K C K Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2005 to Sep 2018
- Last 24 months
- 0 permits filed
29 permits since 2000: 24 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 20, 2018 | Completed final sign-off Sep 2018 | 55 Cashmere St | renew for final 201506017619 and 201506017632Details
renew for final 201506017619 and 201506017632 | |
| Sep 20, 2018 | Never finaled issued Sep 2018, no final | 10 Cashmere St | renew for final 201506013545. all work is completeDetails
renew for final 201506013545. all work is complete | |
| Aug 30, 2018 | Completed final sign-off Nov 2018 | 72 Dedman Ct | inkind repair/replace of existing window, door and siding (approx. 75 sf) due to auto accident damageDetails
inkind repair/replace of existing window, door and siding (approx. 75 sf) due to auto accident damage | $37,000 |
| Feb 10, 2017 | Never finaled issued Mar 2017, no final | 2323 Cesar Chavez St | r&r (e) dust collection equip in carpenters shop maher na. sprinkler work on deferred submittal.Details
r&r (e) dust collection equip in carpenters shop maher na. sprinkler work on deferred submittal. | $150,000 |
| Mar 24, 2016 | Completed final sign-off May 2016 | 611 Keith St | repair damage from auto fire. replace windows, center support, clean & paint.Details
repair damage from auto fire. replace windows, center support, clean & paint. | $25,000 |
| Nov 10, 2015 | Completed final sign-off Sep 2018 | 603 Keith St | bldg 13. seismic retrofit soft story mandatory ordinance chapter 34b. 2012 iebc appendix a-4. ** maher: n/a **Details
bldg 13. seismic retrofit soft story mandatory ordinance chapter 34b. 2012 iebc appendix a-4. ** maher: n/a ** | $60,000 |
| Nov 4, 2015 | Completed final sign-off Sep 2016 | 65 Reuel Ct | revision to 2015-0601-7631(r2) soft story - changes to s2.1 and details 14 &15/s8.1. (e) stucco shearwalls are shown in-lieu of (n) plywood shearwalls.Details
revision to 2015-0601-7631(r2) soft story - changes to s2.1 and details 14 &15/s8.1. (e) stucco shearwalls are shown in-lieu of (n) plywood shearwalls. | |
| Oct 21, 2015 | Completed final sign-off Sep 2016 | 65 Reuel Ct | revision to 201506017631 r2. changes to foundation detailsDetails
revision to 201506017631 r2. changes to foundation details | $3,300 |
| Jul 13, 2015 | Completed final sign-off Sep 2018 | 10 Cashmere St | trash enclosure for the site 8 total.Details
trash enclosure for the site 8 total. | $176,000 |
| Jun 1, 2015 | Completed final sign-off Sep 2016 | 65 Reuel Ct | soft story retrofit per sfbc ch34b. building #5. seismic retrofit exsiting building. no work interiaors. iebc a4 used for retrofit.Details
soft story retrofit per sfbc ch34b. building #5. seismic retrofit exsiting building. no work interiaors. iebc a4 used for retrofit. | $3,300 |
| Jun 1, 2015 | Completed final sign-off Sep 2018 | 5 Cashmere St | building #2. seismic retrofit exsiting building. no work interiors.Details
building #2. seismic retrofit exsiting building. no work interiors. | $3,300 |
| Jun 1, 2015 | Completed final sign-off Sep 2016 | 15 Reuel Ct | building #6. soft story retrofit per sfbc chapter 34b & 2012 iebc appendix a-4.Details
building #6. soft story retrofit per sfbc chapter 34b & 2012 iebc appendix a-4. | $3,300 |
| Jun 1, 2015 | Completed final sign-off Sep 2016 | 1 Reuel Ct | building #7. seismic retrofit exsiting building. no work interiaors. ** maher: n/a **Details
building #7. seismic retrofit exsiting building. no work interiaors. ** maher: n/a ** | $3,300 |
| Jun 1, 2015 | Never finaled issued May 2016, no final | 55 Cashmere St | building #1. seismic retrofit exsiting building. no work interiaors. trash enclosures.Details
building #1. seismic retrofit exsiting building. no work interiaors. trash enclosures. | $3,300 |
| Jan 9, 2012 | Completed final sign-off Nov 2012 | 1728 Bancroft Av | hvac for a single story 2900 sq ft tenant improvement space, arch pa# 2011-0526-6849/r1Details
hvac for a single story 2900 sq ft tenant improvement space, arch pa# 2011-0526-6849/r1 | $10,000 |
| Oct 19, 2011 | Completed final sign-off Apr 2013 | 5075 03rd St | city job - revision to pa# 2009-0911-6627, 2011-0908-4123, 2011-0922-5234-lower mat slab between gridlines a & b, 3 & 5 by 30" for a joint utilities trench.Details
