Mehrnoush Arsanjani
- Listed as
- architect
- Firm
- Polytech
- Based in
- Sf
- On San Francisco permits
- Nov 2004 to Oct 2024
32 permits since 2000 (architect on 32 permits): 28 completed, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2024 | Completed final sign-off Apr 2026 | 1580 Valencia St | Herrero Builders Incorporated | 6/fl-ti for (n) medical office spaceDetails
6/fl-ti for (n) medical office space | $1,400,000 |
| May 10, 2024 | Completed final sign-off Apr 2026 | 1580 Valencia St | Herrero Builders Incorporated | 3/f: interior t.i. construction of new medical office primary care clinic in existing 8-story monteagle medical office building. separate interior demo under permit 202310108295Details
3/f: interior t.i. construction of new medical office primary care clinic in existing 8-story monteagle medical office building. separate interior demo under permit 202310108295 | $1,400,000 |
| Aug 1, 2022 | Completed final sign-off Oct 2022 | 120 Kearny St | Plant Construction Co, Lp | (e)(3) offices-2/f: sound attenuation insulation above ceiling to mitigate sound intruction, replace (e) ceiling tiles, no change in occupancy/building footprint.Details
(e)(3) offices-2/f: sound attenuation insulation above ceiling to mitigate sound intruction, replace (e) ceiling tiles, no change in occupancy/building footprint. | $65,000 |
| Mar 4, 2022 | Completed final sign-off Sep 2024 | 350 California St | Plant Construction Co, Lp | rev to pa 201911217894, phase 3 minor storage condiiton for close out. 6th floor only.Details
rev to pa 201911217894, phase 3 minor storage condiiton for close out. 6th floor only. | |
| Mar 4, 2022 | Completed final sign-off Oct 2022 | 350 California St | Plant Construction Co, Lp | revised storage condition permit for phase 5 pa 202105130318. floors 7,8Details
revised storage condition permit for phase 5 pa 202105130318. floors 7,8 | |
| Mar 4, 2022 | Completed final sign-off Apr 2022 | 350 California St | Plant Construction Co, Lp | revision pa 202010166614 revise storage condition. 4th anf 5th flDetails
revision pa 202010166614 revise storage condition. 4th anf 5th fl | |
| May 13, 2021 | Completed final sign-off Oct 2022 | 350 California St | Plant Construction Co, Lp | voluntary seismic retrofit-phase 5; at 7th, 8th, & 16th floorDetails
voluntary seismic retrofit-phase 5; at 7th, 8th, & 16th floor | $1,500,000 |
| Apr 27, 2021 | Completed final sign-off Oct 2022 | 350 California St | Plant Construction Co, Lp | limited demolition for voluntary seismic retrofit. phase 5- 7th, 8th, and 16th floorsDetails
limited demolition for voluntary seismic retrofit. phase 5- 7th, 8th, and 16th floors | $1,500,000 |
| Oct 16, 2020 | Completed final sign-off Apr 2022 | 350 California St | Plant Construction Co, Lp | voluntary seismic retrofit-phase 4, 4th & 5th floorDetails
voluntary seismic retrofit-phase 4, 4th & 5th floor | $1,000,000 |
| Sep 30, 2020 | Never finaled issued Jul 2021, no final | 200 Sansome St | Rossi Builders Inc. | 12/f: upgrade accessible all gender toilets, selective new partitions, doors, casework, ceilings, light fixtures, mechanical diffuser. maher n/aDetails
12/f: upgrade accessible all gender toilets, selective new partitions, doors, casework, ceilings, light fixtures, mechanical diffuser. maher n/a | $198,218 |
| Nov 21, 2019 | Completed final sign-off Sep 2024 | 350 California St | Plant Construction Co, Lp | voluntary seismic retrofit phase 3 - 6th, 11th, 14th and 15th floorDetails
voluntary seismic retrofit phase 3 - 6th, 11th, 14th and 15th floor | $1,000,000 |
| May 7, 2019 | Completed final sign-off Sep 2020 | 350 California St | Plant Construction Co, Lp | voluntary seismic retrofit. phase 2- 9th, 10th and 12th floors. this project includes modification to the existing steel frame bldg. at 350 california st to volundary improve the structure for lateral forces in accordance ca.403.9 of sfbc.Details
voluntary seismic retrofit. phase 2- 9th, 10th and 12th floors. this project includes modification to the existing steel frame bldg. at 350 california st to volundary improve the structure for lateral forces in accordance ca.403.9 of sfbc. | $500,000 |
| Mar 7, 2019 | Completed final sign-off Jun 2020 | 350 California St | Plant Construction Co, Lp | 9th,10th,12th & 22nd flrs. non structural/structural demo of floors 9,10,12,22 (unoccupied) remove all finishes in prep for future voluntary seismic retrofit (under sep permit) no demo of restrooms or bld core maher naDetails
