Block 1079, lot 025
2238 Geary Bl
94 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 21, 2026 | In progress | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | 1st floor:main lobby next to open stair area with relocated vending machine- wall finish treatment behind existing atm & existing parking payment machines, corridor 1w001 to receive acoustic wall finish treatment & seating casework in alcoves. 2nd fl: waitng area 2e00b to receive wall & ceiling | $300,000 |
| Sep 1, 2026 | In progress | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | revision to 202505237164 to support mammography partial upgrade to support the relocated ultrasound room (#3w472) patial upgrade will align w future nurse call upgrade for the entire department in future project. minor casework modification. | |
| Aug 13, 2026 | In progress | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | remodel existing radiology imaging room on the 3rd fl at 2238 geary. kaiser sf. architectural, structural, mechanical, plumbing, and electrical modification to provide imaging room. | $620,000 |
| Jun 30, 2026 | In progress | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | replace e) dock leveler in loading dock 1w121, w/ n) guardrails, replace e) intercom devices to n) video device, replece e) trash rm 1w131 door closer w/ a hold open function door closet, capping e) floor drain at lower platform of the trash rm 1w131, and apply non slippery epoxy coating | $50,000 |
| Apr 13, 2026 | In progress | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | replacement of mammogram equiptment and expansion to mamogram no 2 modification to existing mamogram room 2 small dressing rooms | $500,000 |
| Oct 6, 2025 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | relocate nitrogen starage tank & asscociated components from rm 4w265 4th/f, 02w262 5th/f, & 06e262 6th/f to rm 1w135 1st/f. patch, paint, repair flooring after removal of the nitrogen tanks. remodel rm 1w135 1st/f to install nitrogen tank & associated component | $50,000 |
| Sep 25, 2025 | In progress | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | remodel of (e) radiology & podiatry spaces on the 3rd flr @ 2238 geary bldg.kaiser sf. scope of work include architectural, strucral, mechnical,plumbing & electrical modifications to provide imaging rooms,exam rooms,offices,dressing rooms & a staff toilert. project to be completed in (4) separate... | $6,000,000 |
| Sep 10, 2025 | In progress | 2238 Geary Bl | Potter Fire Protection | 3/fl- relocate (5) and add (1) fire sprinklers. ref 202505237164 | $2,500 |
| Aug 27, 2025 | In progress | 2238 Geary Bl | Firemaster | installation of ansul r-102 ul300 6 gallon kitchen head fire supression system. revision to pa#: 202508143000 | $9,000 |
| Aug 14, 2025 | Completed | 2238 Geary Bl | Firemaster | installation of ansul r102 ul 300 kitchen hood fire suppression system | $9,000 |
| Jul 10, 2025 | Completed | 2238 Geary Bl | The Whiting-Turner Contracting Company | revision pa # 202112204707 & 202412197138. revise (e) fa system. remove all vesda references & devices for elevators 7 & 8. break, splice, connect, install and extend wiring as needed. verify (e) devices are in good condition. preform protest and submit documentation to ahs before final inspection. | $60,000 |
| Jun 27, 2025 | Completed | 2238 Geary Bl | The Whiting-Turner Contracting Company | to obtain final inspection for work approved under pa# 202108307389,202112204733,202305318946. all work is complete. | |
| May 23, 2025 | In progress | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | mammography equipment replacement and expansion, the adjacent e ulta sound room (3w472) relocated accross the hallway. this scope will take over part of the e digital imaging library 3w405 and provider offices (3w4881386), approx 320 sf. scope includes arch,struc,mech, elec,plumb modification. | $500,000 |
| Jan 10, 2025 | In progress | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | 2/f: revision to bpa# 202404119785, reduction of previous scope on 2/f. updated changes to rooms 2w284 and 2w282 only. removal of casework and upper cabinets, and ultarasonic washer in room 2w284. removal of casework and endoscope cabinet in room 2w282. new flooring in both rooms. | |
| Dec 19, 2024 | In progress | 2238 Geary Bl | Potter Fire Protection | demo (2) fire sprinklers in elevator pits | $1,750 |
