Permit GraphShortlistSan Francisco building permits since 2000

Melissa Pesci

License
C32725
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C32725 at the Board for Professional Engineers
Listed as
architect, authorized agent-others, designer, engineer, lessee
Firm
Hammel, Green & Abrahamson
Based in
San Francisco
On San Francisco permits
Jun 2000 to Jan 2025

207 permits since 2000 (architect on 198 permits, designer on 4 permits, engineer on 2 permits, lessee on 2 permits, authorized agent-others on 1 permit): 168 completed, 2 in progress, 28 never finaled, 9 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Rudolph And Sletten Inc (14), Skyline Construction (14), Principal Builders Inc. (10), Sc Builders, Inc (8), Field Construction Inc. (7), Hathaway Dinwiddie Co. (6), Peacock Construction Inc (5), D A Pope Inc (4), Dome Construction Corp (3), Rossi Builders Inc. (3), Swinerton Builders (3), Mc Carthy Building Companies Inc (2), Skyline Capital Builders Llc (2), Truebeck Construction (2), Bbc Construction Inc., Bcci Construction Company, Cannon Constructors North Inc, Construction Concierge Inc., D Kelly Construction Inc., Dettaglio Construction Inc Dba Dci Const, Novo Construction Inc, Paniagua Construction Inc, Perfect Quality Construction, Plant Construction Co, Lp, San Francisco Commercial Builders Inc
Engineers
Brent Forslin (2), Jesse Avery (2), Jimmy Lau (2), Jon Alan Inman (2), Amit Wadhwa, Dainel Lewin, Dean Macy, Gamble + Design, Habtom Nugusse Tewelde, Kenneth Horns, Levi G. Abarte, Marcus Oden, Warren R. Pottebaum
Authorized agents
Chris Przybysz

Most recent permits

Showing the 100 most recent of 207.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jan 23, 2025In progress
issued Jan 2025
1155 Battery StSc Builders, Inc5th & 7th fl revision to pa # 2024-0927-1790 modification of (e) conference rooms & offices. new interior partitions. new doors & finishes. minor rework of (e) mech & electrical under separate permit for project
Details
Permit
202501238948
Permit issued
Jan 31, 2025

5th & 7th fl revision to pa # 2024-0927-1790 modification of (e) conference rooms & offices. new interior partitions. new doors & finishes. minor rework of (e) mech & electrical under separate permit for project

Open the permit page

Sep 27, 2024In progress
issued Jan 2025
1155 Battery StSc Builders, Inc4,5, and 7th fl multi level area ti modifications of existing spaces to conference rooms and office. new interior partitions, new doors and new finishes rk f e mech and electrical. 4th fl 880 sf, 5th 1404 sf, 7th fl 1472 sf
Details
Permit
202409271790
Permit issued
Jan 14, 2025

4,5, and 7th fl multi level area ti modifications of existing spaces to conference rooms and office. new interior partitions, new doors and new finishes rk f e mech and electrical. 4th fl 880 sf, 5th 1404 sf, 7th fl 1472 sf

Open the permit page

$300,000
Apr 10, 2024Completed
final sign-off Nov 2024
1 Sansome StMc Carthy Building Companies Incsuite 1900: interior office remodel. new non structural walls, new electrical, new millwork, rework existing mechanical, flooring, new ceiling, breakroom.
Details
Permit
202404109678
Permit issued
May 1, 2024
Final sign-off
Nov 15, 2024

suite 1900: interior office remodel. new non structural walls, new electrical, new millwork, rework existing mechanical, flooring, new ceiling, breakroom.

Open the permit page

$3,100,000
Mar 11, 2024Completed
final sign-off Nov 2024
1 Sansome StMc Carthy Building Companies Incsuite 1900: interior office demo of non structural paritions, ceiling, flooring, some mech and elec work. existing egress not impacted by demo work. existing sprinklers to remain.
Details
Permit
202403117550
Permit issued
Apr 4, 2024
Final sign-off
Nov 15, 2024

suite 1900: interior office demo of non structural paritions, ceiling, flooring, some mech and elec work. existing egress not impacted by demo work. existing sprinklers to remain.

Open the permit page

$95,000
Mar 13, 2023Never finaled
issued Mar 2023, no final
855 Geary StSkyline Constructionremoval of existing striping and re-striping of ground floor garage only. memorialization of change of planning use from public to private parking; ref cua# 2022-005541
Details
Permit
202303133589
Permit issued
Mar 17, 2023

removal of existing striping and re-striping of ground floor garage only. memorialization of change of planning use from public to private parking; ref cua# 2022-005541

Open the permit page

$6,000
Feb 28, 2023Completed
final sign-off Apr 2024
855 Geary StSkyline Constructionreplacement parking garage entry gates and doors
Details
Permit
202302282783
Permit issued
Mar 23, 2023
Final sign-off
Apr 4, 2024

replacement parking garage entry gates and doors

Open the permit page

$95,000
Dec 29, 2022Completed
final sign-off Sep 2023
1 California StField Construction Inc.29/f: interior renovation of tenant suite including addition of four (4) private offices with non-load bearing walls, new tiles, new light fixtures, finishes and furniture. mech and electrical upgrades.
Details
Permit
202212299382
Permit issued
Mar 27, 2023
Final sign-off
Sep 14, 2023

29/f: interior renovation of tenant suite including addition of four (4) private offices with non-load bearing walls, new tiles, new light fixtures, finishes and furniture. mech and electrical upgrades.

Open the permit page

$304,000
Jul 25, 2022Completed
final sign-off May 2023
855 Geary StSkyline Capital Builders Llc1st fl- expansion of office to include new act ceiling, non load bearing walls and finishes. remodel and add one restroom and new platform for ada lift.
Details
Permit
202207259272
Permit issued
Sep 7, 2022
Final sign-off
May 12, 2023

1st fl- expansion of office to include new act ceiling, non load bearing walls and finishes. remodel and add one restroom and new platform for ada lift.

Open the permit page

$1,500,000
Jun 29, 2022Never finaled
issued Sep 2022, no final
1275 Market StSan Francisco Commercial Builders Incadministrative permit to memorialize cafe for dph. no work under this permit ref work permit 201406279881/r1. operational assembly permit deferred.
Details
Permit
202206297431
Permit issued
Sep 8, 2022

administrative permit to memorialize cafe for dph. no work under this permit ref work permit 201406279881/r1. operational assembly permit deferred.

Open the permit page

May 20, 2022Completed
final sign-off Sep 2022
855 Geary StSkyline Constructiontwo new vehicle lifts at basement level, and ada stair handrail upgrades. lifts are for maintenance only. no addition of new parking or alteration of striping approved under pa# 202204071820.
Details
Permit
202205204708
Permit issued
May 27, 2022
Final sign-off
Sep 20, 2022

two new vehicle lifts at basement level, and ada stair handrail upgrades. lifts are for maintenance only. no addition of new parking or alteration of striping approved under pa# 202204071820.

