William Chin
- License
- C32475
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Aug 2022 to Jun 2026
2 permits since 2000 (architect on 2 permits): 1 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Kaiser Foundation Health Plan Inc (2)
- Engineers
- Warren R. Pottebaum
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 30, 2026 | In progress issued Jul 2026 | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | replace e) dock leveler in loading dock 1w121, w/ n) guardrails, replace e) intercom devices to n) video device, replece e) trash rm 1w131 door closer w/ a hold open function door closet, capping e) floor drain at lower platform of the trash rm 1w131, and apply non slippery epoxy coatingDetails
replace e) dock leveler in loading dock 1w121, w/ n) guardrails, replace e) intercom devices to n) video device, replece e) trash rm 1w131 door closer w/ a hold open function door closet, capping e) floor drain at lower platform of the trash rm 1w131, and apply non slippery epoxy coating | $50,000 |
| Aug 16, 2022 | Completed final sign-off May 2024 | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | room 3w476 - removal of (e) mannography equipment, casework, portion of wall ceiling & installation of (n) hologic selenia mammography equipment, (n) casework, (n) accessible structural, elect, plumbing & mech work, patching/repair of (e) finishes on.Details
room 3w476 - removal of (e) mannography equipment, casework, portion of wall ceiling & installation of (n) hologic selenia mammography equipment, (n) casework, (n) accessible structural, elect, plumbing & mech work, patching/repair of (e) finishes on. | $305,000 |