Block 6575, lot 005
1580 Valencia St
- City’s use
- Commercial Misc
- Built
- 2018
- Stories
- 7
- Units
- 120
- Building
- 248,303 sq ft
- Lot
- 189,581 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
120 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2026 | In progress issued Sep 2026 | 1580 Valencia St | Herrero Builders Incorporated | 1st fl: renovation of project area on 1st fl for eos imaging suite.Details
1st fl: renovation of project area on 1st fl for eos imaging suite. | $180,000 |
| Sep 11, 2026 | In progress issued Sep 2026 | 1580 Valencia St | Herrero Builders Incorporated | soft demo per ab017. selective non structural demolition and associated protection of 1st fl suiteDetails
soft demo per ab017. selective non structural demolition and associated protection of 1st fl suite | $8,000 |
| Dec 22, 2025 | In progress issued Jan 2026 | 3501 Cesar Chavez St | The Boldt Company | erection of tower crane model liehberr 550 ec-h litronic. reference to new building site permit application #202004277259s.Details
erection of tower crane model liehberr 550 ec-h litronic. reference to new building site permit application #202004277259s. | $150,000 |
| Nov 26, 2025 | In progress issued Dec 2025 | 1580 Valencia St | Herrero Builders Incorporated | revision to pa 202502059733 scope of work adds card readers to the 2 doors leading from 1580 valencia street to parking garage. exits signs will also be added to the door leading to the stairsDetails
revision to pa 202502059733 scope of work adds card readers to the 2 doors leading from 1580 valencia street to parking garage. exits signs will also be added to the door leading to the stairs | $7,000 |
| Jun 23, 2025 | In progress issued Jun 2025 | 1580 Valencia St | Convergint Technologies Llc | fire alarm ti 1st fl lobby and 4th fl. add new notification devices in the 1st fl lobby and 4th fl. add new duct detector on 4th fl. add new smoke and power supply on 1st flDetails
fire alarm ti 1st fl lobby and 4th fl. add new notification devices in the 1st fl lobby and 4th fl. add new duct detector on 4th fl. add new smoke and power supply on 1st fl | $10,000 |
| May 20, 2025 | In progress issued Jul 2025 | 1580 Valencia St | The Boldt Company | revision to pa# 202411124847, revised north exit second flr structure to new sloped concrete slab without parapets to received hot rubberized asphalt roofing; revised below grade waterproofing for exterior wall at areas indicated. other scope revision are interior shotcrete wall reduction, new concrDetails
revision to pa# 202411124847, revised north exit second flr structure to new sloped concrete slab without parapets to received hot rubberized asphalt roofing; revised below grade waterproofing for exterior wall at areas indicated. other scope revision are interior shotcrete wall reduction, new concr | |
| Mar 20, 2025 | Completed final sign-off Dec 2025 | 1580 Valencia St | 4th/f: new improvement to e) fire sprinkler system 93 heads total. ref to t.i. pa# 202502059733Details
4th/f: new improvement to e) fire sprinkler system 93 heads total. ref to t.i. pa# 202502059733 | $22,000 | |
| Mar 20, 2025 | In progress issued Mar 2025 | 1580 Valencia St | 1st/f: new improvement to e) fire sprinkler system 36 heads total. ref to t.i. pa# 202502059733Details
1st/f: new improvement to e) fire sprinkler system 36 heads total. ref to t.i. pa# 202502059733 | $8,000 | |
| Feb 24, 2025 | In progress issued Feb 2025 | 1580 Valencia St | Convergint Technologies Llc | fire alarm t.i. 6th flr: add new notification devices in scope of work area. add 3 new duct detectors for hvac/fsd. all work to be done on an existing slc,nac,and speaker circuits. reference # 202410022184Details
fire alarm t.i. 6th flr: add new notification devices in scope of work area. add 3 new duct detectors for hvac/fsd. all work to be done on an existing slc,nac,and speaker circuits. reference # 202410022184 | $5,000 |
| Feb 7, 2025 | In progress issued May 2025 | 3501 Cesar Chavez St | Shield Fire Protection, Inc. | underground permit work includes: install underground piping from curb to building. install double detector check assemble. for future building under pa# 202004277259.Details
underground permit work includes: install underground piping from curb to building. install double detector check assemble. for future building under pa# 202004277259. | $20,000 |
| Feb 5, 2025 | Completed final sign-off Apr 2026 | 1580 Valencia St | Herrero Builders Incorporated | lvl 1- change finishes, flooring, ceiling, signage & wall coverings, new light & fix, mechnical, new power door assist to restrooms. lvl 4- build out new obgyn clinic w/ 16 exam rooms, 1-treatment, 1-nst & 1-conference room. deferred fire alarm & sprinklers.Details
lvl 1- change finishes, flooring, ceiling, signage & wall coverings, new light & fix, mechnical, new power door assist to restrooms. lvl 4- build out new obgyn clinic w/ 16 exam rooms, 1-treatment, 1-nst & 1-conference room. deferred fire alarm & sprinklers. | $1,500,000 |
| Nov 15, 2024 | Completed final sign-off Dec 2025 | 1580 Valencia St | 6th floor. new fire sprinkler t.i. to existing system on 6th floor of mob. reference pa#: 202410022184.Details
6th floor. new fire sprinkler t.i. to existing system on 6th floor of mob. reference pa#: 202410022184. | $65,000 | |
| Nov 15, 2024 | In progress issued Nov 2024 | 1580 Valencia St | Apex Site Solutions Inc | to obtain final inspection for work approved under pa#: 202108257135 all work is complete.Details