city job - revision to pa# 2009-0911-6627, 2011-0908-4123, 2011-0922-5234-lower mat slab between gridlines a & b, 3 & 5 by 30" for a joint utilities trench. | $30,000 |
| Sep 22, 2011 | Completed final sign-off Apr 2013 | 5075 03rd St | city job (s. f. library): rev. to (e) building permit (new construction) #200909116627. revise partial layout: switch location of electrical room and janitor's closet to comply with pg&e's requirement that the main electrical switchboard be located on the perimeter of the building.Details
city job (s. f. library): rev. to (e) building permit (new construction) #200909116627. revise partial layout: switch location of electrical room and janitor's closet to comply with pg&e's requirement that the main electrical switchboard be located on the perimeter of the building. | $3,000 |
| Sep 8, 2011 | Completed final sign-off Apr 2013 | 5075 03rd St | revision to appl #200909776627: modify small portion of one wall foundation (north west corner) per encounterted basement existing conditions of adjcent bldg.Details
revision to appl #200909776627: modify small portion of one wall foundation (north west corner) per encounterted basement existing conditions of adjcent bldg. | $25,000 |
| Jun 16, 2011 | Completed final sign-off Apr 2013 | 5075 03rd St | revision to pa# 2009.09.11.6627. reduce scope of work. remove proposed basement cistain and relocate fire system back flow preventer from basement to ground floor community roomDetails
revision to pa# 2009.09.11.6627. reduce scope of work. remove proposed basement cistain and relocate fire system back flow preventer from basement to ground floor community room | |
| May 26, 2011 | Completed final sign-off Nov 2012 | 1728 Bancroft Av | tenant improvement for single story 2,900 sf medical offices. change occupancy from e-3 to b.Details
tenant improvement for single story 2,900 sf medical offices. change occupancy from e-3 to b. | $200,000 |
| Sep 22, 2009 | Completed final sign-off Sep 2011 | 5025 03rd St | to demolish 1 story storeDetails
to demolish 1 story store | $120,000 |
| Sep 22, 2009 | Completed final sign-off Sep 2011 | 5075 03rd St | to demolish 1 story public library.Details
to demolish 1 story public library. | $120,000 |
| Sep 11, 2009 | Completed final sign-off May 2013 | 5075 03rd St | to erect 1 story public library building.Details
to erect 1 story public library building. | $5,750,000 |
| Mar 12, 2008 | Completed final sign-off Sep 2008 | 300 Stonecrest Dr | construction of wood pergola 10' high at rear on rec.park clubhouse property.Details
construction of wood pergola 10' high at rear on rec.park clubhouse property. | $18,000 |
| Dec 6, 2007 | Completed final sign-off Sep 2009 | 785 Moscow St | new construction of a 1-story restrooms and concession room on a vacant lot in crocker amazon park.Details
new construction of a 1-story restrooms and concession room on a vacant lot in crocker amazon park. | $75,000 |
| Dec 6, 2007 | Completed final sign-off Sep 2009 | 785 Moscow St | construct a new 1 story maintenance shed on vacant lot in crocker amazon park.Details
construct a new 1 story maintenance shed on vacant lot in crocker amazon park. | $75,000 |
| Oct 4, 2007 | Never finaled issued Oct 2007, no final | 2448 Clement St | remodel existing restaurant to provide new stair to mezzanine,reconfigure existing mezzanine, add 1 ada bathroom,reconfigure entry door, close off existing 2nd entry,relocate structuralwaal for new ada restroom,new kitchen equipment, new seating areaDetails
remodel existing restaurant to provide new stair to mezzanine,reconfigure existing mezzanine, add 1 ada bathroom,reconfigure entry door, close off existing 2nd entry,relocate structuralwaal for new ada restroom,new kitchen equipment, new seating area | $30,000 |
| Aug 6, 2007 | Expired or cancelled expired Apr 2008 | 2448 Clement St | lower raised floor to create hc accessible dining room & bathroom. all work done on the g/fDetails
lower raised floor to create hc accessible dining room & bathroom. all work done on the g/f | $1,800 |
| Oct 19, 2005 | Completed final sign-off Aug 2007 | 3275 16th St | 3-story addition to rear of (e) 3-story residence includes new covered porches on each floor & wood stair w/landings.Details
3-story addition to rear of (e) 3-story residence includes new covered porches on each floor & wood stair w/landings. | $50,000 |