| Nov 25, 2024 | In progress | 2238 Geary Bl | Herrero Builders Incorporated | replacement of existing chiller units located at b1 garage level chiller room medical office building. associated pumps and vfds will be replaced qas part of scope work, total of 3 new chillers. | $4,500,000 |
| Nov 25, 2024 | Completed | 2238 Geary Bl | Siemens Industry, Inc. | ref pa#202112204707: elevator modernization. fire alarm system. | $225,000 |
| Sep 13, 2024 | Completed | 2238 Geary Bl | Potter Fire Protection | relocate 1 and demo 2 fire sprinklers ref 202305087281 | $1,800 |
| Sep 13, 2024 | Completed | 2238 Geary Bl | Potter Fire Protection | relocate 15 and demo 3 fire sprinklers. ref 202302232494 | $7,800 |
| Jun 21, 2024 | In progress | 2238 Geary Bl | W. Bradley Electric | fire alarm system migration new equipment - 2 main cp, 3 remote control panels,1 graphic annunciator,1 firefighters smoke control panel, 3 remote power supplies, 1 management station,69 pull stations,461 modules,572 smoke detect,169 duct detect, 2 beam detect,38 strobes,606 speaker/strobes,8 speaker | $7,247,464 |
| Apr 11, 2024 | In progress | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | 2nd floor: remodel and install new scope washers, sinks and wall mounted computers. (no change to extg fire alarm or sprinklers). 7th floor: remove and infill extg door at utility room and install new mounted computers. | $50,000 |
| Feb 14, 2024 | Completed | 2238 Geary Bl | Potter Fire Protection | modify the (e) fire sprinklers system above the new electric vehicle charging station on level b1. ref pa# 2023-1207-2110. | $15,000 |
| Jan 18, 2024 | Completed | 2238 Geary Bl | Siemens Industry, Inc. | 1/f: fire only work for the pharmacy remodel on flr 1; additions are 4 smoke detectors and 3 speaker/strobes. ref pa# 202305087274. | $4,745 |
| Dec 21, 2023 | Completed | 2238 Geary Bl | Siemens Industry, Inc. | 3/f: fire only workfor the room 3w476 on flr 3; additions are 2 smoke detectors, 1 module, and 1 strobe. ref pa# 202208160597. | $2,665 |
| Dec 7, 2023 | Completed | 2238 Geary Bl | Booth Electric Inc | installing (2) level 3 fast charger in indoor parking garage. installing power feeds from existing switchgear in parking garage. | $50,000 |
| Nov 20, 2023 | In progress | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | refresh the existing men's and women's multi-stall public restrooms on the 1st flr. of the 2238 geary medical office bldg | $50,000 |
| Oct 27, 2023 | Completed | 2238 Geary Bl | Potter Fire Protection | relocate 2 fire sprinklers, ref pa# 202208160597. | $1,720 |
| Sep 1, 2023 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | revision to pa202305087274. 1st fl adult family medicine-urgent care. remove/demo 6 audible visual appliance. add 5 audible visual appliances, 13 visual appliances 1 dual sync module. | |
| Jul 25, 2023 | Completed | 2238 Geary Bl | The Whiting-Turner Contracting Company | revision ("addendum 4") to pa# 2021-0312-6502 (arch), revised smoke sampling system per state elevator inspector requirements - revision to pa# 2021-1220-4704 (fire alarm) on separate permit | $7,000 |
| May 31, 2023 | Completed | 2238 Geary Bl | The Whiting-Turner Contracting Company | revision to pa# 202103126502, 202108307889, 202112204733, n lighting along pathway from stair to elevator machine rm, relocate pit light on sheet e-201, add lighting in elevator machine rm to elevators 1-6, install n disconnect panel & n pullbox w/individual lockable disconnect, enclose cab lighting | $15,000 |
| May 8, 2023 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | room 3w264: replacement of mammogram equip/expansion; room 3w408: modification of accessories w/in the accessible patient toilet on 3/f; architectural/structural/mechanical/plumbing/electrical/finishes | $300,000 |
| May 8, 2023 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | 1st flor fire alarm phase 2. adult family medicine/urgent care | $50,000 |
| May 2, 2023 | Never finaled | 2238 Geary Bl | Potter Fire Protection | relocate 3 fire sprinklers. ref 202303284509 | $1,720 |
| Mar 28, 2023 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | 1st fl tenant improvement, adult family medicine, upgrade create exam rooms, reception area | $673,000 |