to obtain final inspection for work approved under pa#: 202108257135 all work is complete. | |
| Nov 13, 2024 | Completed final sign-off Jun 2025 | 555 San Jose Av | Rudolph And Sletten Inc | project scope includes replacement of (e) glazed door/sidelite w/ a (n) gate in existing person/chair lift to make osha compliant. no work visible from street.Details
project scope includes replacement of (e) glazed door/sidelite w/ a (n) gate in existing person/chair lift to make osha compliant. no work visible from street. | $25,000 |
| Nov 12, 2024 | In progress issued Mar 2025 | 1580 Valencia St | The Boldt Company | a make ready scope of re-routing the egress path of existing 1957 building to discharge to second floor lobby for north exit and partial demolition of second floor of existing 1957 lobby.Details
a make ready scope of re-routing the egress path of existing 1957 building to discharge to second floor lobby for north exit and partial demolition of second floor of existing 1957 lobby. | $250,000 |
| Oct 23, 2024 | Completed final sign-off Jan 2025 | 1580 Valencia St | Southland Industries | replacing (1) hvac system for 1st floor and replacing (1) vrf condensing unit with (n) unit and replace (8) ductless fan coils with (n) units and reconnect (e) refrigerant piping and drains pressure test piping and units and recharge with new r410a refrigerantDetails
replacing (1) hvac system for 1st floor and replacing (1) vrf condensing unit with (n) unit and replace (8) ductless fan coils with (n) units and reconnect (e) refrigerant piping and drains pressure test piping and units and recharge with new r410a refrigerant | $117,000 |
| Oct 2, 2024 | Completed final sign-off Apr 2026 | 1580 Valencia St | Herrero Builders Incorporated | 6/fl-ti for (n) medical office spaceDetails
6/fl-ti for (n) medical office space | $1,400,000 |
| Aug 1, 2024 | Completed final sign-off Mar 2025 | 1580 Valencia St | 3rd floor: new fire sprinkler t.i. to existing system of medical office building. ref pa#202405101906Details
3rd floor: new fire sprinkler t.i. to existing system of medical office building. ref pa#202405101906 | $20,000 | |
| Jul 23, 2024 | Completed final sign-off May 2025 | 1580 Valencia St | Convergint Technologies Llc | 3rd fl - fire alarm ti pa 202405101906. add 40 notification devices on (e) booster and speaker circuit; add 3 duct detector; core to remain as is. no matrix changesDetails
3rd fl - fire alarm ti pa 202405101906. add 40 notification devices on (e) booster and speaker circuit; add 3 duct detector; core to remain as is. no matrix changes | $25,000 |
| May 10, 2024 | Completed final sign-off Apr 2026 | 1580 Valencia St | Herrero Builders Incorporated | 3/f: interior t.i. construction of new medical office primary care clinic in existing 8-story monteagle medical office building. separate interior demo under permit 202310108295Details
3/f: interior t.i. construction of new medical office primary care clinic in existing 8-story monteagle medical office building. separate interior demo under permit 202310108295 | $1,400,000 |
| Mar 1, 2024 | In progress issued Mar 2024 | 555 San Jose Av | Convergint Technologies Llc | fire alarm ti level 1 eeg procedure room - relocate 1 (e) horn strobe, add (1) new strobe only on existing circuit. all other to remain. ref pa 202310058113Details
fire alarm ti level 1 eeg procedure room - relocate 1 (e) horn strobe, add (1) new strobe only on existing circuit. all other to remain. ref pa 202310058113 | $5,000 |
| Jan 24, 2024 | In progress issued Jan 2024 | 1580 Valencia St | ground floor: remove all (e) pendent sprinkler heads and drops. replace with upright sprinkler heads for coverage during demo. (17) heads total. ref pa 2023-1010-8295Details
ground floor: remove all (e) pendent sprinkler heads and drops. replace with upright sprinkler heads for coverage during demo. (17) heads total. ref pa 2023-1010-8295 | $4,000 | |
| Nov 28, 2023 | Completed final sign-off Jun 2024 | 1580 Valencia St | Kgpco Services Llc | removal of all (e) sprint equipment from the rooftop not to be replaced. a crane will be necessary to remove equipment from the building rooftop which will sit on duncan st. a traffic control plan is included in the plans.Details
removal of all (e) sprint equipment from the rooftop not to be replaced. a crane will be necessary to remove equipment from the building rooftop which will sit on duncan st. a traffic control plan is included in the plans. | $18,000 |
| Oct 10, 2023 | In progress issued Dec 2023 | 1580 Valencia St | Herrero Builders Incorporated | interior demo per ab 017 on levels 1,3,4,6Details
interior demo per ab 017 on levels 1,3,4,6 | $198,000 |
| Oct 5, 2023 | Completed final sign-off Apr 2024 | 555 San Jose Av | Herrero Builders Incorporated | work on 1st floor only - eeg procedure room remodel. remodel includes enlarging the existing eeg procedure room. reconfigure ceiling and door hardware.Details
work on 1st floor only - eeg procedure room remodel. remodel includes enlarging the existing eeg procedure room. reconfigure ceiling and door hardware. | $250,000 |
| Sep 15, 2023 | Never finaled issued Oct 2023, no final | 1580 Valencia St | remove existing pendent sprinkler and drops. install new upright sprinkler heads in place of pendants for temporary/shell protection during demo for floors 3,4,6.Details
