Block 8711, lot 028
1245 04th St
- City’s use
- Multi-Family Residential
- Built
- 2009
- Stories
- 8
- Units
- 193
- Rooms
- 254 bedrooms, 192 bathrooms
- Building
- 245,618 sq ft
- Lot
- 65,340 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
80 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 21, 2024 | In progress issued Nov 2024 | 1245 04th St | San Francisco Fire Protection | as built. install new fire alarm system in 1245 4th st to tie in to existing system at 555 mission rock. remove aes radio and monitor modules because existing main system has existing monitoring service. ref 202302131874, ref 202409130717 facuDetails
as built. install new fire alarm system in 1245 4th st to tie in to existing system at 555 mission rock. remove aes radio and monitor modules because existing main system has existing monitoring service. ref 202302131874, ref 202409130717 facu | |
| Sep 13, 2024 | Completed final sign-off Mar 2025 | 1245 04th St | San Francisco Fire Protection | install new fire alarm system in 1245 4th st to tie into an (e) system at 855 mission rock. install new facu, aes com, amp, smoke detectors, manual pulls, monitor modules, speak strobes, and strobes. install relay modules to backup to (e) main system when the main system goes into non-normal conditiDetails
install new fire alarm system in 1245 4th st to tie into an (e) system at 855 mission rock. install new facu, aes com, amp, smoke detectors, manual pulls, monitor modules, speak strobes, and strobes. install relay modules to backup to (e) main system when the main system goes into non-normal conditi | $5,000 |
| Jul 11, 2024 | In progress filed Jul 2024, not yet issued | 1245 04th St | Commercial Fire Protection Llc | modify existing fire alarm system as requested for new construction (t.i) in dahlia school. ref permit 202306129890Details
modify existing fire alarm system as requested for new construction (t.i) in dahlia school. ref permit 202306129890 | $4,000 |
| May 24, 2024 | Completed final sign-off Jun 2024 | 1245 04th St | Firemex Solutions Inc. | ref pa# 2023-0213-1874 add 4 sprinkler heads to new childrens restroomDetails
ref pa# 2023-0213-1874 add 4 sprinkler heads to new childrens restroom | $6,300 |
| Jun 12, 2023 | Completed final sign-off May 2025 | 1245 04th St | Onsite Construx | deferred mep for permit 202302131874Details
deferred mep for permit 202302131874 | $187,488 |
| Feb 13, 2023 | Completed final sign-off May 2025 | 1245 04th St | Onsite Construx | tenant improvement. adding children's restroom and kitchenette. establishing e occupancy in vacant retail suite. mep deferred.Details
tenant improvement. adding children's restroom and kitchenette. establishing e occupancy in vacant retail suite. mep deferred. | $180,000 |
| Sep 14, 2022 | Completed final sign-off Oct 2022 | 1215 04th St | Pribuss Engineering Inc | modify sprinkler head (total 10 sprinklers) locations to accommodate new cleiling & partition layout for new cookie store on 1st fl. ref 2021 1201 3476.Details
modify sprinkler head (total 10 sprinklers) locations to accommodate new cleiling & partition layout for new cookie store on 1st fl. ref 2021 1201 3476. | $5,140 |
| Aug 12, 2022 | Completed final sign-off Sep 2022 | 1215 04th St | Commercial Fire Protection Llc | extend extg fire alarm system into the extg space and configure the fire alarm system to provide notification devices as well as shut down for music. working on a restruarnt.Details
extend extg fire alarm system into the extg space and configure the fire alarm system to provide notification devices as well as shut down for music. working on a restruarnt. | $8,000 |
| Mar 16, 2022 | Never finaled issued Mar 2022, no final | 1215 04th St | Insign Electric | install 1 illuminated wall sign, single faced.Details
install 1 illuminated wall sign, single faced. | $6,000 |
| Feb 24, 2022 | Completed final sign-off Aug 2022 | 1215 04th St | Saarman Construction,Ltd. | 1st floor: installation of new transformer and replace of rough plumbing connections at extg concrete slabDetails
1st floor: installation of new transformer and replace of rough plumbing connections at extg concrete slab | $25,000 |
| Dec 1, 2021 | Completed final sign-off Nov 2022 | 1215 04th St | Horizon Retail Construction Inc | 1st flr - 1st time tenant, cfc req, new food service, tenant finish out from extg space. extg storefront and entry door to remian. minor store front modification for new louvers.Details
1st flr - 1st time tenant, cfc req, new food service, tenant finish out from extg space. extg storefront and entry door to remian. minor store front modification for new louvers. | $186,000 |