Open the permit page

$45,000
May 10, 2022Completed
final sign-off Feb 2023
1800 Owens StPrincipal Builders Inc.floor c5: demolition of existing non-load bearing partitions and ceilings in existing kitchen. removal of all kitchen equipment.
Details
Permit
202205103857
Permit issued
Jul 26, 2022
Final sign-off
Feb 15, 2023

floor c5: demolition of existing non-load bearing partitions and ceilings in existing kitchen. removal of all kitchen equipment.

Open the permit page

$449,158
Apr 7, 2022Never finaled
issued Apr 2022, no final
855 Geary StSkyline Capital Builders Llcchange of use per planning from private parking to public parking. car share & bicycle parking at ground floor only per planning com motion no.20531. no change of use at basement or 2nd fl which remain private parking. no change of occupancy. all work is striping/barrier removal for ada parking.
Details
Permit
202204071820
Permit issued
Apr 12, 2022

change of use per planning from private parking to public parking. car share & bicycle parking at ground floor only per planning com motion no.20531. no change of use at basement or 2nd fl which remain private parking. no change of occupancy. all work is striping/barrier removal for ada parking.

Open the permit page

$50,000
Feb 15, 2022Completed
final sign-off Jun 2022
425 Market StSkyline Construction12th floor:revision to pa #202012070367 to relocate extg exit signage and card reader location.
Details
Permit
202202157992
Permit issued
May 20, 2022
Final sign-off
Jun 6, 2022

12th floor:revision to pa #202012070367 to relocate extg exit signage and card reader location.

Open the permit page

Feb 15, 2022Completed
final sign-off Jun 2022
425 Market StSkyline Construction13th floor:revision to pa #202012070382 to relocate extg exit signage and card reader location.
Details
Permit
202202157994
Permit issued
May 20, 2022
Final sign-off
Jun 6, 2022

13th floor:revision to pa #202012070382 to relocate extg exit signage and card reader location.

Open the permit page

Dec 15, 2021Completed
final sign-off Jul 2022
201 Mendell Strev to pa202107305451: mod (e) space. repair ceilings affcted by demo. (e) security gates and bars to be removed.
Details
Permit
202112154474
Permit issued
Dec 29, 2021
Final sign-off
Jul 25, 2022

rev to pa202107305451: mod (e) space. repair ceilings affcted by demo. (e) security gates and bars to be removed.

Open the permit page

Dec 15, 2021Never finaled
issued Dec 2021, no final
1800 Owens StPrincipal Builders Inc.12th fl bldg c - administrative conversion of existing library (b occupancy) to classroom (a occupancy) occ load: 84.
Details
Permit
202112154514
Permit issued
Dec 21, 2021

12th fl bldg c - administrative conversion of existing library (b occupancy) to classroom (a occupancy) occ load: 84.

Open the permit page

Dec 10, 2021Completed
final sign-off Sep 2023
630 Cesar Chavez StTruebeck Constructiondemolition of existing warehouse, including foundation
Details
Permit
202112104138
Permit issued
Mar 9, 2023
Final sign-off
Sep 21, 2023

demolition of existing warehouse, including foundation

Open the permit page

$15,000
Nov 12, 2021Completed
final sign-off May 2022
500 03rd StRossi Builders Inc.suite 110: interior renovation: new ceiling tiles, new light fixtures, new flooring throughout. selectrive demo and construction as shower on plans. deferrered mep & fire/life safety. maher n/a.
Details
Permit
202111122242
Permit issued
Jan 28, 2022
Final sign-off
May 16, 2022

suite 110: interior renovation: new ceiling tiles, new light fixtures, new flooring throughout. selectrive demo and construction as shower on plans. deferrered mep & fire/life safety. maher n/a.

Open the permit page

$199,000
Nov 10, 2021Expired or cancelled
withdrawn Jun 2022
630 Cesar Chavez StTruebeck Constructionerect new 1-story bldg, type 1-a, occup. use f-1/s-1, for new maintenance and vehicle charging facility for cruise.
Details
Permit
202111102145

erect new 1-story bldg, type 1-a, occup. use f-1/s-1, for new maintenance and vehicle charging facility for cruise.

Open the permit page

$750,000
Sep 8, 2021Completed
final sign-off Jul 2022
1800 Owens StPrincipal Builders Inc.4th fl ti in sectors c and d. work includes non structural partitoins, act, fixtures and finishes
Details
Permit
202109087932
Permit issued
Apr 8, 2022
Final sign-off
Jul 29, 2022

4th fl ti in sectors c and d. work includes non structural partitoins, act, fixtures and finishes

Open the permit page

$1,500,000
Aug 19, 2021Completed
final sign-off Feb 2022
100 California StPrincipal Builders Inc.14/f: interior renovation of tenant suite. renovation of 2 converence rooms, 2 huddle rooms into 2 private offices and 1 small conference room and seating area. new non load bearing walls,ceiling tiles, new lights, finishes
Details
Permit
202108196702
Permit issued
Sep 3, 2021
Final sign-off
Feb 3, 2022

14/f: interior renovation of tenant suite. renovation of 2 converence rooms, 2 huddle rooms into 2 private offices and 1 small conference room and seating area. new non load bearing walls,ceiling tiles, new lights, finishes

Open the permit page

$170,000
Jul 30, 2021Never finaled
issued Dec 2021, no final
201 Mendell StPlant Construction Co, Lpinterior renovations of commercial tenant space to include new doors at demising wall, new ceiling tiles, new ada upgrades to (e) restrooms. portion of the building change of use from assembly to photo studio(a-3 to b). mep and fire life safety under separate permit.
Details
Permit
202107305451
Permit issued
Dec 29, 2021

interior renovations of commercial tenant space to include new doors at demising wall, new ceiling tiles, new ada upgrades to (e) restrooms. portion of the building change of use from assembly to photo studio(a-3 to b). mep and fire life safety under separate permit.

Open the permit page

$750,000
Jun 15, 2021Never finaled
issued Jun 2021, no final
425 Market StSkyline Construction13/f: rev to pa20201207382 to show new and existing card readers and updated door schedule. maher n/a
Details
Permit
202106152438
Permit issued
Jun 22, 2021

13/f: rev to pa20201207382 to show new and existing card readers and updated door schedule. maher n/a

Open the permit page

Jun 2, 2021Never finaled
issued Jul 2021, no final
425 Market StSkyline Constructionrevision to 202012070367 to show new and existing card readers. show updated door shedule and new mill work
Details
Permit
202106021480
Permit issued
Jul 14, 2021

revision to 202012070367 to show new and existing card readers. show updated door shedule and new mill work

Open the permit page

May 14, 2021Expired or cancelled
cancelled Jan 2026
425 Market Strevison to pa# 2020-1207-0367. installation of card readers - 12/f.
Details
Permit
202105140419

revison to pa# 2020-1207-0367. installation of card readers - 12/f.

