Gordon Pak Kei Wong
- License
- E18416
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E18416 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Mar 2021 to Jul 2026
7 permits since 2000 (engineer on 7 permits): 4 completed, 2 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Amone Corp, Dfi Construction Company, Ibuild Construction & Renovations Inc, Jkl Construction Services Inc., Kaiser Foundation Health Plan Inc, Ward-Tek Inc.
- Architects
- Hugh Cotter (3), June Grant
- Engineers
- Harold A Hougham (3), Abraham Lynn, Alyssa Jacobson, Carrie Leung, Joe Igber, John Chou, Matthew Johnson, Ronald Blue, Thomas Wismar, Timothy M. Lindsey
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Sep 2026 | 601 Duboce Av | Jkl Construction Services Inc. | voluntary barrier removal campus improvement, roadway resurfacing, site regrading and signage modiifcations, providing ada compliant access between the medical bldgs and parking garage. reloate/ reinstall an (e) pay station with an install of new canopy outside of the parking garage, minor modificatDetails
voluntary barrier removal campus improvement, roadway resurfacing, site regrading and signage modiifcations, providing ada compliant access between the medical bldgs and parking garage. reloate/ reinstall an (e) pay station with an install of new canopy outside of the parking garage, minor modificat | $80,000 |
| Dec 30, 2025 | In progress issued Mar 2026 | 746 Natoma St | Ward-Tek Inc. | 746-746a natoma st: in-kind repairs to warehouse due to fire, with ada upgrades. to comply with nov#202540188.Details
746-746a natoma st: in-kind repairs to warehouse due to fire, with ada upgrades. to comply with nov#202540188. | $350,000 |
| Mar 14, 2025 | Completed final sign-off May 2026 | 157 West Portal Av | Ibuild Construction & Renovations Inc | fire repairs to first and 2nd levels, in-kind.Details
fire repairs to first and 2nd levels, in-kind. | $491,000 |
| Oct 12, 2023 | Never finaled filed Oct 2023, never issued | 45 Castro St | selective demo in suites 220,212, and 207 to accomdate the proposed tenant improvements. converting (e) consult room and (e) offices in suite 220 to 3 exam rooms, 1 exam/treatment room. remodel (e) suite 212 to 5 neuropsych offices, and admin. modify (e) hvac, plumbing, and electrial systems.Details
selective demo in suites 220,212, and 207 to accomdate the proposed tenant improvements. converting (e) consult room and (e) offices in suite 220 to 3 exam rooms, 1 exam/treatment room. remodel (e) suite 212 to 5 neuropsych offices, and admin. modify (e) hvac, plumbing, and electrial systems. | $900,000 | |
| May 8, 2023 | Completed final sign-off May 2025 | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | room 3w264: replacement of mammogram equip/expansion; room 3w408: modification of accessories w/in the accessible patient toilet on 3/f; architectural/structural/mechanical/plumbing/electrical/finishesDetails
room 3w264: replacement of mammogram equip/expansion; room 3w408: modification of accessories w/in the accessible patient toilet on 3/f; architectural/structural/mechanical/plumbing/electrical/finishes | $300,000 |
| Sep 30, 2022 | Completed final sign-off Feb 2025 | 2820 16th St | Amone Corp | new t.i. build out offices in existing warm shell space. work includes new offices, open meeting rooms and kitchenete area. existing space has approved ada restrooms and hvac.Details
new t.i. build out offices in existing warm shell space. work includes new offices, open meeting rooms and kitchenete area. existing space has approved ada restrooms and hvac. | $264,600 |
| Mar 10, 2021 | Completed final sign-off Aug 2022 | 185 Berry St | Dfi Construction Company | suite 290: remodel of (e) storage space to install new liquid nitrogen freezer storage and supply tanks. new floor finishes, painting. modifications to mep seismic anchorage for new equipment. ok to remove sffd from this permit. ucsf - not under sffd jurisdiction. retain all fees for work done - jlDetails
suite 290: remodel of (e) storage space to install new liquid nitrogen freezer storage and supply tanks. new floor finishes, painting. modifications to mep seismic anchorage for new equipment. ok to remove sffd from this permit. ucsf - not under sffd jurisdiction. retain all fees for work done - jl | $50,000 |