| Sep 10, 2021 | Completed final sign-off Aug 2022 | 1201 04th St | Acco Engineered Systems Inc. Dba Acco En | direct replacement of 2 existing rooftop non condensing boilers with 2 new condensing boilersDetails
direct replacement of 2 existing rooftop non condensing boilers with 2 new condensing boilers | $100,000 |
| Aug 13, 2021 | Expired or cancelled cancelled Jan 2026 | 1201 04th St | Saarman Construction,Ltd. | destructive testing at select balconies per wiss, jonney, elstner assoc. work to include opening sections of bacony deckslabs of units 514, 520, 522, 524, & 538 in order to observe waterproofing conditions. perform repairs like for like (repair spalling and cracking) repair to be under sep. permit.Details
destructive testing at select balconies per wiss, jonney, elstner assoc. work to include opening sections of bacony deckslabs of units 514, 520, 522, 524, & 538 in order to observe waterproofing conditions. perform repairs like for like (repair spalling and cracking) repair to be under sep. permit. | $18,313 |
| Oct 3, 2020 | Completed final sign-off Sep 2021 | 1201 04th St | Saarman Construction,Ltd. | rev to pa201805240066: new canopy at residential entry door from city sidewalk.Details
rev to pa201805240066: new canopy at residential entry door from city sidewalk. | $60,000 |
| Jul 16, 2020 | Never finaled issued Aug 2020, no final | 1201 04th St | street spaceDetails
street space | ||
| Feb 5, 2020 | Never finaled issued Feb 2020, no final | 1285 04th St | Custom Contracting Services | vinyl signage one medicalDetails
vinyl signage one medical | $500 |
| Jan 30, 2020 | Never finaled issued Feb 2020, no final | 1285 04th St | Custom Contracting Services | install "channel letter of (e) canopy one medical"Details
install "channel letter of (e) canopy one medical" | $1,500 |
| Jan 30, 2020 | Never finaled issued Feb 2020, no final | 1285 04th St | Custom Contracting Services | install "channel letter of (e) canopy one medical"Details
install "channel letter of (e) canopy one medical" | $1,500 |
| Jan 16, 2020 | Never finaled issued Jan 2020, no final | 1201 04th St | street space and mtaDetails
street space and mta | ||
| Dec 2, 2019 | Never finaled issued Jan 2020, no final | 1201 04th St | Maguire Inc Dba Lahue And Associates | install wall sign for "one medical"Details
install wall sign for "one medical" | |
| Nov 13, 2019 | Completed final sign-off Mar 2020 | 1201 04th St | Commercial Fire Protection Inc | fire alarm t.i. extg space is a commercial shell space. cfp will provide proper fire alarm coverage per code. installation of 1 power supply and 16 new notification devices.Details
fire alarm t.i. extg space is a commercial shell space. cfp will provide proper fire alarm coverage per code. installation of 1 power supply and 16 new notification devices. | $13,400 |
| Oct 31, 2019 | Never finaled issued Nov 2019, no final | 1201 04th St | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| Oct 31, 2019 | Never finaled issued Nov 2019, no final | 1201 04th St | street spaceDetails
street space | ||
| Oct 31, 2019 | Never finaled issued Nov 2019, no final | 1201 04th St | street space and sidewalk repairDetails
street space and sidewalk repair | ||
| Sep 5, 2019 | Completed final sign-off Feb 2020 | 1275 04th St | Golden Gate Fire Protection Inc | fire sprinklers: relocate 39 pendents on the ground fl. ref ti #201905130399.Details
fire sprinklers: relocate 39 pendents on the ground fl. ref ti #201905130399. | $20,475 |
| May 13, 2019 | Completed final sign-off Jul 2020 | 1275 04th St | Novo Construction Inc | ti of 1st fl medical office: non structural partitons, ceilings, casework, casework finishes, mep work. exterior signage for ref only. exterior signage will be under sep permit, maher n/a.Details
ti of 1st fl medical office: non structural partitons, ceilings, casework, casework finishes, mep work. exterior signage for ref only. exterior signage will be under sep permit, maher n/a. | $495,000 |
| May 6, 2019 | Never finaled issued May 2019, no final | 1201 04th St | street spaceDetails
street space | ||
| Apr 26, 2019 | Never finaled issued Apr 2019, no final | 1201 04th St | sidedwlk repairDetails
sidedwlk repair | ||
| Feb 4, 2019 | Completed final sign-off Aug 2021 | 1201 04th St | Saarman Construction,Ltd. | extg leasing office to have unisex restroom ada upgrade with finish/fixture. residential lobby finishes and lighting upgrades for all spaces 1/fl, 2/fl residental & 3/fl common area.Details