remove existing pendent sprinkler and drops. install new upright sprinkler heads in place of pendants for temporary/shell protection during demo for floors 3,4,6. | $20,000 | |
| Nov 23, 2022 | Completed final sign-off Jan 2023 | 1580 Valencia St | H C I Systems Inc | for unit 802: to obtain final inspection for work approved under pa# 201403281915: all work is completed.Details
for unit 802: to obtain final inspection for work approved under pa# 201403281915: all work is completed. | |
| Oct 14, 2022 | Never finaled issued Oct 2022, no final | 1580 Valencia St | Centimark Corporation | reroofing | $255,347 |
| Jan 6, 2022 | Completed final sign-off Apr 2022 | 1580 Valencia St | Convergint Technologies Llc | basement level: fire alarm modification. add 1 new monitor module for new tamper switch located in the basement to be connected to existing circuit.Details
basement level: fire alarm modification. add 1 new monitor module for new tamper switch located in the basement to be connected to existing circuit. | $5,000 |
| Dec 9, 2021 | Completed final sign-off Dec 2021 | 1580 Valencia St | Convergint Technologies Llc | fire alarm record drawings. record drawings for original fire permit #201906062650. record drawings to supercede fire permit #202102104426. added (e) fire alarm matric on sheet fa 0.01-mDetails
fire alarm record drawings. record drawings for original fire permit #201906062650. record drawings to supercede fire permit #202102104426. added (e) fire alarm matric on sheet fa 0.01-m | |
| Dec 2, 2021 | Completed final sign-off Mar 2022 | 1580 Valencia St | The Boldt Company | suite #801:minor remodel of an existing medical.remove non-structual wall to combine 2 existing exam room into 1.Details
suite #801:minor remodel of an existing medical.remove non-structual wall to combine 2 existing exam room into 1. | $156,000 |
| Aug 27, 2021 | Completed final sign-off Apr 2022 | 3555 Cesar Chavez St | Weckworth Electric Group Inc | red cloud to reprogram the bda head end unit and replace the donor "roof antenna to comply with sf errcs frequency. all other components remain unchanged. ref 202108277252.Details
red cloud to reprogram the bda head end unit and replace the donor "roof antenna to comply with sf errcs frequency. all other components remain unchanged. ref 202108277252. | $10,000 |
| Aug 25, 2021 | Completed final sign-off Nov 2024 | 1580 Valencia St | Quality Telecom Consultants | verizon: replace 3 antennas, replace 6 rrus, replace 3 ovps, add 3 combiners, rplace 3 hybrid cables, at equipment replace 3 ovpsDetails
verizon: replace 3 antennas, replace 6 rrus, replace 3 ovps, add 3 combiners, rplace 3 hybrid cables, at equipment replace 3 ovps | $60,000 |
| Mar 1, 2021 | Completed final sign-off Sep 2023 | 1580 Valencia St | Herrero Builders Incorporated | revision to pa# 201905019452. revised to upgrade pg&e service.Details
revision to pa# 201905019452. revised to upgrade pg&e service. | |
| Feb 10, 2021 | Never finaled issued Apr 2021, no final | 1580 Valencia St | Convergint Technologies Llc | as-builts for permit #2019-0606-2650 -scope of work: -revised matrix to match existing building applications -revised addressing and locations of devicesDetails
as-builts for permit #2019-0606-2650 -scope of work: -revised matrix to match existing building applications -revised addressing and locations of devices | |
| Oct 29, 2020 | Completed final sign-off Jan 2021 | 555 San Jose Av | Convergint Technologies Llc | fire alarm as-builts for permit # 2019-0606-2646Details
fire alarm as-builts for permit # 2019-0606-2646 | |
| Sep 28, 2020 | Completed final sign-off Nov 2020 | 555 San Jose Av | relocate 2 pendent fire sprinklers on level 1 per owner revisons. ref pa201903155287.Details
relocate 2 pendent fire sprinklers on level 1 per owner revisons. ref pa201903155287. | $500 | |
| Sep 16, 2020 | Never finaled filed Sep 2020, never issued | 3555 Cesar Chavez St | this is an existing temp cell site on the parking structure roof. the temp site will be removed when the perm relocation site is on-air. building permit#2020-0311-6711 is approved and being pulled this month. this site needs to stay on air until the site at 10 29th is completedDetails
this is an existing temp cell site on the parking structure roof. the temp site will be removed when the perm relocation site is on-air. building permit#2020-0311-6711 is approved and being pulled this month. this site needs to stay on air until the site at 10 29th is completed | $50,000 | |
| Aug 12, 2020 | Completed final sign-off Mar 2023 | 3555 Cesar Chavez St | The Boldt Company | installation of subsurgace sanitary sewer and portable water tanks, temporary tree farm and interim parking.Details
installation of subsurgace sanitary sewer and portable water tanks, temporary tree farm and interim parking. | $200,000 |
| Jul 1, 2020 | Never finaled issued Jul 2020, no final | 3555 Cesar Chavez St | street space | ||
| Jun 29, 2020 | Never finaled issued Jul 2020, no final | 3555 Cesar Chavez St | Rudolph And Sletten Inc | construction of a retaining wall that will act as temporary shoring to facilitate the demolition of the 1957 building to the north while maintaining the driveway to the south. the wall will then be faced in shotcrete and will remain as a permanent site retaining wall. temp shoring under 201904248793Details
