illuminated, replacement canvas banner. | $2,000 |
| Dec 19, 2011 | Completed final sign-off Dec 2011 | 101 Post St | Allied Fire Protection | mezz, 2nd & 3rd level - level 2 relcoate 10 sprinklers, add 4; level 3 relcoate 9 sprinklers, add 4; mezz relocate 6 sprinklers. change of use under pa #201105246683.Details
mezz, 2nd & 3rd level - level 2 relcoate 10 sprinklers, add 4; level 3 relcoate 9 sprinklers, add 4; mezz relocate 6 sprinklers. change of use under pa #201105246683. | $12,500 |
| Nov 14, 2011 | Never finaled issued Nov 2011, no final | 101 Post St | Intelligent Technologies & Services Inc | provide clean agent system in basement server room.Details
provide clean agent system in basement server room. | $8,100 |
| Oct 31, 2011 | Never finaled issued Oct 2011, no final | 101 Post St | street space with mtaDetails
street space with mta | ||
| Oct 31, 2011 | Completed final sign-off Dec 2011 | 101 Post St | Allied Fire Protection | basement & 1st floor-add 31 sprinkler & relocated 3 sprinklers on 2 floors. basement & level 1. change of use pa # 2011-0524-6683Details
basement & 1st floor-add 31 sprinkler & relocated 3 sprinklers on 2 floors. basement & level 1. change of use pa # 2011-0524-6683 | $17,000 |
| Sep 2, 2011 | Completed final sign-off Dec 2011 | 101 Post St | fire alarm system consisiting of 1 new power supply, 1 smoke control panel, 1 pull station, 20 smoke dtectors, 13 duct smoke detectors, 4 monitor modules, 1 control zam, 18 strobes, 21 horn strobesDetails
fire alarm system consisiting of 1 new power supply, 1 smoke control panel, 1 pull station, 20 smoke dtectors, 13 duct smoke detectors, 4 monitor modules, 1 control zam, 18 strobes, 21 horn strobes | $12,000 | |
| Jul 18, 2011 | Expired or cancelled cancelled Jun 2018 | 101 Post St | Plant Construction Company Lp | erect non electric sign, single faced, door/window sign.Details
erect non electric sign, single faced, door/window sign. | $100 |
| Jul 18, 2011 | Expired or cancelled cancelled Jun 2018 | 101 Post St | Plant Construction Company Lp | erect five non electric, single faced, door/window signs.Details
erect five non electric, single faced, door/window signs. | $200 |
| Jul 18, 2011 | Expired or cancelled cancelled Jun 2018 | 101 Post St | Plant Construction Company Lp | erect electric, single faced projecting sign.Details
erect electric, single faced projecting sign. | $5,000 |
| Jul 18, 2011 | Expired or cancelled cancelled Jun 2018 | 101 Post St | Plant Construction Company Lp | erect five non electric, double faced, projecting roof signs.Details
erect five non electric, double faced, projecting roof signs. | $500 |
| Jul 15, 2011 | Expired or cancelled cancelled Mar 2020 | 101 Post St | Plant Construction Company Lp | storefront to remain as is-alterations to canopy and new signs only.Details
storefront to remain as is-alterations to canopy and new signs only. | $10,000 |
| May 24, 2011 | Completed final sign-off Feb 2012 | 101 Post St | Plant Construction Company Lp | change of use in basement ground and mezzanine. interior tenant improvement. new basement kitchen, new small coffee bar at g/f. new steel stairs at each floor. new storefront enclosure at interior atrium at 2nd & 3rd floor. change in use at basement ground and mezzanine (m to b).Details
change of use in basement ground and mezzanine. interior tenant improvement. new basement kitchen, new small coffee bar at g/f. new steel stairs at each floor. new storefront enclosure at interior atrium at 2nd & 3rd floor. change in use at basement ground and mezzanine (m to b). | $3,500,000 |
| Apr 18, 2011 | Never finaled issued Apr 2011, no final | 101 Post St | street spaceDetails
street space | ||