extg leasing office to have unisex restroom ada upgrade with finish/fixture. residential lobby finishes and lighting upgrades for all spaces 1/fl, 2/fl residental & 3/fl common area. | $180,000 |
| Dec 24, 2018 | Never finaled issued Dec 2018, no final | 1201 04th St | street spaceDetails
street space | ||
| Dec 20, 2018 | Never finaled issued Jul 2019, no final | 1201 04th St | street space & sidewalk repair w/mtaDetails
street space & sidewalk repair w/mta | ||
| May 24, 2018 | Completed final sign-off Oct 2020 | 1235 04th St | Saarman Construction,Ltd. | existing door encroaches onto public sidewalk - door to be relocated within property line. new ti per bpa #201612215592 & 201612064259.Details
existing door encroaches onto public sidewalk - door to be relocated within property line. new ti per bpa #201612215592 & 201612064259. | $9,500 |
| May 24, 2018 | Completed final sign-off Oct 2020 | 1245 04th St | Saarman Construction,Ltd. | existing door encroaches onto public sidewalk - door to be relocated within property lineDetails
existing door encroaches onto public sidewalk - door to be relocated within property line | $9,500 |
| May 24, 2018 | Completed final sign-off Oct 2020 | 1215 04th St | Saarman Construction,Ltd. | entry door encroaches onto public sidewalk - door to be recessed inward within properly linesDetails
entry door encroaches onto public sidewalk - door to be recessed inward within properly lines | $9,500 |
| May 24, 2018 | Never finaled issued Dec 2018, no final | 1225 04th St | Saarman Construction,Ltd. | existing entry door encroaches onto public sidewalk. door to be recessed inward of the property lineDetails
existing entry door encroaches onto public sidewalk. door to be recessed inward of the property line | $9,500 |
| May 24, 2018 | Completed final sign-off Oct 2020 | 1275 04th St | Saarman Construction,Ltd. | existing door encroaches onto public sidewalk - door to be relocated within property lineDetails
existing door encroaches onto public sidewalk - door to be relocated within property line | $9,500 |
| May 24, 2018 | Completed final sign-off Oct 2020 | 1201 04th St | Saarman Construction,Ltd. | commercial unit street entry door to be recessed inward (few inches) the existing door encroaces in public sidewalkDetails
commercial unit street entry door to be recessed inward (few inches) the existing door encroaces in public sidewalk | $9,500 |
| May 23, 2018 | Completed final sign-off Aug 2018 | 1225 04th St | Siemens Industry, Inc. | fire alarm work for the "ups store" on floor 1; additions are 2 horn/strobes and 2 strobes. ref pa 201801047872Details
fire alarm work for the "ups store" on floor 1; additions are 2 horn/strobes and 2 strobes. ref pa 201801047872 | $2,400 |
| Mar 16, 2018 | Never finaled issued Aug 2018, no final | 1225 04th St | Excel Signs | install illuminated channel letters for a ups store.Details
install illuminated channel letters for a ups store. | $2,200 |
| Feb 14, 2018 | Completed final sign-off Apr 2018 | 1225 04th St | United Fire Sprinklers Inc | fire sprinkler install at existing retail. it will be for ups store. ref #201801047872.Details
fire sprinkler install at existing retail. it will be for ups store. ref #201801047872. | $5,500 |
| Jan 4, 2018 | Never finaled issued Jan 2018, no final | 1225 04th St | Corinthian Contractors | 1st time tenant improvement - ups store - all interior work- new cabientry & finishes, new mech, elect work, ada restroom to be completed, new ceiling, new attic storage.Details
1st time tenant improvement - ups store - all interior work- new cabientry & finishes, new mech, elect work, ada restroom to be completed, new ceiling, new attic storage. | $50,000 |
| Jul 17, 2017 | Never finaled issued Jul 2017, no final | 1235 04th St | D Kelly Construction Inc. | temporary entry walkway on existing city sidewalk. wood sloping pathway to create accessible entry to existing entry (city sidewalk has sunk/lowered at elevation, damaged)Details
temporary entry walkway on existing city sidewalk. wood sloping pathway to create accessible entry to existing entry (city sidewalk has sunk/lowered at elevation, damaged) | $4,000 |
| Jun 5, 2017 | Completed final sign-off Aug 2017 | 1235 04th St | Siemens Industry, Inc. | 1st flr: fire alarm work for "the pond ups" - add 1 duct detector, 1 horn/strobe, 5 strobes ref#201612215592Details
1st flr: fire alarm work for "the pond ups" - add 1 duct detector, 1 horn/strobe, 5 strobes ref#201612215592 | $3,670 |
| May 9, 2017 | Completed final sign-off Jun 2017 | 1235 04th St | Potter Fire Protection | 1st floor - add (5) fire sprinklers from existing plugged outlets. t.i. pa#201612215592Details