construction of a retaining wall that will act as temporary shoring to facilitate the demolition of the 1957 building to the north while maintaining the driveway to the south. the wall will then be faced in shotcrete and will remain as a permanent site retaining wall. temp shoring under 201904248793 | $65,000 |
| Apr 27, 2020 | Never finaled issued Nov 2023, no final | 3501 Cesar Chavez St | The Boldt Company | erect a five story type ib construction building with medical office, retail, amnd parking on 4 below ground levels.Details
erect a five story type ib construction building with medical office, retail, amnd parking on 4 below ground levels. | $27,500,000 |
| Mar 6, 2020 | Never finaled issued Mar 2020, no final | 3555 Cesar Chavez St | streetspace | ||
| Feb 27, 2020 | Completed final sign-off Sep 2020 | 3555 Cesar Chavez St | Rudolph And Sletten Inc | infill opening in west elevationDetails
infill opening in west elevation | $37,000 |
| Jan 14, 2020 | Expired or cancelled cancelled Jan 2026 | 555 San Jose Av | Rudolph And Sletten Inc | revision to 201807255526, civil sheet to address connection points between city utilities and new utilities in hartzel buildingDetails
revision to 201807255526, civil sheet to address connection points between city utilities and new utilities in hartzel building | |
| Nov 13, 2019 | Never finaled issued Nov 2019, no final | 3555 Cesar Chavez St | Rudolph And Sletten Inc | street space | |
| Oct 25, 2019 | Completed final sign-off Mar 2020 | 1580 Valencia St | Rudolph And Sletten Inc | upgrade (e) hvac system to suite 103, 1st flDetails
upgrade (e) hvac system to suite 103, 1st fl | $55,000 |
| Sep 25, 2019 | Never finaled issued Sep 2019, no final | 1580 Valencia St | install new 4"fire main for 1st fl fire sprinklers. safe off existing fire main from former cup bldg. ref pa 2019-0606-2650 and revision to 2019-0814-8707Details
install new 4"fire main for 1st fl fire sprinklers. safe off existing fire main from former cup bldg. ref pa 2019-0606-2650 and revision to 2019-0814-8707 | ||
| Aug 26, 2019 | Completed final sign-off Dec 2020 | 555 San Jose Av | ref pa# 201807255521; install (2) quick response sprinkler heads in new enrgy enclosures to parking garage n/a maherDetails
ref pa# 201807255521; install (2) quick response sprinkler heads in new enrgy enclosures to parking garage n/a maher | $500 | |
| Aug 14, 2019 | Never finaled issued Aug 2019, no final | 1580 Valencia St | install new 4" fire main for 1st floor fire sprinklers. demo existing main from former c.u.p building ref pa 2019-0606-2650Details
install new 4" fire main for 1st floor fire sprinklers. demo existing main from former c.u.p building ref pa 2019-0606-2650 | $5,000 | |
| Jul 22, 2019 | Completed final sign-off Mar 2021 | 3555 Cesar Chavez St | Rudolph And Sletten Inc | install new packaged heat pump on the roof of (e) 1957 bld stairwell to connect the (e) supply and return duct mains providing air to the ofc spaces in the 1912 bld. these space are currently condition by a fan in the 1957 bld. which is to be demolishedDetails
install new packaged heat pump on the roof of (e) 1957 bld stairwell to connect the (e) supply and return duct mains providing air to the ofc spaces in the 1912 bld. these space are currently condition by a fan in the 1957 bld. which is to be demolished | $25,000 |
| Jul 11, 2019 | Completed final sign-off Jul 2023 | 1580 Valencia St | Convergint Technologies Llc | basement - reconnect fire alarm to fire pump after replacement 4 monitor/control module. ref pa 2019-0501-9452Details
basement - reconnect fire alarm to fire pump after replacement 4 monitor/control module. ref pa 2019-0501-9452 | $2,112 |
| Jul 10, 2019 | Never finaled issued Jul 2022, no final | 1580 Valencia St | response to "approved with comments" fire pump make, model & rating & fire pump performance curve, controller maker & model. hanger & sway brace locations & details including sway bracing aload cals. ref 201905019452Details
response to "approved with comments" fire pump make, model & rating & fire pump performance curve, controller maker & model. hanger & sway brace locations & details including sway bracing aload cals. ref 201905019452 | $132,000 | |
| Jun 6, 2019 | Completed final sign-off Dec 2021 | 1580 Valencia St | Convergint Technologies Llc | upgrade fire alarm. 14 strobes. 68 speaker strobes. 2 booster panld. 102 smoke detectois. 10 pull stations. 4 control relays. ref pa# 2019/01/17/0599. ** maher: n/a **Details
upgrade fire alarm. 14 strobes. 68 speaker strobes. 2 booster panld. 102 smoke detectois. 10 pull stations. 4 control relays. ref pa# 2019/01/17/0599. ** maher: n/a ** | $88,000 |
| Jun 6, 2019 | Never finaled issued Jul 2019, no final | 555 San Jose Av | Convergint Technologies Llc | install new fire alarm. 1 annc. 2 booster pnl. 1 pull station. 11 control relays. 10 duct dedector. 15 smoke detector. 31 horn stobes. 6 strobes. 2 heat detoit. ref pa# 2018/07/25/5526. ** maher: n/a **Details
install new fire alarm. 1 annc. 2 booster pnl. 1 pull station. 11 control relays. 10 duct dedector. 15 smoke detector. 31 horn stobes. 6 strobes. 2 heat detoit. ref pa# 2018/07/25/5526. ** maher: n/a ** | $73,000 |
| May 29, 2019 | Never finaled issued May 2019, no final | 3555 Cesar Chavez St | street space | ||
| May 7, 2019 | Completed final sign-off Jan 2021 | 555 San Jose Av | revision to pa 2019-0315-5287, install new dcda assembly above gradeDetails
revision to pa 2019-0315-5287, install new dcda assembly above grade | $2,500 | |