Open the permit page

Mar 22, 2021Never finaled
issued May 2021, no final
1800 Owens StPrincipal Builders Inc.2nd fl: tenant improvement includes demo of non-load bearing partitions. construction to include new non-load bearing partitions, lighting, millwork, & finishes. mep & fire life safety under separate permit.
Details
Permit
202103227018
Permit issued
May 25, 2021

2nd fl: tenant improvement includes demo of non-load bearing partitions. construction to include new non-load bearing partitions, lighting, millwork, & finishes. mep & fire life safety under separate permit.

Open the permit page

$300,000
Jan 13, 2021Never finaled
issued Jun 2021, no final
1501 Tennessee Stadministrative change of use to document land use designation from storage warehouse to motor vehicle tow service.no work under this permit; all life-safety and egress to be revied under future t.i. permit. no cfc to be issued for this use until future t.i is filed and issued.
Details
Permit
202101132635
Permit issued
Jun 29, 2021

administrative change of use to document land use designation from storage warehouse to motor vehicle tow service.no work under this permit; all life-safety and egress to be revied under future t.i. permit. no cfc to be issued for this use until future t.i is filed and issued.

Open the permit page

Dec 7, 2020Completed
final sign-off May 2022
425 Market StSkyline Construction12/f: interior modification of (e) office space. demo of non-load bearing partitions, (n) non-load bearing partitions, (n) finishes etc. mep, life safety and sprinklers under separate permit. building fully sprinklered
Details
Permit
202012070367
Permit issued
Feb 3, 2021
Final sign-off
May 31, 2022

12/f: interior modification of (e) office space. demo of non-load bearing partitions, (n) non-load bearing partitions, (n) finishes etc. mep, life safety and sprinklers under separate permit. building fully sprinklered

Open the permit page

$750,000
Dec 7, 2020Completed
final sign-off Jun 2022
425 Market StSkyline Construction13th floor: interior modifications of existing office space, demo of non-loading partitions, ceilings. new non-load beaing partitions, new finishes, etc. mep, life safety, & sprinklers under separate permit. building fully sprinklered.
Details
Permit
202012070382
Permit issued
Feb 3, 2021
Final sign-off
Jun 6, 2022

13th floor: interior modifications of existing office space, demo of non-loading partitions, ceilings. new non-load beaing partitions, new finishes, etc. mep, life safety, & sprinklers under separate permit. building fully sprinklered.

Open the permit page

$750,000
Nov 30, 2020Completed
final sign-off Nov 2021
163 Freelon StSc Builders, Inctenant improvement consists of selective demolition of non load bearing partitions. demo of existing lighting. construction of new non load bearing partitions. mep under separate permit.
Details
Permit
202011309851
Permit issued
Aug 10, 2021
Final sign-off
Nov 17, 2021

tenant improvement consists of selective demolition of non load bearing partitions. demo of existing lighting. construction of new non load bearing partitions. mep under separate permit.

Open the permit page

$75,000
Nov 23, 2020Completed
final sign-off Aug 2021
901 Mission StSc Builders, Inc3/f: t.i. of (e) office space including selective demo of non-load bearing partitions, new finishes, millwork & furniture. mep under sep permit if affects (e) system if needed. bldg is fully sprinkled.
Details
Permit
202011239545
Permit issued
Feb 18, 2021
Final sign-off
Aug 26, 2021

3/f: t.i. of (e) office space including selective demo of non-load bearing partitions, new finishes, millwork & furniture. mep under sep permit if affects (e) system if needed. bldg is fully sprinkled.

Open the permit page

$2,200,000
Oct 31, 2020Completed
final sign-off Aug 2021
160 Spear StSc Builders, Inc15th fl, #1500: (e) office partial t.i.. (n) non-structural partition. (n) millwork, (n) flooring, (n) m.e.p. submitted separately.
Details
Permit
202010317929
Permit issued
Apr 16, 2021
Final sign-off
Aug 16, 2021

15th fl, #1500: (e) office partial t.i.. (n) non-structural partition. (n) millwork, (n) flooring, (n) m.e.p. submitted separately.

Open the permit page

$310,000
Oct 17, 2020Completed
final sign-off Dec 2021
1800 Owens StPrincipal Builders Inc.bldg c: 11th floor ti: add 8 offices, 1 print station. modify (e) conference room to reception area (area of work 1140 sq ft). 12th floor ti: add 6 offices, 1 print station. modify (e) quiet room into a "mother's room" (area of work 1009 sq ft.
Details
Permit
202010176740
Permit issued
Dec 11, 2020
Final sign-off
Dec 14, 2021

bldg c: 11th floor ti: add 8 offices, 1 print station. modify (e) conference room to reception area (area of work 1140 sq ft). 12th floor ti: add 6 offices, 1 print station. modify (e) quiet room into a "mother's room" (area of work 1009 sq ft.

Open the permit page

$500,000
Aug 24, 2020Completed
final sign-off Dec 2020
1100 Van Ness AvRudolph And Sletten Incmodification of existing hardware on levels 4, 5 and 6
Details
Permit
202008242523
Permit issued
Oct 8, 2020
Final sign-off
Dec 29, 2020

modification of existing hardware on levels 4, 5 and 6

Open the permit page

$160,000
Aug 22, 2020Completed
final sign-off Dec 2020
1100 Van Ness AvRudolph And Sletten Incmodification of (e) hardware on levels 2 & 3. addition of electrical outlets in conference room on level 3 and addition of curtain and tracks to level 6. n/a maher
Details
Permit
202008222373
Permit issued
Oct 7, 2020
Final sign-off
Dec 29, 2020

modification of (e) hardware on levels 2 & 3. addition of electrical outlets in conference room on level 3 and addition of curtain and tracks to level 6. n/a maher

Open the permit page

$160,000
Mar 3, 2020Completed
final sign-off Aug 2020
1100 Van Ness AvRudolph And Sletten Incmodify electrical outlets, electrical panels, curtains, casework, and equipment in 1415 sq ft on level 4 & 5 of the existing medical office building and add a transformer to the existing mechanical room on level 2.
Details
Permit
202003036058
Permit issued
Mar 12, 2020
Final sign-off
Aug 11, 2020

modify electrical outlets, electrical panels, curtains, casework, and equipment in 1415 sq ft on level 4 & 5 of the existing medical office building and add a transformer to the existing mechanical room on level 2.