| Feb 23, 2023 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | 1st fl: remodel the existing outpatient pharmacy point of sales and waiting area. no added square footage to building. | $620,000 |
| Dec 19, 2022 | Completed | 2238 Geary Bl | Tristrux Llc Dba Tristrux Construction | removal of sprint decommissioned equipment. existing submeter to be removed. no hazardous materials involved. no new equipment proposed. | $15,000 |
| Aug 16, 2022 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | room 3w476 - removal of (e) mannography equipment, casework, portion of wall ceiling & installation of (n) hologic selenia mammography equipment, (n) casework, (n) accessible structural, elect, plumbing & mech work, patching/repair of (e) finishes on. | $305,000 |
| May 5, 2022 | Completed | 2238 Geary Bl | Siemens Industry, Inc. | floor 6: fire only work for the injection clinic remodel. 1 speaker / strobe is added and 1 smoke detector is relocated. ref pa# 202105100078. | $950 |
| Feb 16, 2022 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | install trash compactor & associated "rpu" power unit. | $30,000 |
| Dec 20, 2021 | Completed | 2238 Geary Bl | Siemens Industry, Inc. | provide (n) vesda assin lie-u of spot smoke detector in elevator #1-#8 hoist way. provide (n) duct smoke detector complete w/ ray base for shutting down ahu-2. provide (n) relay module for interface control. ref pa #202103126502, pa #202108307389 & pa #202112204733 | $60,000 |
| Dec 20, 2021 | Completed | 2238 Geary Bl | The Whiting-Turner Contracting Company | revision to pa#2021-0312-6502 and 2021-0830-7389. required redesign of ventilation requirement fr level b-5 elevator machine rm based on a revision of heat loads from elevator manufacturer (fc-1 and cu-1). add'l constructability comments from gc related to bedesign. added access control sheets to | $45,000 |
| Dec 1, 2021 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | 8/f: installation of partial height modular partitions by dirtt in an (e) medical office building. | $32,000 |
| Nov 18, 2021 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | to comply with nov#202182972. replace garage door like for like | $45,000 |
| Oct 13, 2021 | Completed | 2238 Geary Bl | Potter Fire Protection | demo (e) sprinkler within elevator. shaft and elevator equipment room. elevators 1-6. | $5,000 |
| Aug 30, 2021 | Completed | 2238 Geary Bl | The Whiting-Turner Contracting Company | revision to app#202103126502. new fan coil unit and condensing unit for cooling purposes per elevator modernization proposal. | |
| Aug 27, 2021 | Completed | 2238 Geary Bl | Potter Fire Protection | add 1 sprinkler. ref 2021 0510 0078 | $1,600 |
| May 10, 2021 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | 6th fl: remodel the southwest lobby of 6th fl to an injection/blood draw clinic. | $479,000 |
| Mar 12, 2021 | Completed | 2238 Geary Bl | The Whiting-Turner Contracting Company | modernization of 2 existing hydraulic elevators and 6 traction elevators new air handling units to service elevator machine room and sprinklers to be removed top of hoistways to comply with cbc 2019. | $300,000 |
| Nov 17, 2020 | Never finaled | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | room 3w162 - removal of (e) sonogram image eqt - installation of new hologic selenia mamography eqt - casework - sink | $194,780 |
| Oct 2, 2020 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | project replaces medical equip, with new model paint room, new flooring, new casework and sink to replace similar, replace 2 ceiling diffusers project is one room at 185 sqft | $60,000 |
| Sep 14, 2020 | Expired or cancelled | 2238 Geary Bl | proposed mod to e tmobile unmanned telecom facility to include removeing 1 e antenna and installing 3 n air 32 db, 3 n 8' octo, 3 n air 6449 antennas install 3 n 4415 and 3 n 4449 radios install 2 new electrical cabinets, electrical upgrade to 200 amp | $25,000 | |
| Sep 3, 2020 | Never finaled | 2238 Geary Bl | Potter Fire Protection | relocate (5), add (1) and replace (3) fire sprinklers, ref pa# 201908128583 | $5,000 |
| Aug 13, 2020 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | floors 2-8: toilet room refresh & accessibility upgrades. remodel and upgrade for accessibility existing men's & women's public toilet rooms on floors 2-8. | $1,000,000 |
| May 6, 2020 | Completed | 2238 Geary Bl | Siemens Industry, Inc. | fire alarm additions of (2) relay modules(mounted on fllor 3) to release security door locks on floors 2 through 8. bldg app#2019 1210 9171 | $1,100 |
