Robert M. Graff
- License
- S5113
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S5113 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Degenkolb Engineers
- Based in
- San Francisco
- On San Francisco permits
- Jun 2020 to Dec 2023
2 permits since 2000 (engineer on 2 permits): 1 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Plant Construction Co, Lp, Rudolph And Sletten Inc
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 27, 2023 | Completed final sign-off Feb 2025 | 100 Columbus Av | Plant Construction Co, Lp | shoring for jackson square improvements. to perform alterations to the (e) surface parking lot to accommodate a one-story building + basement and add'l site improvements.Details
shoring for jackson square improvements. to perform alterations to the (e) surface parking lot to accommodate a one-story building + basement and add'l site improvements. | $75,000 |
| Jun 29, 2020 | Never finaled issued Jul 2020, no final | 3555 Cesar Chavez St | Rudolph And Sletten Inc | construction of a retaining wall that will act as temporary shoring to facilitate the demolition of the 1957 building to the north while maintaining the driveway to the south. the wall will then be faced in shotcrete and will remain as a permanent site retaining wall. temp shoring under 201904248793Details
construction of a retaining wall that will act as temporary shoring to facilitate the demolition of the 1957 building to the north while maintaining the driveway to the south. the wall will then be faced in shotcrete and will remain as a permanent site retaining wall. temp shoring under 201904248793 | $65,000 |