| May 1, 2019 | Never finaled issued Jun 2019, no final | 1580 Valencia St | Herrero Builders Incorporated | replace (e) electric driven fire pumps in basement with one new electric driven fire pump and controller per nfpa 20 in same room/location as (e). reuse (e) utilities. fire pump to be provide with emegency electrical powerDetails
replace (e) electric driven fire pumps in basement with one new electric driven fire pump and controller per nfpa 20 in same room/location as (e). reuse (e) utilities. fire pump to be provide with emegency electrical power | $450,000 |
| Apr 24, 2019 | Completed final sign-off May 2021 | 3555 Cesar Chavez St | Rudolph And Sletten Inc | major alteration project consist of partial structural removel of a 4 story 31,274 sq foot (e) 1957 building and recladding of the remaining 1859 square foot stairwellDetails
major alteration project consist of partial structural removel of a 4 story 31,274 sq foot (e) 1957 building and recladding of the remaining 1859 square foot stairwell | $4,200,000 |
| Apr 17, 2019 | Completed final sign-off Nov 2021 | 1580 Valencia St | Convergint Technologies Llc | interconnect 3 fire alarms ref 201810032115 imstall temp fire system in bld to be demo'dDetails
interconnect 3 fire alarms ref 201810032115 imstall temp fire system in bld to be demo'd | $43,000 |
| Mar 18, 2019 | Never finaled issued Mar 2019, no final | 1580 Valencia St | Rudolph And Sletten Inc | temp water heater installation level 1 of 1912 bld 1580 valenciaDetails
temp water heater installation level 1 of 1912 bld 1580 valencia | $20,000 |
| Mar 15, 2019 | Completed final sign-off Jan 2021 | 555 San Jose Av | installing 195 new automatic quick response sprinklers in (e)building, & remove class 2 standpipe after work on sprinkler system is completed & inspectedDetails
installing 195 new automatic quick response sprinklers in (e)building, & remove class 2 standpipe after work on sprinkler system is completed & inspected | $138,435 | |
| Feb 26, 2019 | Completed final sign-off Oct 2019 | 3555 Cesar Chavez St | at&t installation of 3 at&t antenna sectors on temp cow; install 6 antennas 12 rrh's 2 dc surge protectors; 1 gps antennaDetails
at&t installation of 3 at&t antenna sectors on temp cow; install 6 antennas 12 rrh's 2 dc surge protectors; 1 gps antenna | $50,000 | |
| Jan 17, 2019 | Completed final sign-off Dec 2020 | 1580 Valencia St | Rudolph And Sletten Inc | mission bernal campus decant & demo project & utilities trence acress the court yard between the 1912 building and the hartzell building to tie the bldg utilities and fire alarm togetherDetails
mission bernal campus decant & demo project & utilities trence acress the court yard between the 1912 building and the hartzell building to tie the bldg utilities and fire alarm together | |
| Dec 12, 2018 | Completed final sign-off Dec 2020 | 555 San Jose Av | Rudolph And Sletten Inc | basement: demo of all existing tanks, feed water system, demestic hot water tanks., fulton thermal fluid, how water boiler, piping, ductwork, conduits and plumbing in mezzanime level and basement level. build back scope under separate permit.Details
basement: demo of all existing tanks, feed water system, demestic hot water tanks., fulton thermal fluid, how water boiler, piping, ductwork, conduits and plumbing in mezzanime level and basement level. build back scope under separate permit. | $31,500 |
| Dec 10, 2018 | Completed final sign-off Apr 2021 | 3555 Cesar Chavez St | Rudolph And Sletten Inc | to demolish a type 1-b, 12-story hospital with one basement.Details
to demolish a type 1-b, 12-story hospital with one basement. | $4,000,000 |
| Nov 14, 2018 | Completed final sign-off Apr 2019 | 1580 Valencia St | Rudolph And Sletten Inc | level 3, 3208 & 3209. new demising wall and door at roomsDetails
level 3, 3208 & 3209. new demising wall and door at rooms | $10,000 |
| Oct 16, 2018 | Completed final sign-off May 2020 | 555 San Jose Av | Rudolph And Sletten Inc | basement selective demo of e abandoned domestic water tank and associated piping in the hartzell cup. install new distribution board and pull box for utilize tie in.Details
basement selective demo of e abandoned domestic water tank and associated piping in the hartzell cup. install new distribution board and pull box for utilize tie in. | $240,000 |
| Oct 16, 2018 | Completed final sign-off Dec 2020 | 555 San Jose Av | Rudolph And Sletten Inc | new concrete pads for pge transformer to tie into untilities and new switchboard. utilities trench up san jose ave for future tie in to hartzell distribution panelDetails
new concrete pads for pge transformer to tie into untilities and new switchboard. utilities trench up san jose ave for future tie in to hartzell distribution panel | |
| Oct 11, 2018 | Completed final sign-off Nov 2020 | 3555 Cesar Chavez St | Rudolph And Sletten Inc | upturn sprinkler heads to prepare space for soft demo under 201810032115 maher not reqDetails
upturn sprinkler heads to prepare space for soft demo under 201810032115 maher not req | $100,000 |
| Oct 3, 2018 | Completed final sign-off Nov 2020 | 555 San Jose Av | Rudolph And Sletten Inc | 1st, 2nd and roof - interior and exterior selective demo for hartzell ti project ti under separate permit.Details
1st, 2nd and roof - interior and exterior selective demo for hartzell ti project ti under separate permit. | $600,000 |
