Permit GraphShortlistSan Francisco building permits since 2000

Mehrangiz Ansari

License
3650
Board not determined from the city's record: no role or letter places this number
About the state's license search
Search the state's license records (not the contractors board)
Listed as
architect, engineer
Firm
Bureau Of Architecture
On San Francisco permits
May 2011 to Jan 2021

6 permits since 2000 (engineer on 5 permits, architect on 1 permit): 6 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
K C K Builders Inc (3), Agbayani Construction Corp.
Architects
Ann Jurgens, Marc Dana Merker, Mehrnoush Arsanjani
Engineers
Robert K Tjoe;E, Yip Shing Donny Lee

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jan 21, 2021Completed
final sign-off Apr 2022
221 04th StAgbayani Construction Corp.revision to pa# 201902193223. inspector requireded scope of work to include connection detail of handrail at middle support at stair "g" in zone 3.
Details
Permit
202101212966
Permit issued
Feb 9, 2021
Final sign-off
Apr 13, 2022

revision to pa# 201902193223. inspector requireded scope of work to include connection detail of handrail at middle support at stair "g" in zone 3.

Open the permit page

$10,000
May 21, 2014Completed
final sign-off Aug 2015
1001 Potrero Avrevision to pa# 201211134067 structural opening detail changed. n/a ordinance #155-13
Details
Permit
201405216390
Permit issued
Jun 4, 2014
Final sign-off
Aug 11, 2015

revision to pa# 201211134067 structural opening detail changed. n/a ordinance #155-13

Open the permit page

Oct 19, 2011Completed
final sign-off Apr 2013
5075 03rd StK C K Builders Inccity job - revision to pa# 2009-0911-6627, 2011-0908-4123, 2011-0922-5234-lower mat slab between gridlines a & b, 3 & 5 by 30" for a joint utilities trench.
Details
Permit
201110197149
Permit issued
Nov 4, 2011
Final sign-off
Apr 26, 2013

city job - revision to pa# 2009-0911-6627, 2011-0908-4123, 2011-0922-5234-lower mat slab between gridlines a & b, 3 & 5 by 30" for a joint utilities trench.

Open the permit page

$30,000
Sep 8, 2011Completed
final sign-off Apr 2013
5075 03rd StK C K Builders Increvision to appl #200909776627: modify small portion of one wall foundation (north west corner) per encounterted basement existing conditions of adjcent bldg.
Details
Permit
201109084123
Permit issued
Sep 22, 2011
Final sign-off
Apr 26, 2013

revision to appl #200909776627: modify small portion of one wall foundation (north west corner) per encounterted basement existing conditions of adjcent bldg.

Open the permit page

$25,000
Jun 16, 2011Completed
final sign-off Apr 2013
5075 03rd StK C K Builders Increvision to pa# 2009.09.11.6627. reduce scope of work. remove proposed basement cistain and relocate fire system back flow preventer from basement to ground floor community room
Details
Permit
201106168252
Permit issued
Jun 16, 2011
Final sign-off
Apr 26, 2013

revision to pa# 2009.09.11.6627. reduce scope of work. remove proposed basement cistain and relocate fire system back flow preventer from basement to ground floor community room

Open the permit page

May 19, 2011Completed
final sign-off Apr 2012
2238 Geary Blprovide electrical & mechancial upgrade to tr rooms to support (n) it equipment. this includes the installation of (1) (n) ups, (n) battery back-up, (n) hvac equipment, (n) electrical outlets & (n) ground bus bars.
Details
Permit
201105196376
Permit issued
Jun 16, 2011
Final sign-off
Apr 9, 2012

provide electrical & mechancial upgrade to tr rooms to support (n) it equipment. this includes the installation of (1) (n) ups, (n) battery back-up, (n) hvac equipment, (n) electrical outlets & (n) ground bus bars.

Open the permit page

$475,000