| Apr 7, 2011 | Completed final sign-off Feb 2012 | 101 Post St | Plant Construction Co, Lp | interior non-structural demolition to include demo and removal of interior stairs and railings and restrooms in basement, 1st, 2nd, 3rd floors. work per ab-017. ref app 201101067977Details
interior non-structural demolition to include demo and removal of interior stairs and railings and restrooms in basement, 1st, 2nd, 3rd floors. work per ab-017. ref app 201101067977 | $50,000 |
| Mar 21, 2011 | Expired or cancelled cancelled Dec 2011 | 101 Post St | Arrow Sign Company | temporary window vinyl covering (non structural)Details
temporary window vinyl covering (non structural) | $4,000 |
| Jan 20, 2011 | Never finaled issued Jan 2011, no final | 101 Post St | street spaceDetails
street space | ||
| Jan 14, 2011 | Never finaled issued Jan 2011, no final | 101 Post St | street space permitDetails
street space permit | ||
| Jan 6, 2011 | Completed final sign-off Feb 2012 | 101 Post St | Plant Construction Co, Lp | removal of escalator on all floors, and filling in of concrete to restore original floor area. sprkler affected will be raisedDetails
removal of escalator on all floors, and filling in of concrete to restore original floor area. sprkler affected will be raised | $120,000 |
| Sep 8, 2009 | Never finaled issued Sep 2009, no final | 101 Post St | Fine Line Group Inc | interior demo. of (e) vacant retail. removal of non-structural partition walls, doors, millwork and art features. per ab 17.Details
interior demo. of (e) vacant retail. removal of non-structural partition walls, doors, millwork and art features. per ab 17. | $9,000 |
| Nov 19, 2003 | Expired or cancelled expired May 2006 | 101 Post St | Northern Sun Associates | revise to app #200211040732 delete slab infill and cantilever supports and delete special inspectionDetails
revise to app #200211040732 delete slab infill and cantilever supports and delete special inspection | |
| Apr 1, 2003 | Completed final sign-off Apr 2003 | 101 Post St | Brite Lite Neon Corp | to erect electrical signDetails
to erect electrical sign | |
| Feb 3, 2003 | Expired or cancelled expired Dec 2003 | 101 Post St | Decker Electric Co Inc Electrical Contra | provide 1 strobe at 2nd flr & 1 at 3rd flrDetails
provide 1 strobe at 2nd flr & 1 at 3rd flr | $1,500 |
| Jan 3, 2003 | Never finaled issued Jan 2003, no final | 101 Post St | street spaceDetails
street space | ||
| Nov 21, 2002 | Expired or cancelled expired Dec 2003 | 101 Post St | Northern Sun Associates | t-24 only, lighting & lt. controls to remain as isDetails
t-24 only, lighting & lt. controls to remain as is | |
| Nov 4, 2002 | Completed final sign-off Nov 2003 | 101 Post St | Northern Sun Associates | minor interior remodel, partition framing & drywall, 2 finishes, fire sprinklers,life safety,mechan.Details
minor interior remodel, partition framing & drywall, 2 finishes, fire sprinklers,life safety,mechan. | $150,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Golden Gate Sign Company Inc. (9), Plant Construction Company Lp (6), Bulley & Andrews Inc. (4), Bcci Construction Company (3), Johnson Controls Fire (3), Northern Sun Associates (3), Allied Fire Protection (2), Plant Construction Co, Lp (2), Acco Engineered Systems Inc. Dba Acco En, Airco Mechanical Inc, Arrow Sign Company, Bigham Taylor Roofing Co, Brite Lite Neon Corp, C B F Inc, Cisco Fire Sprinklers, Inc., Coast Sign Incorporated, Decker Electric Co Inc Electrical Contra, Fine Line Group Inc, Horizon Retail Construction Inc, Intelligent Technologies & Services Inc, R L H Fire Protection Inc, Superior Automatic Sprinkler, Western Allied Mechanical Inc.
- Architects
- James Stapleton, Patrick Bartlett
- Engineers
- Luis Perez, Mathew Debevec, Michael Shepherd, Robert Monaghan, Seth Sherman, Sherry Chaumpluke
- Designers
- R L H Fire Protection Inc