| Feb 24, 2020 | Expired or cancelled | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | 4/f: rev to pa#201908057836: partial height drywall partition added to reduce the span of a rprefabricated storefront wall. | |
| Feb 4, 2020 | Completed | 2238 Geary Bl | Siemens Industry, Inc. | 8th fl - fire alarm work for the "oncology pharmacy" remodel. additions are 1 duct detector, 1 module, 2 speaker/strobes and 2 strobes. ref pa 2019-0812-8583 | $4,450 |
| Dec 10, 2019 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | remove 28 extg doors and install 28 new doors with card readers at same location. doors are located from 2nd through 8th floor. the scope includes architectural, electrical, & security only. | $400,000 |
| Oct 21, 2019 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | installation hub parking pay machine | $50,000 |
| Aug 12, 2019 | Completed | 2238 Geary Bl | upgrade and remodel extg onclogy compounding pharmacy on 8th floor. | $1,889,739 | |
| Aug 5, 2019 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | 4th fl ti- walls, millwork, finishes fire/life safety/mech under sep permit | $100,000 |
| Jul 2, 2019 | Completed | 2238 Geary Bl | Potter Fire Protection | ref pa 201901150462; relocate (3) pendant sprinklers | $1,850 |
| Jan 15, 2019 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | room remodel due to replacement of mammography equipment in e mammo room kaiser medical offices sf | $266,906 |
| Nov 7, 2018 | Expired or cancelled | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | replacement of existing boiler on the penthouse roof of the medical office building. | $50,000 |
| Jun 27, 2018 | Completed | 2238 Geary Bl | replacement of (e) bone densitometer with new bone densitometer. relocate toilet partitio door for accessible path of travel upgrade | $103,225 | |
| Mar 27, 2018 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | 3rd flr ti- 90 minutes roll over frill at reception, millwork, finishes, mep under sep permit | $50,000 |
| Feb 26, 2018 | Expired or cancelled | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | 7th flr-revision #201712085937 - new steel support structure above ceilinh. remove "disconnect and remove (e) procedure light, 192va, 12ov. safe off circuit in j-box. provide continued operation of circuit" from scope of work. new amico mira-led fixture | |
| Dec 8, 2017 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | floors 2,3,5,6,7 & 8 replace existing procedure light fixtures with new procedure light fixtures | $110,000 |
| Nov 7, 2017 | Completed | 2238 Geary Bl | Siemens Industry, Inc. | fire alarm programming work to delete existing system mode at the kaiser mob at 2200 ofarrell st. building is being demolished. no new devices, program revision only | $1,500 |
| May 17, 2017 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | 1st fl pharmacy. add layer of security mesh & gyp.bp to existing perimeter walls where existing mesh does not occur. add security steel grill to windows. replace existing pharmacy perimeter doors&frames w/new metal doors&welded framed. 6th fl pharmacy-replace existing perimeter doors & frames w/new | $117,338 |
| Feb 2, 2017 | Completed | 2238 Geary Bl | Siemens Industry, Inc. | fire alarm work for the "nurse station" remodel on floor 8; additions are 6 speaker/strobes and the relocation of 2 speaker/strobes. ref pa 2016-1014-0375 | $4,080 |
| Jan 24, 2017 | Never finaled | 2238 Geary Bl | Siemens Industry, Inc. | fire alarm permit #2 for the "kaiser sfo relocation" remodel on floor 4; this work is to indicate the relocated devices, proposed under pa 2016-0914-7622, due to the movement of the workstations area (no new devices). ref pa 2016-0104-6275 | |
| Oct 14, 2016 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | remodel (e) nurse's station, medical assistant station, storage & partial infusion area in the oncology department on the northeast wing of the 8th floor. alarm/sprinklers deferred. | $310,000 |
| Oct 7, 2016 | Completed | 2238 Geary Bl | Siemens Industry, Inc. | 6th floor: fire alarm: add 2 speaker/strobes and the relocation of 2 smoke detectors ref 201601046275 | $1,630 |
