Agbayani Construction Corp.
- Based in
- Daly City
- On San Francisco permits
- Jul 2001 to Jan 2021
- Last 24 months
- 0 permits filed
13 permits since 2000: 8 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 53 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 10, 2003 | Completed final sign-off Jun 2003 | 1279 41st Av | repair of 2 decks at back of propertyDetails
repair of 2 decks at back of property | $10,000 |
| Dec 13, 2002 | Expired or cancelled expired Jan 2007 | 751 Page St | dry rot deck repair in back of bldg(repl to 1st less than 50% of the deck structure w/o drawings)Details
dry rot deck repair in back of bldg(repl to 1st less than 50% of the deck structure w/o drawings) | $2,100 |