Open the permit page

$620,000
Jan 15, 2020Expired or cancelled
cancelled Jan 2026
160 Spear St3rd fl: interior office demolition only to existing partitions, plumbing, and finishes. per ab-017
Details
Permit
202001151924

3rd fl: interior office demolition only to existing partitions, plumbing, and finishes. per ab-017

Open the permit page

$50,000
Dec 20, 2019Never finaled
issued Jan 2020, no final
101 California StPrincipal Builders Inc.15th fl - ti including construction of new non-load bearing full height demising wall for new sublease suite. minor mechanical & plumbing to be altered a required by new partition
Details
Permit
201912200103
Permit issued
Jan 8, 2020

15th fl - ti including construction of new non-load bearing full height demising wall for new sublease suite. minor mechanical & plumbing to be altered a required by new partition

Open the permit page

$100,000
Sep 24, 2019Completed
final sign-off Nov 2020
500 Terry A Francois BlPrincipal Builders Inc.demo of structural slab, construction of new commercial kitchen, refresh of furniture/finishes in dining room. mep upgrades to serve new work including (2) slab penetrations for exhaust duct to roof
Details
Permit
201909242471
Permit issued
Jun 16, 2020
Final sign-off
Nov 12, 2020

demo of structural slab, construction of new commercial kitchen, refresh of furniture/finishes in dining room. mep upgrades to serve new work including (2) slab penetrations for exhaust duct to roof

Open the permit page

$2,500,000
Sep 20, 2019Completed
final sign-off Feb 2025
2 Embarcadero CenterDome Construction Corpsuite r2308/promenade level: new door opening within (e) building
Details
Permit
201909202286
Permit issued
Sep 24, 2019
Final sign-off
Feb 18, 2025

suite r2308/promenade level: new door opening within (e) building

Open the permit page

$11,000
Jul 26, 2019Completed
final sign-off Oct 2020
247 32nd Avconstruction of wood post fence 10' ht at rear of property. new fence to be same height as (e) metal fence behind
Details
Permit
201907267088
Permit issued
Jul 31, 2019
Final sign-off
Oct 1, 2020

construction of wood post fence 10' ht at rear of property. new fence to be same height as (e) metal fence behind

Open the permit page

$2,000
Jul 23, 2019Never finaled
issued Dec 2020, no final
2353 North Point StConstruction Concierge Inc.addition of a partial 4th flr & roof deck on an (e) 3-story, (2) unit house. 1st flr expansion by 8'-0" @ rear. as well as the replacement of (2) (e) decks @ rear. structural permit to follow
Details
Permit
201907236664
Permit issued
Dec 14, 2020

addition of a partial 4th flr & roof deck on an (e) 3-story, (2) unit house. 1st flr expansion by 8'-0" @ rear. as well as the replacement of (2) (e) decks @ rear. structural permit to follow

Open the permit page

$300,000
Jul 9, 2019Completed
final sign-off Aug 2020
2 Embarcadero CenterDome Construction Corpec 2, promenade level, suite r2308. interior build-out of (e) building incl demo, (n) finishes, (n) plumbing, minor electrical and partitions. (e) mech, electrical, plumb and sprinkler system modification is under separate permit
Details
Permit
201907095363
Permit issued
Jul 9, 2019
Final sign-off
Aug 12, 2020

ec 2, promenade level, suite r2308. interior build-out of (e) building incl demo, (n) finishes, (n) plumbing, minor electrical and partitions. (e) mech, electrical, plumb and sprinkler system modification is under separate permit

Open the permit page

$500,000
Feb 6, 2019Completed
final sign-off Apr 2019
1100 Van Ness AvRudolph And Sletten Inc2nd & 3rd floor - revision to pa 2017-1020-1778 add card readers and exit signs and metal stud details
Details
Permit
201902062176
Permit issued
Mar 27, 2019
Final sign-off
Apr 8, 2019

2nd & 3rd floor - revision to pa 2017-1020-1778 add card readers and exit signs and metal stud details

Open the permit page

Feb 6, 2019Completed
final sign-off Apr 2019
1100 Van Ness AvRudolph And Sletten Inc5th floor - revision to pa 2017-0927-9716 and 2018-0517-9347 add card readers and exit signs and metal stud details
Details
Permit
201902062178
Permit issued
Mar 27, 2019
Final sign-off
Apr 11, 2019

5th floor - revision to pa 2017-0927-9716 and 2018-0517-9347 add card readers and exit signs and metal stud details

Open the permit page

Nov 15, 2018Completed
final sign-off May 2019
1100 Van Ness AvRudolph And Sletten Inc7th flr - revisiont o 201710131168 adding card readers. removing and adding exit signs. adding recalimed wood panels approx 250sf
Details
Permit
201811155965
Permit issued
Jan 8, 2019
Final sign-off
May 1, 2019

7th flr - revisiont o 201710131168 adding card readers. removing and adding exit signs. adding recalimed wood panels approx 250sf

Open the permit page

Oct 24, 2018Completed
final sign-off Apr 2019
1100 Van Ness AvRudolph And Sletten Inc6th fl: revision to #201709279722 add card readers, revised exit signs and add metal stud details
Details
Permit
201810243977
Permit issued
Mar 27, 2019
Final sign-off
Apr 8, 2019

6th fl: revision to #201709279722 add card readers, revised exit signs and add metal stud details

Open the permit page

Oct 24, 2018Completed
final sign-off Apr 2019
1100 Van Ness AvRudolph And Sletten Inc4th fl: revision to #201708175144 add card readers, adding and removing exit signs, adding metal stud framing details
Details
Permit
201810243985
Permit issued
Mar 27, 2019
Final sign-off
Apr 4, 2019

4th fl: revision to #201708175144 add card readers, adding and removing exit signs, adding metal stud framing details

Open the permit page

Oct 24, 2018Completed
final sign-off Dec 2021
625 02nd StSc Builders, Inc, Cannon Constructors North Inc4th fl ti: selective demo (e) non-load bearing walls, lighting, etc; construct (n) partitions, ceiling, etc; mep/srpinkler will be design build under sep submittal. building is fully sprinklered.
Details
Permit
201810243992
Permit issued
Dec 12, 2018
Final sign-off
Dec 20, 2021

4th fl ti: selective demo (e) non-load bearing walls, lighting, etc; construct (n) partitions, ceiling, etc; mep/srpinkler will be design build under sep submittal. building is fully sprinklered.

Open the permit page

$600,000
May 17, 2018Completed
final sign-off Apr 2019
1100 Van Ness AvRudolph And Sletten Inc5th fl - revision to pa 2017-0927-9716 and 2018-0416-6404 adding gamma rey machine to scope and additional correction to building & engineering pages
Details
Permit
201805179347
Permit issued
Jun 12, 2018
Final sign-off
Apr 11, 2019

5th fl - revision to pa 2017-0927-9716 and 2018-0416-6404 adding gamma rey machine to scope and additional correction to building & engineering pages

Open the permit page

Nov 17, 2017Completed
final sign-off Dec 2020
3555 Cesar Chavez StRudolph And Sletten Inc1st floor: install new emergency generator and related equipment on new concrete pads within extg outdoor uncovered service yard. install new green wall/plant screen fence and gate at entrance to the yard. for maher
Details
Permit
201711174273
Permit issued
May 14, 2018
Final sign-off
Dec 11, 2020

1st floor: install new emergency generator and related equipment on new concrete pads within extg outdoor uncovered service yard. install new green wall/plant screen fence and gate at entrance to the yard. for maher