9th,10th,12th & 22nd flrs. non structural/structural demo of floors 9,10,12,22 (unoccupied) remove all finishes in prep for future voluntary seismic retrofit (under sep permit) no demo of restrooms or bld core maher na | $350,000 |
| Sep 6, 2018 | Completed final sign-off Sep 2020 | 350 California St | Plant Construction Co, Lp | architectural demolition of extg finishes(flooring, ceiling, etc) and non structural office partitions along the perimeters of floors 1-3 in preperation for seismic retrofit of floors 1-3 (phase 1)Details
architectural demolition of extg finishes(flooring, ceiling, etc) and non structural office partitions along the perimeters of floors 1-3 in preperation for seismic retrofit of floors 1-3 (phase 1) | $100,000 |
| Jun 15, 2018 | Completed final sign-off Oct 2020 | 350 California St | Plant Construction Co, Lp | modifications to the (e) steel frame building at 350 california st to voluntarily improve the structure for lateral forces in accordance with chatper 403.9 of the sfbc. maher naDetails
modifications to the (e) steel frame building at 350 california st to voluntarily improve the structure for lateral forces in accordance with chatper 403.9 of the sfbc. maher na | $9,000,000 |
| Jun 1, 2015 | Completed final sign-off Aug 2017 | 2480 Mission St | Jkl Construction Services Inc. | 2nd floor - combining three (e) office suite into one suite. interior non-structural t.i. removing (e) partitions, new partitions, removing sinks, add accessible sinks, expand waiting & reception areas & related mechanical, electrical, & plumbing & finishes.Details
2nd floor - combining three (e) office suite into one suite. interior non-structural t.i. removing (e) partitions, new partitions, removing sinks, add accessible sinks, expand waiting & reception areas & related mechanical, electrical, & plumbing & finishes. | $80,000 |
| Oct 31, 2012 | Never finaled issued Nov 2012, no final | 2200 Ofarrell St | Kaiser Foundation Health Plan Inc | consists of replacing in extg cr (card) reader and with new cr (card) reader.Details
consists of replacing in extg cr (card) reader and with new cr (card) reader. | $42,000 |
| Oct 31, 2012 | Never finaled issued Nov 2012, no final | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | revision to 2010 1202 5928. reduction of work to not build room 472. no demo to walls, verify existing l/sand sprinkler coverage. no change to existing.Details
revision to 2010 1202 5928. reduction of work to not build room 472. no demo to walls, verify existing l/sand sprinkler coverage. no change to existing. | |
| Jul 2, 2012 | Completed final sign-off Jul 2013 | 500 03rd St | Rossi Builders Inc. | 5th floor t.i. demolition of (e) non-structural partition & mezzanine area, construct of non-structural partition for area of work.Details
5th floor t.i. demolition of (e) non-structural partition & mezzanine area, construct of non-structural partition for area of work. | $50,000 |
| Jun 13, 2012 | Completed final sign-off Nov 2012 | 2350 Geary Bl | 1st floor ti for new telephone roomincludes selective demolition, (n) partitions, installation of (n) electric receptacles, (n) it equipment storage racks, 1 (n) 1 ton fan coil unit & 1 (n) smoke detector. fire alarm deferred - under separate permit.Details
1st floor ti for new telephone roomincludes selective demolition, (n) partitions, installation of (n) electric receptacles, (n) it equipment storage racks, 1 (n) 1 ton fan coil unit & 1 (n) smoke detector. fire alarm deferred - under separate permit. | $80,000 | |
| Dec 15, 2011 | Completed final sign-off Jun 2012 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | provide architecural and electrical upgrades to 1 tr room to support new it equipment.minimal infill work. the application of thermal control glazing film to the interior or 1 existing window and installation of new ups equipment, new electrical outlets and 1 new ground bus barsDetails
provide architecural and electrical upgrades to 1 tr room to support new it equipment.minimal infill work. the application of thermal control glazing film to the interior or 1 existing window and installation of new ups equipment, new electrical outlets and 1 new ground bus bars | $80,000 |
| Dec 15, 2011 | Completed final sign-off Nov 2012 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | provide electrical and mechanical upgrades to tr rooms to support new equipment. installation of new equipment racks, new hvac equipment, new electrical outlets and new ground bus bars and the conversion of 1 storage room into a telecommunications room, mechanical work only.Details