| Oct 5, 2016 | Completed | 2238 Geary Bl | Siemens Industry, Inc. | fire alarm work for the "kaiser sfo relocation" remodel on floor 5addition of 6 speaker/strobes, 5 strobes and the relocation of 3 smoke detectors and 2 speaker/strobes permit # 201601046275 | $7,035 |
| Sep 28, 2016 | Completed | 2238 Geary Bl | Siemens Industry, Inc. | 8th floor: fire alarm for the "sfo relocation" - add 6 speaker/strobes, 18 strobes, as well as the relocation of 4 smoke detectors and 2 speaker/strobes. reference 2016.0104.6275. | $14,040 |
| Sep 14, 2016 | Never finaled | 2238 Geary Bl | Siemens Industry, Inc. | 4th floor: fore alarm - 3 speaker/strobe, and 4 smoke detectors- relocated ref pa 201601046275 | $2,750 |
| Jul 11, 2016 | Never finaled | 2238 Geary Bl | Potter Fire Protection | 4,5,8th floors: relocate 12, add 3 and plug 4 fire sprinklers. ref pa 2016 0104 6275. 6th floor ti did not require sprinkler work | $8,000 |
| Jan 4, 2016 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | misc renovations to 4th, 5th, 6th, & 8th floors. interior non structural walls, glazing, ceiling, and finishes. | $1,200,000 |
| Dec 16, 2015 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | modification of interior walls, doors, glazing and finishes and modification of mep | $200,000 |
| Apr 30, 2015 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | revision to 201504022600: removal of notes by sffd for adding a smoke detector shutdown for the supply fans sf-7 and sf-10. | |
| Apr 2, 2015 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | remove existing roof mounted stair # 1 & 2 pressurization fans and purge fans for 2 stairwell vestibules and replace with new fans. upsize motors for stairwell supply fans for 2 stairwells located in 1st fl ceiling space | $166,533 |
| Dec 11, 2014 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | remodel lobby level extg accessible restrooms. | $195,000 |
| Jul 22, 2013 | Completed | 2238 Geary Bl | Ad Art Inc. | 1 structural attachment detail for sign permit per app#201209240433(revision) | |
| Jul 22, 2013 | Completed | 2238 Geary Bl | Ad Art Inc. | revision to app#201209240429. structural attachement detail revision for sign permit. | |
| Apr 3, 2013 | Completed | 2238 Geary Bl | revision to app#201212216720. remove sink from 3w474 and placed it in the work room 3w486. | ||
| Dec 21, 2012 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | revision to 201012025928: installation of new equipment in e mammography room. relocate equipment from ultra sound room to mammography. removal of equipment in film processing room and darkroom | |
| Oct 31, 2012 | Never finaled | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | revision to 2010 1202 5928. reduction of work to not build room 472. no demo to walls, verify existing l/sand sprinkler coverage. no change to existing. | |
| Sep 24, 2012 | Never finaled | 2238 Geary Bl | Ad Art Inc. | to erect a projecting electrical sign. | $5,000 |
| Sep 24, 2012 | Never finaled | 2238 Geary Bl | Ad Art Inc. | to erect a projecting electrical sign. | $5,000 |
| Dec 20, 2011 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | install 2 new smoke detectors in 1st & 8th floors tr. | $2,500 |
| May 19, 2011 | Completed | 2238 Geary Bl | provide electrical & mechancial upgrade to tr rooms to support (n) it equipment. this includes the installation of (1) (n) ups, (n) battery back-up, (n) hvac equipment, (n) electrical outlets & (n) ground bus bars. | $475,000 | |
| Dec 2, 2010 | Never finaled | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | installation of new equipment in an existing mamogram room; relocation of equipment from ultrasound room to mamogram room & removal of equipment from film processing room and dark room - minor architectural, mechanical and electrical - no structural modifications-only anchoring new equipment | $175,000 |
| Sep 21, 2010 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | remodeling the area adjacent to the extg obgyn reception counter on the 7th floor. add new electrical and data outlets. add new partial height aluminum and glass store front partitions to enclosed the office area. | $75,000 |
| Sep 21, 2010 | Completed | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | 5th & 7th floors-replace (e) & add new adjustable height work surfaces for medical assistants. add new electrical & data outlets. add new partial height aluminum & glass storefront (interior) partitions as space dividers | $300,000 |