| Oct 3, 2018 | Completed final sign-off Jan 2021 | 3555 Cesar Chavez St | Rudolph And Sletten Inc | the project consists of a non-structural interior demo of 2 vacant buildings on sutter mission bernal campus. the 1957 building scope includes interior demo of a 31,724 sf, 4 story bldg. the 1970 bldg interior demo scope includes 200,000 sf 12 story bldg with a basment. soft demo will commence uponDetails
the project consists of a non-structural interior demo of 2 vacant buildings on sutter mission bernal campus. the 1957 building scope includes interior demo of a 31,724 sf, 4 story bldg. the 1970 bldg interior demo scope includes 200,000 sf 12 story bldg with a basment. soft demo will commence upon | $750,000 |
| Aug 24, 2018 | Never finaled issued Oct 2018, no final | 3555 Cesar Chavez St | Illuminated Creations Dba Ellis & Ellis | erect 3 electric free standing signsDetails
erect 3 electric free standing signs | $12,000 |
| Aug 24, 2018 | Never finaled issued Oct 2018, no final | 3555 Cesar Chavez St | Illuminated Creations Dba Ellis & Ellis | erect non-electric free standing signDetails
erect non-electric free standing sign | $1,500 |
| Aug 24, 2018 | Never finaled issued Oct 2018, no final | 3555 Cesar Chavez St | Illuminated Creations Dba Ellis & Ellis | install 2 non-illuminated single faced wall plaquesDetails
install 2 non-illuminated single faced wall plaques | $1,000 |
| Aug 24, 2018 | Never finaled issued Oct 2018, no final | 3555 Cesar Chavez St | Illuminated Creations Dba Ellis & Ellis | install 2 non-illuminated single faced wall plaquesDetails
install 2 non-illuminated single faced wall plaques | $1,000 |
| Aug 24, 2018 | Never finaled issued Oct 2018, no final | 3555 Cesar Chavez St | Illuminated Creations Dba Ellis & Ellis | reface 2 existing free standing electric signs.Details
reface 2 existing free standing electric signs. | $3,000 |
| Aug 24, 2018 | Never finaled issued Oct 2018, no final | 3555 Cesar Chavez St | Illuminated Creations Dba Ellis & Ellis | install non-electrical single faced wall sign "mission bernal campus parking garage"Details
install non-electrical single faced wall sign "mission bernal campus parking garage" | $800 |
| Aug 24, 2018 | Never finaled issued Oct 2018, no final | 3555 Cesar Chavez St | Illuminated Creations Dba Ellis & Ellis | erect 2 electric free standing signsDetails
erect 2 electric free standing signs | $12,000 |
| Aug 24, 2018 | Never finaled issued Oct 2018, no final | 3555 Cesar Chavez St | Illuminated Creations Dba Ellis & Ellis | install (3) non-illuminated single faced wall plaquesDetails
install (3) non-illuminated single faced wall plaques | $1,800 |
| Aug 24, 2018 | Expired or cancelled cancelled Jan 2026 | 3555 Cesar Chavez St | Illuminated Creations Dba Ellis & Ellis | erect electric sign | $8,000 |
| Jul 25, 2018 | Completed final sign-off Dec 2020 | 555 San Jose Av | Rudolph And Sletten Inc | (1st floor-central courtyard): (n) disable access ramps and entry enclosure to parking garage. enclose garage entry with glass vestibule, (n) hardware to elevator lobbies. maher n/a.Details
(1st floor-central courtyard): (n) disable access ramps and entry enclosure to parking garage. enclose garage entry with glass vestibule, (n) hardware to elevator lobbies. maher n/a. | |
| Jul 25, 2018 | Completed final sign-off Jan 2021 | 555 San Jose Av | Rudolph And Sletten Inc | 1st and 2nd floor. interior demo on 1st & 2nd level. build back outpaitent medical offices on both levels. mep included & structural.Details
1st and 2nd floor. interior demo on 1st & 2nd level. build back outpaitent medical offices on both levels. mep included & structural. | $8,000,000 |
| Jul 25, 2018 | Expired or cancelled cancelled Jan 2026 | 3555 Cesar Chavez St | removal of (e) mri trailer, mri tunnel bridtge removal, infill of (e) opening in 1912 bldg wall & replacing one (e) door on same elevationDetails
removal of (e) mri trailer, mri tunnel bridtge removal, infill of (e) opening in 1912 bldg wall & replacing one (e) door on same elevation | ||
| May 22, 2018 | Never finaled issued May 2018, no final | 3555 Cesar Chavez St | Convergint Technologies Llc | ref app# 201711174273 for generator replacement.; fire alarm ti fo emeregency generator replacement including 2 dual monitor moduels.Details
ref app# 201711174273 for generator replacement.; fire alarm ti fo emeregency generator replacement including 2 dual monitor moduels. | $4,000 |
| Apr 30, 2018 | Completed final sign-off Sep 2018 | 1580 Valencia St | Rudolph And Sletten Inc | convert existing blood draw room into a fluid processing room, adding a pass thru cabinet in an (e) accessible toilet and adding a wall mount for an (e) monitor in an (e) soiled utility roomDetails
convert existing blood draw room into a fluid processing room, adding a pass thru cabinet in an (e) accessible toilet and adding a wall mount for an (e) monitor in an (e) soiled utility room | $32,000 |
| Apr 5, 2018 | Never finaled issued Apr 2018, no final | 1580 Valencia St | Convergint Technologies Llc | fire alarm - add new amp to (e) facu add 8 notification appliances & 1 duct detector for ti on basement & 1st floor. ref pa 2017-1117- n/a maherDetails
fire alarm - add new amp to (e) facu add 8 notification appliances & 1 duct detector for ti on basement & 1st floor. ref pa 2017-1117- n/a maher | $11,500 |