provide electrical and mechanical upgrades to tr rooms to support new equipment. installation of new equipment racks, new hvac equipment, new electrical outlets and new ground bus bars and the conversion of 1 storage room into a telecommunications room, mechanical work only. | $295,000 |
| Dec 15, 2011 | Completed final sign-off Mar 2013 | 450 06th Av | Kaiser Foundation Health Plan Inc | provide architecural and electrical upgrades to tr rooms to support new it equipment. includes installation of new equipment racks, new hvac equipment, new electrical outlets, new ground bus bars and interior thermal glazing film, mechanical work only.Details
provide architecural and electrical upgrades to tr rooms to support new it equipment. includes installation of new equipment racks, new hvac equipment, new electrical outlets, new ground bus bars and interior thermal glazing film, mechanical work only. | $325,000 |
| May 25, 2011 | Completed final sign-off Dec 2011 | 425 Market St | Kaiser Foundation Health Plan Inc | provide elect. finish upgrades to tr rm. to support (n) it equipment. this includes the installation of (n) elect. outlet, (n) ground buss bars (n) lighting, (n) equipment racks & the anchorage on one (e) uniterrupted power supply.Details
provide elect. finish upgrades to tr rm. to support (n) it equipment. this includes the installation of (n) elect. outlet, (n) ground buss bars (n) lighting, (n) equipment racks & the anchorage on one (e) uniterrupted power supply. | $65,000 |
| May 19, 2011 | Completed final sign-off Apr 2012 | 2238 Geary Bl | provide electrical & mechancial upgrade to tr rooms to support (n) it equipment. this includes the installation of (1) (n) ups, (n) battery back-up, (n) hvac equipment, (n) electrical outlets & (n) ground bus bars.Details
provide electrical & mechancial upgrade to tr rooms to support (n) it equipment. this includes the installation of (1) (n) ups, (n) battery back-up, (n) hvac equipment, (n) electrical outlets & (n) ground bus bars. | $475,000 | |
| Apr 19, 2011 | Completed final sign-off Jun 2012 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | replacing an (e) washer & disinfector to (e) medical office, same size, same equipment, cap mechanical duct.Details
replacing an (e) washer & disinfector to (e) medical office, same size, same equipment, cap mechanical duct. | $115,000 |
| Nov 4, 2009 | Completed final sign-off Jun 2010 | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | 3rd fl, prone room: installation of new equipment. replace unit in kind with minor modifications to electrical upgrades. no structural modification to the building. no fire dept inspections required. fire dept plan check/review only.Details
3rd fl, prone room: installation of new equipment. replace unit in kind with minor modifications to electrical upgrades. no structural modification to the building. no fire dept inspections required. fire dept plan check/review only. | $175,000 |
| Nov 4, 2009 | Completed final sign-off Jun 2010 | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | 3rd fl - mamography room: installation of new equipment. replace unit in kind with minor modifications to electrical upgrades. no structural modification to the building. no fire dept inspection required. fire dept plan check/review only.Details
3rd fl - mamography room: installation of new equipment. replace unit in kind with minor modifications to electrical upgrades. no structural modification to the building. no fire dept inspection required. fire dept plan check/review only. | $175,000 |
| Dec 29, 2005 | Completed final sign-off Oct 2006 | 38 Parker Av | replace kitchen cabinet, bathrm fixtures, fire mantle, light fixtures, path and finish, some dry wall and painting.Details
replace kitchen cabinet, bathrm fixtures, fire mantle, light fixtures, path and finish, some dry wall and painting. | $30,000 | |
| Dec 6, 2005 | Expired or cancelled expired May 2007 | 345 California St | Richlen Construction | oti-2, 14/f el, meDetails
oti-2, 14/f el, me | $240,000 |
| Jan 3, 2005 | Completed final sign-off Jul 2005 | 2238 Geary Bl | interior remodling revision to#200411229884. relocate fan/changes scope washer to two scope washer.Details
interior remodling revision to#200411229884. relocate fan/changes scope washer to two scope washer. | $1,000 | |
| Nov 22, 2004 | Completed final sign-off Jul 2005 | 2238 Geary Bl | interior improvement tothe scope was rm on 2nd fl relocate existing steris scope washers and scope *Details
interior improvement tothe scope was rm on 2nd fl relocate existing steris scope washers and scope * | $160,000 |