Marcus Oden
- License
- C60586
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C60586 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Dirtt
- Based in
- San Jose
- On San Francisco permits
- Aug 2017 to Jul 2026
4 permits since 2000 (engineer on 4 permits): 3 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Rudolph And Sletten Inc (2), Devcon Construction, Marchetti Group
- Architects
- John Ashworth, Melissa Pesci
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 1, 2026 | In progress issued Jul 2026 | 449 Avenue H | Devcon Construction | deferred mep seismic bracing. ref permit 202509034495.Details
deferred mep seismic bracing. ref permit 202509034495. | |
| Oct 26, 2018 | Completed final sign-off Apr 2019 | 1100 Van Ness Av | Rudolph And Sletten Inc | 2nd/3rd fl: revision to pa #201710201778. original drawings called out oshpd 1 level anchorage is being changed to oshpd 3 level standards; corine "stud" details added for areas where kickers can't reack the deck above.Details
2nd/3rd fl: revision to pa #201710201778. original drawings called out oshpd 1 level anchorage is being changed to oshpd 3 level standards; corine "stud" details added for areas where kickers can't reack the deck above. | |
| Nov 9, 2017 | Completed final sign-off Apr 2018 | 560 Davis St | Marchetti Group | ground floor commercial tenant improvement on a single floor work includes new partitions, finishes, casework, electrical & plumbing. n/a maher ordinance. no exterior work. maher n/aDetails
ground floor commercial tenant improvement on a single floor work includes new partitions, finishes, casework, electrical & plumbing. n/a maher ordinance. no exterior work. maher n/a | $65,000 |
| Aug 17, 2017 | Completed final sign-off Apr 2019 | 1100 Van Ness Av | Rudolph And Sletten Inc | 4/f- t. i. to a medical office building for clinic outpatient, 1st time build out, single floor t.i., meps. life safety and sprinklers under seperate permit. n/a maher ordinance #155-13Details
4/f- t. i. to a medical office building for clinic outpatient, 1st time build out, single floor t.i., meps. life safety and sprinklers under seperate permit. n/a maher ordinance #155-13 | $4,854,717 |