Open the permit page

$1,129,102
Oct 20, 2017Completed
final sign-off Apr 2019
1100 Van Ness AvRudolph And Sletten Inc(2nd & 3rd flrs) medical office building (clinic, outpatient) t.i. mechanical, electrical, plumbing & structural included. 1st time build out. (oshpd 3 permit)
Details
Permit
201710201778
Permit issued
Sep 7, 2018
Final sign-off
Apr 5, 2019

(2nd & 3rd flrs) medical office building (clinic, outpatient) t.i. mechanical, electrical, plumbing & structural included. 1st time build out. (oshpd 3 permit)

Open the permit page

$7,285,102
Sep 27, 2017Completed
final sign-off Apr 2019
1100 Van Ness AvRudolph And Sletten Inc(5th fl): medical office bldg (clinic outpatient) is a t.i. project. 1st time buildout, single fl t.i. (mep, life safety and sprinklers under separate permit)
Details
Permit
201709279716
Permit issued
Mar 20, 2018
Final sign-off
Apr 11, 2019

(5th fl): medical office bldg (clinic outpatient) is a t.i. project. 1st time buildout, single fl t.i. (mep, life safety and sprinklers under separate permit)

Open the permit page

$4,641,551
Sep 27, 2017Completed
final sign-off Apr 2019
1100 Van Ness AvRudolph And Sletten Inc(6th flr) medical office bldg (clinic, outpatient) is a t.i. project, 1st time build out, single floor t.i.; meps, life safety & sprinklers under separate permit. maher n/a.
Details
Permit
201709279722
Permit issued
Mar 28, 2018
Final sign-off
Apr 19, 2019

(6th flr) medical office bldg (clinic, outpatient) is a t.i. project, 1st time build out, single floor t.i.; meps, life safety & sprinklers under separate permit. maher n/a.

Open the permit page

$4,393,775
Aug 17, 2017Completed
final sign-off Apr 2019
1100 Van Ness AvRudolph And Sletten Inc4/f- t. i. to a medical office building for clinic outpatient, 1st time build out, single floor t.i., meps. life safety and sprinklers under seperate permit. n/a maher ordinance #155-13
Details
Permit
201708175144
Permit issued
Mar 28, 2018
Final sign-off
Apr 19, 2019

4/f- t. i. to a medical office building for clinic outpatient, 1st time build out, single floor t.i., meps. life safety and sprinklers under seperate permit. n/a maher ordinance #155-13

Open the permit page

$4,854,717
Jul 6, 2017Completed
final sign-off Nov 2020
222 Sutter StNovo Construction Inc5th fl ti: including demo of non-loading partitions, (n) non-load bearing partitions. meps, structural, fire sprinkler and fire alarm will be submitted under seperate permit if needed. (building is fully sprinklered) maher na
Details
Permit
201707061086
Permit issued
Jul 24, 2017
Final sign-off
Nov 9, 2020

5th fl ti: including demo of non-loading partitions, (n) non-load bearing partitions. meps, structural, fire sprinkler and fire alarm will be submitted under seperate permit if needed. (building is fully sprinklered) maher na

Open the permit page

$922,383
Dec 29, 2016Completed
final sign-off Dec 2017
325 Newhall StDome Construction Corptenant improvement of (e) warehouse bldg includes selective demolition, construction of (n) partitions, mezzanine, (n) doors & windows, finishes, ceiling, 2(n) restrooms, elect, mech & plumbing work as required by layout. new ext door. replace 3 (e)doors.
Details
Permit
201612296154
Permit issued
May 26, 2017
Final sign-off
Dec 15, 2017

tenant improvement of (e) warehouse bldg includes selective demolition, construction of (n) partitions, mezzanine, (n) doors & windows, finishes, ceiling, 2(n) restrooms, elect, mech & plumbing work as required by layout. new ext door. replace 3 (e)doors.

Open the permit page

$1,149,688
May 6, 2016Completed
final sign-off Jun 2016
128 Spear StPrincipal Builders Inc.3rd floor: revision to app#201602260625 sliding door in conference room. n/a for maher.
Details
Permit
201605066746
Permit issued
May 31, 2016
Final sign-off
Jun 16, 2016

3rd floor: revision to app#201602260625 sliding door in conference room. n/a for maher.

Open the permit page

Sep 23, 2015Completed
final sign-off Nov 2015
111 Sutter StField Construction Inc.ti includes the demo of non-structural partitions.
Details
Permit
201509237750
Permit issued
Oct 9, 2015
Final sign-off
Nov 16, 2015

ti includes the demo of non-structural partitions.

Open the permit page

$130,000
Aug 27, 2015Completed
final sign-off Apr 2016
250 Sutter StSkyline Construction6th floor: ti - includes demo of non structural partitions and bldg back new non structural partition. all new or revised meps & life saftey & sprinkler work will be submitted under under sep permit. bld is fully sprinklered. maher na
Details
Permit
201508275415
Permit issued
Sep 1, 2015
Final sign-off
Apr 1, 2016

6th floor: ti - includes demo of non structural partitions and bldg back new non structural partition. all new or revised meps & life saftey & sprinkler work will be submitted under under sep permit. bld is fully sprinklered. maher na

Open the permit page

$137,070
Jul 29, 2015Completed
final sign-off Sep 2016
1600 Geary BlDettaglio Construction Inc Dba Dci Const1st floor: renovation of existing ground level podiatrist medical offices
Details
Permit
201507292782
Permit issued
Feb 9, 2016
Final sign-off
Sep 9, 2016

1st floor: renovation of existing ground level podiatrist medical offices

Open the permit page

$208,208
Jul 24, 2015Completed
final sign-off Sep 2015
711 Van Ness AvPerfect Quality Construction#505- converting conference room into office and extending existing office, replace carpet, remodeling breakroom.
Details
Permit
201507242351
Permit issued
Jul 24, 2015
Final sign-off
Sep 9, 2015

#505- converting conference room into office and extending existing office, replace carpet, remodeling breakroom.