| Mar 23, 2018 | Expired or cancelled cancelled Jan 2026 | 1580 Valencia St | sprint - replace (e) antenna on rooftop add 3 new rru for wireless facility maher naDetails
sprint - replace (e) antenna on rooftop add 3 new rru for wireless facility maher na | $12,000 | |
| Feb 28, 2018 | Never finaled issued Feb 2018, no final | 3555 Cesar Chavez St | street space | ||
| Feb 28, 2018 | Never finaled issued Feb 2018, no final | 3555 Cesar Chavez St | sidewalk repair | ||
| Feb 28, 2018 | Never finaled issued Feb 2018, no final | 3555 Cesar Chavez St | street space | ||
| Feb 27, 2018 | Completed final sign-off Sep 2018 | 1580 Valencia St | Rudolph And Sletten Inc | 1st and basement floors: fire review was missed on 201711174274. fire dept/ requested a full arch. set. re-review for the same project to put it in record. revision to 2017-1117-4274.Details
1st and basement floors: fire review was missed on 201711174274. fire dept/ requested a full arch. set. re-review for the same project to put it in record. revision to 2017-1117-4274. | |
| Feb 2, 2018 | Completed final sign-off May 2018 | 1580 Valencia St | basement: deleted 17 upright sprinklers & added 15 pendent sprinklers in new in ceiling areas. level #1: deleted 12 upright sprinklers & added 9 pendent sprinklers in new ceiling area. ref app#201711174274. n/a for maher.Details
basement: deleted 17 upright sprinklers & added 15 pendent sprinklers in new in ceiling areas. level #1: deleted 12 upright sprinklers & added 9 pendent sprinklers in new ceiling area. ref app#201711174274. n/a for maher. | $8,000 | |
| Jan 24, 2018 | Completed final sign-off Sep 2018 | 1580 Valencia St | Rudolph And Sletten Inc | basement/1st floor: mep for 201711174274Details
basement/1st floor: mep for 201711174274 | |
| Jan 23, 2018 | Never finaled issued Jan 2018, no final | 1580 Valencia St | street space w/mta | ||
| Dec 15, 2017 | Completed final sign-off Dec 2017 | 3555 Cesar Chavez St | City Building Inc. | to obtain a final inspeciton for work already approved under pa# 201407231968 & 201405155923, all work is completeDetails
to obtain a final inspeciton for work already approved under pa# 201407231968 & 201405155923, all work is complete | |
| Nov 17, 2017 | Completed final sign-off Dec 2020 | 3555 Cesar Chavez St | Rudolph And Sletten Inc | 1st floor: install new emergency generator and related equipment on new concrete pads within extg outdoor uncovered service yard. install new green wall/plant screen fence and gate at entrance to the yard. for maherDetails
1st floor: install new emergency generator and related equipment on new concrete pads within extg outdoor uncovered service yard. install new green wall/plant screen fence and gate at entrance to the yard. for maher | $1,129,102 |
| Nov 17, 2017 | Completed final sign-off Sep 2018 | 1580 Valencia St | Rudolph And Sletten Inc | basement-1st floor: partial interior remodel of monteagle. basement &1st floor: (initial demo pender 201707182106)mechanical & electrical under separate permit. n/a for maherDetails
basement-1st floor: partial interior remodel of monteagle. basement &1st floor: (initial demo pender 201707182106)mechanical & electrical under separate permit. n/a for maher | $462,202 |
| Sep 8, 2017 | Never finaled issued Sep 2017, no final | 3555 Cesar Chavez St | street space | ||
| Sep 1, 2017 | Expired or cancelled cancelled Jan 2026 | 1580 Valencia St | existing roof access door to be tied into fire alarm with new hardware upon activation of alarm. door will unlock per sffc sec 504.3.1Details
existing roof access door to be tied into fire alarm with new hardware upon activation of alarm. door will unlock per sffc sec 504.3.1 | $12,000 | |
| Aug 23, 2017 | Never finaled issued Aug 2017, no final | 3555 Cesar Chavez St | street space | ||
| Jul 31, 2017 | Never finaled issued Aug 2017, no final | 1580 Valencia St | basement, 1/f- delete 17 pendent sprinklers and 1" drops. replace with 17 upright sprinklers at the basement level and 1/f. first floor - delete 12 pendants and replace with 6 uprights.Details
basement, 1/f- delete 17 pendent sprinklers and 1" drops. replace with 17 upright sprinklers at the basement level and 1/f. first floor - delete 12 pendants and replace with 6 uprights. | $5,100 | |
| Jul 18, 2017 | Completed final sign-off Aug 2017 | 3555 Cesar Chavez St | Rudolph And Sletten Inc | basement & ground floor - demolition of tenant improvement spaces in preparation of future tenant improvement under separate permit. n/a maher ordinanceDetails
basement & ground floor - demolition of tenant improvement spaces in preparation of future tenant improvement under separate permit. n/a maher ordinance | $74,000 |
| May 24, 2017 | Never finaled issued May 2017, no final | 3555 Cesar Chavez St | street space | ||
| Feb 9, 2017 | Never finaled issued Feb 2017, no final | 1580 Valencia St | Colin Construction Co | revision 201604225529. show location of medical gas on 4/fDetails
revision 201604225529. show location of medical gas on 4/f | |
| Jan 25, 2017 | Completed final sign-off Mar 2017 | 1580 Valencia St | H C I Systems Inc | 4th floor: add new fire alarm devices to extg fire alarm system in the new radiology and control rooms. all new notification devices shall be tied into extg bps located in comm/tele room. t.i. app#201604225529Details
4th floor: add new fire alarm devices to extg fire alarm system in the new radiology and control rooms. all new notification devices shall be tied into extg bps located in comm/tele room. t.i. app#201604225529 | $5,572 |
