Agbayani Construction Corp.
- Based in
- Daly City
- On San Francisco permits
- Jul 2001 to Jan 2021
- Last 24 months
- 0 permits filed
13 permits since 2000: 8 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 21, 2021 | Completed final sign-off Apr 2022 | 221 04th St | revision to pa# 201902193223. inspector requireded scope of work to include connection detail of handrail at middle support at stair "g" in zone 3.Details
revision to pa# 201902193223. inspector requireded scope of work to include connection detail of handrail at middle support at stair "g" in zone 3. | $10,000 |
| Feb 19, 2019 | Completed final sign-off Feb 2022 | 790 Folsom St | perform selective building envelope and waterproofing repairs on the e lobby/stair f roof, replace e gutters and downspouts on e sloped metal reoof and selective cladding and waterproofing repairs on the e north playyard exterior wall and north play yard levelDetails
perform selective building envelope and waterproofing repairs on the e lobby/stair f roof, replace e gutters and downspouts on e sloped metal reoof and selective cladding and waterproofing repairs on the e north playyard exterior wall and north play yard level | $625,000 |
| Feb 19, 2019 | Completed final sign-off Feb 2022 | 221 04th St | perform selective building envelope repairs on the museum, including expansion joint repairs, partial reroof and roof repairs, waterproofing and cladding repairsDetails
perform selective building envelope repairs on the museum, including expansion joint repairs, partial reroof and roof repairs, waterproofing and cladding repairs | $2,000,000 |
| Oct 20, 2010 | Completed final sign-off Aug 2011 | 622 Peralta Av | remove & replace existing kitchen cabinets and counter top, remove and replace bathroom tiles, 2 kitchen remodels, non structuralDetails
remove & replace existing kitchen cabinets and counter top, remove and replace bathroom tiles, 2 kitchen remodels, non structural | $25,000 |
| Aug 28, 2009 | Completed final sign-off Sep 2009 | 82 Rossi Av | to obtain final inspection for work approved under pa#200508241120.Details
to obtain final inspection for work approved under pa#200508241120. | |
| May 6, 2009 | Completed final sign-off Jun 2009 | 840 Broderick St | dry rot repair. exterior siding. area measures approx 16' x 20'. replace (e) t-111 6" o.c. with like kind / in kind materials. all proposed work is not visable from the public way. no structural.Details
dry rot repair. exterior siding. area measures approx 16' x 20'. replace (e) t-111 6" o.c. with like kind / in kind materials. all proposed work is not visable from the public way. no structural. | $9,500 |
| Apr 3, 2007 | Completed final sign-off Jun 2007 | 2225 21st Av | 1)removal of extg kchn cbnts and replace by new cabinets. 2) remove of kchn gypsum and ceiling to accommodate new electrical fixtures. 3) replacement of all exterior wndw to vinyl wndw. 23 wndws- 5 at front of propertyDetails
1)removal of extg kchn cbnts and replace by new cabinets. 2) remove of kchn gypsum and ceiling to accommodate new electrical fixtures. 3) replacement of all exterior wndw to vinyl wndw. 23 wndws- 5 at front of property | $15,000 |
| Aug 24, 2005 | Expired or cancelled expired Jul 2008 | 82 Rossi Av | demo kitchen cabs & sheetrock ; install some electrical upgrades; demo & install new plumbing upgradDetails
demo kitchen cabs & sheetrock ; install some electrical upgrades; demo & install new plumbing upgrad | $20,000 |
| Mar 5, 2004 | Never finaled issued Mar 2004, no final | 272 Thrift St | repair roof, replace windows, facing back, repair siding, repair drainage at ext, repair rear ext stDetails
repair roof, replace windows, facing back, repair siding, repair drainage at ext, repair rear ext st | $9,000 |
| Apr 10, 2003 | Completed final sign-off Jun 2003 | 1279 41st Av | repair of 2 decks at back of propertyDetails
repair of 2 decks at back of property | $10,000 |
| Dec 13, 2002 | Expired or cancelled expired Jan 2007 | 751 Page St | dry rot deck repair in back of bldg(repl to 1st less than 50% of the deck structure w/o drawings)Details
dry rot deck repair in back of bldg(repl to 1st less than 50% of the deck structure w/o drawings) | $2,100 |
| Nov 14, 2002 | Expired or cancelled cancelled Dec 2002 | 571 Page St | dry rot repair in back yark less than 50%Details
dry rot repair in back yark less than 50% | $2,100 |
| Jul 18, 2001 | Expired or cancelled withdrawn Oct 2001 | 1895 41st Av | horizontal addition, build down stairs, two room, take out shower & stove, demo 2 by 3 windows, instDetails
horizontal addition, build down stairs, two room, take out shower & stove, demo 2 by 3 windows, inst | $15,000 |