Open the permit page

$143,303
Jul 17, 2015Completed
final sign-off Aug 2015
711 Van Ness Av5th fl suite 505 demo only per ab-017
Details
Permit
201507171762
Permit issued
Jul 17, 2015
Final sign-off
Aug 11, 2015

5th fl suite 505 demo only per ab-017

Open the permit page

$25,000
Nov 3, 2014Completed
final sign-off May 2015
1 Maritime PzPrincipal Builders Inc.16th floor - t.i. on partial tenant floor space to demo & construct new partitions, doors, millwork & finishes as well as mep. life safety & fire sprinklers will be submitted separately. n/a mahor ordinance
Details
Permit
201411030505
Permit issued
Nov 7, 2014
Final sign-off
May 7, 2015

16th floor - t.i. on partial tenant floor space to demo & construct new partitions, doors, millwork & finishes as well as mep. life safety & fire sprinklers will be submitted separately. n/a mahor ordinance

Open the permit page

$350,000
Oct 16, 2014Completed
final sign-off Jan 2015
143 08th StBbc Construction Inc.tenant improvement ti include demolition of interior partitions and relocation of door/frame 1/2nd fl. n/a maher ordinance 155-13
Details
Permit
201410169065
Permit issued
Oct 17, 2014
Final sign-off
Jan 29, 2015

tenant improvement ti include demolition of interior partitions and relocation of door/frame 1/2nd fl. n/a maher ordinance 155-13

Open the permit page

Oct 10, 2014Completed
final sign-off Feb 2015
360 03rd StSc Builders, Inc4th flr, ste 400, t.i. includes the demo of non-structural partitions & building new non-structural paritions. all new or revised hvac, elec, plumbing & life safety, work will be design built & submitted separately, bldg is fully sprinklered; maher n/a
Details
Permit
201410108622
Permit issued
Oct 29, 2014
Final sign-off
Feb 13, 2015

4th flr, ste 400, t.i. includes the demo of non-structural partitions & building new non-structural paritions. all new or revised hvac, elec, plumbing & life safety, work will be design built & submitted separately, bldg is fully sprinklered; maher n/a

Open the permit page

$150,000
May 21, 2014Completed
final sign-off Jan 2015
50 Fremont StHathaway Dinwiddie Co.22nd/23rd fl: demo only. demo of non structural partitions only. ti will follow with separate permit ab017
Details
Permit
201405216351
Permit issued
Jan 13, 2015
Final sign-off
Jan 26, 2015

22nd/23rd fl: demo only. demo of non structural partitions only. ti will follow with separate permit ab017

Open the permit page

$90,000
May 1, 2014Completed
final sign-off Jul 2014
185 Berry StSkyline Construction6th fl ti includes building new non structural partitions. all new or revised hvac, electrical, plumbing. life safety under separate permit. bldg not fully sprinklered. demo under 201404294421
Details
Permit
201405014637
Permit issued
May 2, 2014
Final sign-off
Jul 9, 2014

6th fl ti includes building new non structural partitions. all new or revised hvac, electrical, plumbing. life safety under separate permit. bldg not fully sprinklered. demo under 201404294421

Open the permit page

$948,145
Apr 29, 2014Completed
final sign-off Jun 2014
185 Berry StSkyline Construction6th fl: demo permit only. demolish non structural partitions. ti to be submitted separately. building is not is not fully sprinklered
Details
Permit
201404294421
Permit issued
Apr 30, 2014
Final sign-off
Jun 25, 2014

6th fl: demo permit only. demolish non structural partitions. ti to be submitted separately. building is not is not fully sprinklered

Open the permit page

$13,000
Apr 17, 2014Completed
final sign-off Jun 2014
1550 Bryant StD A Pope Inc#400 & #490- t.i. includes build out of a few full height non-structural partitions, doors/frames & glazing, all new or revised hvac, electrical, plumbing and life safety, work will be submitted seperately. bldg is fully sprinklered. n/a to ordinance #155-13.
Details
Permit
201404173490
Permit issued
Apr 24, 2014
Final sign-off
Jun 25, 2014

#400 & #490- t.i. includes build out of a few full height non-structural partitions, doors/frames & glazing, all new or revised hvac, electrical, plumbing and life safety, work will be submitted seperately. bldg is fully sprinklered. n/a to ordinance #155-13.

Open the permit page

$250,000
Mar 27, 2014Expired or cancelled
withdrawn Oct 2015
1455 Market St1st fl ti includes demo of non structural partitions, new non structural partitons. new or revised hvac, elec, plumbing and life safety will be design build and submitted separately. bldg fully sprinklered
Details
Permit
201403271812

1st fl ti includes demo of non structural partitions, new non structural partitons. new or revised hvac, elec, plumbing and life safety will be design build and submitted separately. bldg fully sprinklered

Open the permit page

$20,000
Feb 28, 2014Completed
final sign-off Aug 2015
1550 Bryant StD A Pope Inc8th floor t.i. includes building new non-structural partitions, new raised floor area & kitchen. (all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted for permit separately). building fully sprinklered, demo included.
Details
Permit
201402289570
Permit issued
Jun 26, 2014
Final sign-off
Aug 14, 2015

8th floor t.i. includes building new non-structural partitions, new raised floor area & kitchen. (all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted for permit separately). building fully sprinklered, demo included.

Open the permit page

$750,000
Feb 21, 2014Completed
final sign-off May 2016
3435 Mission StPaniagua Construction Incchange of use and 1st 7 mezz level t.i. t.i. includes demo of non str. partitions and bldg new non st. partitions mech and elect included. includes new kitchen
Details
Permit
201402219038
Permit issued
Nov 17, 2014
Final sign-off
May 26, 2016

change of use and 1st 7 mezz level t.i. t.i. includes demo of non str. partitions and bldg new non st. partitions mech and elect included. includes new kitchen

Open the permit page

$88,000
Feb 6, 2014Never finaled
issued Mar 2014, no final
1145 Market StSwinerton Builders2/f t.i. include demo of non-structural partitions and building new non-structural partitions. all new or revised hvac, electrical, plumbing and life safety . building is fully sprinklered but submitted separately.shelving and anchorage to be under separate permit.
Details
Permit
201402067927
Permit issued
Mar 24, 2014

2/f t.i. include demo of non-structural partitions and building new non-structural partitions. all new or revised hvac, electrical, plumbing and life safety . building is fully sprinklered but submitted separately.shelving and anchorage to be under separate permit.

Open the permit page

$83,265
Feb 3, 2014Completed
final sign-off Apr 2014
1550 Bryant StD A Pope Inc8th floor: interior demo only. ab-017 will remain unoccupied until t. i. permit is approved. n/a for maher ordinance #155-13
Details
Permit
201402037592
Permit issued
Feb 3, 2014
Final sign-off
Apr 11, 2014

8th floor: interior demo only. ab-017 will remain unoccupied until t. i. permit is approved. n/a for maher ordinance #155-13

Open the permit page

$11,000
Jan 28, 2014Completed
final sign-off Jun 2014
601 California StSwinerton Builders10th floor t.i. includes demo of non-structural partitoins & build (n) non-structural prtitions, all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted separately.
Details
Permit
201401287233
Permit issued
Feb 20, 2014
Final sign-off
Jun 3, 2014

10th floor t.i. includes demo of non-structural partitoins & build (n) non-structural prtitions, all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted separately.

Open the permit page

$375,000
Jan 24, 2014Completed
final sign-off Oct 2014
600 Montgomery StField Construction Inc.12th & 13th floor t.i. includes the demo of non-structural pratitions & new non-structural partitions. improvements include re-work of (e) mech & electrical equipment & fixtures within the tenant space. bldg is fully sprinklered.
Details
Permit
201401246985
Permit issued
Feb 12, 2014
Final sign-off
Oct 8, 2014

12th & 13th floor t.i. includes the demo of non-structural pratitions & new non-structural partitions. improvements include re-work of (e) mech & electrical equipment & fixtures within the tenant space. bldg is fully sprinklered.