| Jan 12, 2017 | Never finaled issued Jan 2017, no final | 3555 Cesar Chavez St | street space | ||
| Aug 24, 2016 | Never finaled issued May 2017, no final | 3555 Cesar Chavez St | street space | ||
| Jul 28, 2016 | Completed final sign-off Jul 2017 | 1580 Valencia St | Potter Fire Protection | 4th flr: relocate 4 fire sprinklers, ref. permit 201604225529Details
4th flr: relocate 4 fire sprinklers, ref. permit 201604225529 | $2,500 |
| May 12, 2016 | Never finaled issued May 2016, no final | 3555 Cesar Chavez St | street space | ||
| Apr 22, 2016 | Completed final sign-off Aug 2017 | 1580 Valencia St | Colin Construction Co | 4th floor - remodel existing radiology rooms for new radiology room & control room.Details
4th floor - remodel existing radiology rooms for new radiology room & control room. | $190,000 |
| Mar 29, 2016 | Never finaled issued Mar 2016, no final | 3555 Cesar Chavez St | Firemaster | r-102 ansul install | $5,000 |
| Mar 25, 2016 | Expired or cancelled withdrawn Aug 2016 | 3555 Cesar Chavez St | Fuel Oil System | installation of new underground fuel tank and pipping hook up electrical commissioning of fuel tank and monitoring systemDetails
installation of new underground fuel tank and pipping hook up electrical commissioning of fuel tank and monitoring system | $350,000 |
| Mar 16, 2016 | Completed final sign-off Jan 2017 | 1580 Valencia St | Herrero Builders Incorporated | 4/f- provide new power conditioner & electrical panel to serve existing radiology rooms.Details
4/f- provide new power conditioner & electrical panel to serve existing radiology rooms. | $30,000 |
| Feb 25, 2016 | Completed final sign-off Jul 2017 | 3555 Cesar Chavez St | City Building Inc. | project is strictly a voluntary access barrier removal to add accessible van parking stall & restripe existing parking lot. final count with 2 van accessible & 2 standard accessible parking stalls.Details
project is strictly a voluntary access barrier removal to add accessible van parking stall & restripe existing parking lot. final count with 2 van accessible & 2 standard accessible parking stalls. | $25,000 |
| Feb 23, 2016 | Never finaled issued Feb 2016, no final | 1580 Valencia St | City Building Inc. | revision to pa 2015-0407-3006, change to door header framing detail.Details
revision to pa 2015-0407-3006, change to door header framing detail. | |
| Feb 12, 2016 | Never finaled issued Feb 2016, no final | 1580 Valencia St | De Haro Mechanical | suite 103 - hvac ti work new supply ductwork and exhaust duct work. new exhaust fans, new vav boxes. ref #201504073006Details
suite 103 - hvac ti work new supply ductwork and exhaust duct work. new exhaust fans, new vav boxes. ref #201504073006 | $50,000 |
| Feb 3, 2016 | Completed final sign-off Mar 2016 | 1580 Valencia St | Pribuss Engineering Inc | suite 103: fire sprinkler t.i. to relocate 7, adds 2: total 9: ref app#201504073006Details
suite 103: fire sprinkler t.i. to relocate 7, adds 2: total 9: ref app#201504073006 | $4,656 |
| Dec 15, 2015 | Completed final sign-off Jan 2016 | 1580 Valencia St | Sabah International Incorporated | #801- provide a modification of the (e) fire alarm system for partial tenant build out on the 8th floor, add (3) new ceiling speaker/strobes and (4) new ceiling strobes. maher naDetails
#801- provide a modification of the (e) fire alarm system for partial tenant build out on the 8th floor, add (3) new ceiling speaker/strobes and (4) new ceiling strobes. maher na | $8,761 |
| Apr 7, 2015 | Completed final sign-off Apr 2016 | 1580 Valencia St | City Building Inc. | 1st floor suite 103: remodel and reconfiguration of extg clinic space. selective demo, new partitions floor finishes, painting, ceiling, lighting cabinetry, & modifi cations to extg electrical,plmg, and hvac system. no change of use or occupancy are proposed. n/a for the maher .Details
1st floor suite 103: remodel and reconfiguration of extg clinic space. selective demo, new partitions floor finishes, painting, ceiling, lighting cabinetry, & modifi cations to extg electrical,plmg, and hvac system. no change of use or occupancy are proposed. n/a for the maher . | $180,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Rudolph And Sletten Inc (26), Convergint Technologies Llc (14), Herrero Builders Incorporated (11), Illuminated Creations Dba Ellis & Ellis (9), The Boldt Company (6), City Building Inc. (4), Colin Construction Co (2), H C I Systems Inc (2), Apex Site Solutions Inc, Centimark Corporation, De Haro Mechanical, Firemaster, Fuel Oil System, Kgpco Services Llc, Potter Fire Protection, Pribuss Engineering Inc, Quality Telecom Consultants, Sabah International Incorporated, Shield Fire Protection, Inc., Southland Industries, Weckworth Electric Group Inc
- Architects
- Kevin Day (14), E. Sue Smith (8), Chun-Kei Wong (2), Mehmoush Arsanjani (2), Anna Kempf, Donald Toy, Douglas Childs, Glen Hunt, Gregor Markel, Hga, Hugh Cotter, Madelyn Mcclellan, Sharon Woodworth, Smith Group, Timothy Hurvitz
- Engineers
- Alfred Schuchard, Carrie Mitchell, David Rodriguez, Guo Zhou, James Lam, Jesus B Cabellon Jr, Jon Alan Inman, Jon Alan Inman, Meng Hsiu Chen, Pardeep Jhutti, Paul O'connell, Richard H. Russell, Robert M. Graff, Shane Mccarthy, Tan A. Diep, Tony H Shakouri, Wissam Zalzali, Yi-Shu Kung
- Designers
- James Boutwell
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.