John Bachoua
- Listed as
- architect, engineer
- Firm
- Nazarene Engineering
- Based in
- El Cajon
- On San Francisco permits
- Dec 2019 to Jul 2025
12 permits since 2000 (engineer on 11 permits, architect on 1 permit): 9 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 16, 2025 | In progress issued Jul 2025 | 718 Long Bridge St | Rogers Electric | install 31 ev charging station in and around parking garage. assigned owner, not avaiable to general public.Details
install 31 ev charging station in and around parking garage. assigned owner, not avaiable to general public. | $50,000 |
| Sep 17, 2024 | Completed final sign-off Feb 2025 | 4131 Geary Bl | Booth Electric Inc | revision to pa#: 202312062020. change of electrical feed and panel location.Details
revision to pa#: 202312062020. change of electrical feed and panel location. | $5,000 |
| Dec 28, 2023 | In progress issued Dec 2023 | 2190 Ofarrell St | Booth Electric Inc | installing 4 level 3 fast chargers, dual stall delivery in indoor parking garage, installing power feeds from existing switchgear in parking garage.Details
installing 4 level 3 fast chargers, dual stall delivery in indoor parking garage, installing power feeds from existing switchgear in parking garage. | $100,000 |
| Dec 7, 2023 | Completed final sign-off Feb 2025 | 2238 Geary Bl | Booth Electric Inc | installing (2) level 3 fast charger in indoor parking garage. installing power feeds from existing switchgear in parking garage.Details
installing (2) level 3 fast charger in indoor parking garage. installing power feeds from existing switchgear in parking garage. | $50,000 |
| Dec 6, 2023 | Completed final sign-off Feb 2025 | 4131 Geary Bl | Booth Electric Inc | parking area - installing (4) level 2 ev chargers and (1) level 3 fast charger in outdoor parking lot. installing power feeds from (e) switchgear in the basement under outdoor, uncovered parking area.Details
parking area - installing (4) level 2 ev chargers and (1) level 3 fast charger in outdoor parking lot. installing power feeds from (e) switchgear in the basement under outdoor, uncovered parking area. | $100,000 |
| Nov 7, 2023 | In progress filed Nov 2023, not yet issued | 50 Quint St | this project consists of (20) ev charging stations with dual stall delivery serving (40) parking stalls within (e) commercial parking lot that will be restriped.Details
this project consists of (20) ev charging stations with dual stall delivery serving (40) parking stalls within (e) commercial parking lot that will be restriped. | $400,000 | |
| Apr 6, 2021 | Completed final sign-off Dec 2021 | 1185 Market St | Cupertino Electric Inc. | install 800a switchboard to feed (1) all-in-one 50kw ev charger & (4) all-in-one 100kw ev chargers. install associated conduit & conductors. (5) total evcs being installed as part of approved (12) future ev chargers approved for whole foods market renovation under pa# 202007200503.Details
install 800a switchboard to feed (1) all-in-one 50kw ev charger & (4) all-in-one 100kw ev chargers. install associated conduit & conductors. (5) total evcs being installed as part of approved (12) future ev chargers approved for whole foods market renovation under pa# 202007200503. | $350,000 |
| Feb 16, 2021 | Completed final sign-off Mar 2022 | 735 07th Av | Cupertino Electric Inc. | revision to app#202011048170 to the ada portion only. install 400 a meter main at extg parking lot. install 4 50kw ev chargers. install utility transformer pad and conduit. install associated conduit and conductors. install ev ada van stall & ramp.Details
revision to app#202011048170 to the ada portion only. install 400 a meter main at extg parking lot. install 4 50kw ev chargers. install utility transformer pad and conduit. install associated conduit and conductors. install ev ada van stall & ramp. | $117,900 |
| Jul 23, 2020 | Completed final sign-off Dec 2020 | 1750 Fulton St | Campbell Family Electric Inc | install (2) ev chargers in existing parking structureDetails
install (2) ev chargers in existing parking structure | $162,000 |
| Mar 5, 2020 | Completed final sign-off Aug 2020 | 1000 Van Ness Av | Campbell Family Electric Inc | install (9) level 3 evs e chargers and (1) level 2 charger & require electrical equipment.Details
install (9) level 3 evs e chargers and (1) level 2 charger & require electrical equipment. | $150,000 |
| Mar 5, 2020 | Completed final sign-off Jul 2020 | 1150 Ocean Av | Campbell Family Electric Inc | replace (2) level 2 ev chargers w/(2) level (3) ev chargers.Details
replace (2) level 2 ev chargers w/(2) level (3) ev chargers. | $20,000 |
| Dec 17, 2019 | Completed final sign-off Jun 2020 | 1160 Mission St | Campbell Family Electric Inc | install (2) l3 vehicle charging stationsDetails
install (2) l3 vehicle charging stations | $48,000 |