Open the permit page

$949,815
Jan 13, 2014Completed
final sign-off Feb 2016
55 02nd StHathaway Dinwiddie Co.12th & 14th flr t.i. includes (n) offices, open office areas, break area, meeting room etc. (n) elevator lobby upgrade, restrm upgrades, replace stair. all mech,elec,plbg,struct under separate permits. (demo under 2013.1211.3864). compliance with ordinance #155-13 not required. excavation <50 cu yd.
Details
Permit
201401136092
Permit issued
Jan 27, 2014
Final sign-off
Feb 23, 2016

12th & 14th flr t.i. includes (n) offices, open office areas, break area, meeting room etc. (n) elevator lobby upgrade, restrm upgrades, replace stair. all mech,elec,plbg,struct under separate permits. (demo under 2013.1211.3864). compliance with ordinance #155-13 not required. excavation <50 cu yd.

Open the permit page

$1,200,000
Dec 23, 2013Completed
final sign-off Jul 2014
303 02nd StBcci Construction Companyste 680: ti includes semo of non structural partitoins (suiete a to include building new non structural partitions) suite b to remain unoccupied. ti separate permit. all new revised hvac, elec, plumbinf, l/s design build sep permit.
Details
Permit
201312234841
Permit issued
Jan 3, 2014
Final sign-off
Jul 10, 2014

ste 680: ti includes semo of non structural partitoins (suiete a to include building new non structural partitions) suite b to remain unoccupied. ti separate permit. all new revised hvac, elec, plumbinf, l/s design build sep permit.

Open the permit page

$202,850
Dec 23, 2013Completed
final sign-off Sep 2014
115 Sansome StField Construction Inc.12th fl ti including demo of non structural paritons and building new non structural partitions. all new or revised hvac, electriclal, plumbing, and life safety work will be design, build and submitted for permit separately. building is fully sprinklered
Details
Permit
201312234835
Permit issued
May 28, 2014
Final sign-off
Sep 2, 2014

12th fl ti including demo of non structural paritons and building new non structural partitions. all new or revised hvac, electriclal, plumbing, and life safety work will be design, build and submitted for permit separately. building is fully sprinklered

Open the permit page

$438,000
Dec 16, 2013Never finaled
issued Jan 2014, no final
1145 Market StSwinerton Builders1st and 3rd fl ti. demo of non structural partitons, new non structural partitons. new or revised hvac electrical, plumbing, life safety fully engineered and submitted separately . bldg is fully sprinklered
Details
Permit
201312164261
Permit issued
Jan 15, 2014

1st and 3rd fl ti. demo of non structural partitons, new non structural partitons. new or revised hvac electrical, plumbing, life safety fully engineered and submitted separately . bldg is fully sprinklered

Open the permit page

$493,290
Dec 13, 2013Completed
final sign-off Feb 2014
221 Main StRossi Builders Inc.16th floor. revision to pa#2013-1007-8703. mechanic & electrical/lighting. replacing lights and replacing vav boxes
Details
Permit
201312134150
Permit issued
Jan 3, 2014
Final sign-off
Feb 24, 2014

16th floor. revision to pa#2013-1007-8703. mechanic & electrical/lighting. replacing lights and replacing vav boxes

Open the permit page

Dec 11, 2013Completed
final sign-off Feb 2016
55 02nd StHathaway Dinwiddie Co.(12 & 14th floor). demo only of applied finishes. non-structural partitions, hvac, electrical, plumbing and life safety equipment on two floors. t.i under separate permit. bldg is fully sprinklered. per ab-017
Details
Permit
201312113864
Permit issued
Dec 20, 2013
Final sign-off
Feb 23, 2016

(12 & 14th floor). demo only of applied finishes. non-structural partitions, hvac, electrical, plumbing and life safety equipment on two floors. t.i under separate permit. bldg is fully sprinklered. per ab-017

Open the permit page

$190,000
Nov 22, 2013Completed
final sign-off Apr 2015
115 Sansome StField Construction Inc.3/f- t.i. includes the demo of non-structural partitions and building new non-structural partitions. all new or revised meps, life safety work will be design build and submitted seperately.
Details
Permit
201311222601
Permit issued
Dec 9, 2013
Final sign-off
Apr 30, 2015

3/f- t.i. includes the demo of non-structural partitions and building new non-structural partitions. all new or revised meps, life safety work will be design build and submitted seperately.

Open the permit page

$375,000
Nov 13, 2013Never finaled
issued Nov 2013, no final
1245 04th StD Kelly Construction Inc.revision to 201309096307. patch membrane from drain addition. add new floor drain
Details
Permit
201311131775
Permit issued
Nov 13, 2013

revision to 201309096307. patch membrane from drain addition. add new floor drain

Open the permit page

Nov 8, 2013Never finaled
issued Nov 2013, no final
550 Kearny StSkyline Construction10th floor tenant improvement to include the additoin of a glass door & sidelite to an existing room. mep & life safety under separate permit.
Details
Permit
201311081520
Permit issued
Nov 12, 2013

10th floor tenant improvement to include the additoin of a glass door & sidelite to an existing room. mep & life safety under separate permit.

Open the permit page

$7,000
Nov 5, 2013Completed
final sign-off Feb 2014
1550 Bryant StD A Pope Inc7/f- removal of section of partition and interior glazing at existing elevator lobby, if applicable, all new or modified hvac, electrical and life safety work will be design build and submitted seperately
Details
Permit
201311051159
Permit issued
Jan 28, 2014
Final sign-off
Feb 4, 2014

7/f- removal of section of partition and interior glazing at existing elevator lobby, if applicable, all new or modified hvac, electrical and life safety work will be design build and submitted seperately

Open the permit page

$5,000
Oct 24, 2013Completed
final sign-off Jan 2014
115 Sansome StField Construction Inc.9th fl. ti includes demo of non structural partitions and building new. non structural paritions. all new or revised hvac, elec, plumbing and life safety. work be design build and submitted separtely
Details
Permit
201310240086
Permit issued
Nov 12, 2013
Final sign-off
Jan 17, 2014

9th fl. ti includes demo of non structural partitions and building new. non structural paritions. all new or revised hvac, elec, plumbing and life safety. work be design build and submitted separtely

Open the permit page

$375,000
Oct 18, 2013Completed
final sign-off Jan 2014
2 Embarcadero CenterHathaway Dinwiddie Co.6th fl ti includes demo of non structural partitions, new non structural partitoins. new or revised hvac, elec, plumbing, life safety design build sep permit. bldg fully sprinklered
Details
Permit
201310189635
Permit issued
Oct 22, 2013
Final sign-off
Jan 17, 2014

6th fl ti includes demo of non structural partitions, new non structural partitoins. new or revised hvac, elec, plumbing, life safety design build sep permit. bldg fully sprinklered

Open the permit page

$100,000
Oct 7, 2013Completed
final sign-off Jun 2015
250 Brannan StHathaway Dinwiddie Co.(roof) roof work; 2 air handling units, 2 new exhaust fans, 2 new condensing units. 2 new tef. new refrigerent riser pipes from below. all mech. t-24 are being shared by the meps of pa# 2013/08/14/4246. please use structural calcs. mech t-24 for roof project portion only.
Details
Permit
201310078706
Permit issued
May 14, 2014
Final sign-off
Jun 10, 2015

(roof) roof work; 2 air handling units, 2 new exhaust fans, 2 new condensing units. 2 new tef. new refrigerent riser pipes from below. all mech. t-24 are being shared by the meps of pa# 2013/08/14/4246. please use structural calcs. mech t-24 for roof project portion only.

Open the permit page

$50,000
Oct 7, 2013Completed
final sign-off Feb 2014
221 Main StRossi Builders Inc.16th fl. ti includes demo of non structural partitons and building new non structural partitions. new or revised hvac and electrical will be included in this permit. life safety and sprinklers and sprinklers will be submitted
Details
Permit
201310078703
Permit issued
Nov 19, 2013
Final sign-off
Feb 24, 2014

16th fl. ti includes demo of non structural partitons and building new non structural partitions. new or revised hvac and electrical will be included in this permit. life safety and sprinklers and sprinklers will be submitted

Open the permit page

$180,000
Sep 26, 2013Completed
final sign-off Dec 2013
201 Post StSc Builders, Incthe demo of non-structural partitions under ab0.17. mep and life safety under seperate permit. 11th floor
Details
Permit
201309267809
Permit issued
Sep 26, 2013
Final sign-off
Dec 23, 2013

the demo of non-structural partitions under ab0.17. mep and life safety under seperate permit. 11th floor

Open the permit page

$30,000
Sep 19, 2013Completed
final sign-off Apr 2014
185 Berry StSkyline Constructiontenant improvement on 4th floor to build ne non load bearing partitions, doors, millwork and finishes mep on separate permit
Details
Permit
201309197281
Permit issued
Oct 23, 2013
Final sign-off
Apr 4, 2014

tenant improvement on 4th floor to build ne non load bearing partitions, doors, millwork and finishes mep on separate permit

Open the permit page

$425,987
Aug 14, 2013Completed
final sign-off Jun 2015
250 Brannan StHathaway Dinwiddie Co.basement through 3rd floor. t.i. includes demo of non structural partitions and bldg n non structural partitons and showers. see mep engineering. plans for all new or revised hvac, electrical , plumbing, & life safety. bldg is fully sprinklered. structural plans for solar tube under mep submittal.
Details
Permit
201308144246
Permit issued
Sep 6, 2013
Final sign-off
Jun 10, 2015

basement through 3rd floor. t.i. includes demo of non structural partitions and bldg n non structural partitons and showers. see mep engineering. plans for all new or revised hvac, electrical , plumbing, & life safety. bldg is fully sprinklered. structural plans for solar tube under mep submittal.

Open the permit page

$1,345,393
Aug 14, 2013Completed
final sign-off Nov 2013
115 Sansome StField Construction Inc.14/f, 15/f- t.i. includes the demo of non-structural partitions and building (n) non structural partitions. all new or revised hvac, electrical, plumbing and life safety work will be design-build and submitted seperately, building fully sprinklered.
Details
Permit
201308144245
Permit issued
Aug 28, 2013
Final sign-off
Nov 19, 2013

14/f, 15/f- t.i. includes the demo of non-structural partitions and building (n) non structural partitions. all new or revised hvac, electrical, plumbing and life safety work will be design-build and submitted seperately, building fully sprinklered.

Open the permit page

$423,000
Aug 12, 2013Never finaled
issued Sep 2013, no final
100 Spear StPeacock Construction Inc14th flr: tenant improvement include the demolishing of non structural partitions and building new non structural partitions. all new or revised. hvac, electrical, plumbing and life safety work will be design- build and submitted separately./ bldg fully sprinkled
Details
Permit
201308124029
Permit issued
Sep 12, 2013

14th flr: tenant improvement include the demolishing of non structural partitions and building new non structural partitions. all new or revised. hvac, electrical, plumbing and life safety work will be design- build and submitted separately./ bldg fully sprinkled

Open the permit page

$90,000
Aug 12, 2013Completed
final sign-off Mar 2014
100 Spear StPeacock Construction Inc4th floor elevator lobby & corridor improvements include finishes, all new or revised hvac, electrical, plbg & life safety work will be design build & sumbitted separately, bldg fully sprinklered.
Details
Permit
201308124031
Permit issued
Sep 12, 2013
Final sign-off
Mar 28, 2014

4th floor elevator lobby & corridor improvements include finishes, all new or revised hvac, electrical, plbg & life safety work will be design build & sumbitted separately, bldg fully sprinklered.

Open the permit page

$90,000
Aug 12, 2013Never finaled
issued Sep 2013, no final
100 Spear StPeacock Construction Incground floor suite 120 & 130 t.i. include the demolishing of non-structural partitions & building new non-structural partitions. all new or revised hvac, electrical, pldg & life safety will be design build & submitted separately. bldg fully sprinklered.
Details
Permit
201308124030
Permit issued
Sep 12, 2013

ground floor suite 120 & 130 t.i. include the demolishing of non-structural partitions & building new non-structural partitions. all new or revised hvac, electrical, pldg & life safety will be design build & submitted separately. bldg fully sprinklered.

Open the permit page

$100,000
Aug 12, 2013Completed
final sign-off Mar 2014
100 Spear StPeacock Construction Inc2/f- t.i. include demolishing of non structural partitions and build (n) non structural partitions. all new or revised hvac, electrical, plumbing and life safety are design build submitted seperately, fully sprinkler.
Details
Permit
201308124024
Permit issued
Sep 12, 2013
Final sign-off
Mar 28, 2014

2/f- t.i. include demolishing of non structural partitions and build (n) non structural partitions. all new or revised hvac, electrical, plumbing and life safety are design build submitted seperately, fully sprinkler.

Open the permit page

$275,000
Aug 12, 2013Never finaled
issued Sep 2013, no final
100 Spear StPeacock Construction Inc3rd flr: ste 325, tenant improvement include the demolishing of non structural partitions and building new non structural partitions. all new or revised. hvac, electrical, plumbing and life safety work will be design- build and submitted separately./ bldg fully sprinkled
Details
Permit
201308124023
Permit issued
Sep 12, 2013

3rd flr: ste 325, tenant improvement include the demolishing of non structural partitions and building new non structural partitions. all new or revised. hvac, electrical, plumbing and life safety work will be design- build and submitted separately./ bldg fully sprinkled

Open the permit page

$215,000