1st floor - add (5) fire sprinklers from existing plugged outlets. t.i. pa#201612215592 | $2,560 |
| May 9, 2017 | Completed final sign-off Jun 2017 | 1225 04th St | Potter Fire Protection | 1st floor - add (1) upright sprinkler from existing plug. t.i. pa#201702230002Details
1st floor - add (1) upright sprinkler from existing plug. t.i. pa#201702230002 | $1,280 |
| Apr 18, 2017 | Completed final sign-off Jul 2017 | 1201 04th St | Siemens Industry, Inc. | fire alarm work to add 2 strobe power supplies on floor 1 for future remodel work. no notification devices are being installed under this permitDetails
fire alarm work to add 2 strobe power supplies on floor 1 for future remodel work. no notification devices are being installed under this permit | $4,080 |
| Mar 17, 2017 | Never finaled issued Mar 2017, no final | 1235 04th St | street spaceDetails
street space | ||
| Mar 17, 2017 | Completed final sign-off Apr 2017 | 1201 04th St | Saarman Construction,Ltd. | work in unit 801: replace sliding door to patio in-kind. aluminum. not visible from street.Details
work in unit 801: replace sliding door to patio in-kind. aluminum. not visible from street. | $10,000 |
| Feb 23, 2017 | Never finaled issued Apr 2017, no final | 1225 04th St | D Kelly Construction Inc. | new fully accesable toilet room, new rear exit door, new mechanical heating and cooling system electrical service to space and panel for commercial space.Details
new fully accesable toilet room, new rear exit door, new mechanical heating and cooling system electrical service to space and panel for commercial space. | $39,500 |
| Feb 7, 2017 | Never finaled issued Feb 2017, no final | 1225 04th St | per pa #200607247440, add address for commercial unit on g/f block 8711, lot 028 as; 1225 4th streetDetails
per pa #200607247440, add address for commercial unit on g/f block 8711, lot 028 as; 1225 4th street | ||
| Dec 21, 2016 | Never finaled issued Jan 2017, no final | 1235 04th St | D Kelly Construction Inc. | ground floor: ti- new partitions, ceiling, lighting, power mechanical & plumbing. new finishes on walls and floorDetails
ground floor: ti- new partitions, ceiling, lighting, power mechanical & plumbing. new finishes on walls and floor | $32,000 |
| Dec 6, 2016 | Expired or cancelled cancelled Feb 2020 | 1235 04th St | D Kelly Construction Inc. | commercial space-base building upgrade, mechanical, elelctrical, plumbing architecture, new accessible toilet room: tenent improvement under superate permit application.Details
commercial space-base building upgrade, mechanical, elelctrical, plumbing architecture, new accessible toilet room: tenent improvement under superate permit application. | $39,550 |
| Jun 2, 2016 | Never finaled issued Aug 2016, no final | 1201 04th St | Elro Manufacturing Company | erect illum wall signDetails
erect illum wall sign | $8,711 |
| Nov 2, 2015 | Never finaled issued Nov 2015, no final | 555 Mission Rock St | street space permitDetails
street space permit | ||
| Sep 28, 2015 | Never finaled issued Sep 2015, no final | 555 Mission Rock St | street spaceDetails
street space | ||
| Mar 5, 2015 | Never finaled issued Mar 2015, no final | 555 Mission Rock St | street space permitDetails
street space permit | ||
| Nov 5, 2014 | Completed final sign-off Sep 2015 | 555 Mission Rock St | Nibbi Bros Inc. | repair/replacement of most existing exterior materials along the west elevation of the building as well as select nearby portions of the north & south elevations.these areas were exposed to heat and damaged on 3-11-14 during a fire at under construction mega blocks 360 apartments (mb360) project; toDetails
repair/replacement of most existing exterior materials along the west elevation of the building as well as select nearby portions of the north & south elevations.these areas were exposed to heat and damaged on 3-11-14 during a fire at under construction mega blocks 360 apartments (mb360) project; to | $6,520,000 |
| Jul 11, 2014 | Completed final sign-off Sep 2015 | 555 Mission Rock St | Nibbi Bros Inc. | demolition of most extg exterior finishes materials along west elevation as well as select portions of north and south elevations of bldg due to damages from a fire at the under contruction project located across 4th street. replacement in-kind under separate permit.Details
demolition of most extg exterior finishes materials along west elevation as well as select portions of north and south elevations of bldg due to damages from a fire at the under contruction project located across 4th street. replacement in-kind under separate permit. | $50,000 |
| May 12, 2014 | Never finaled issued May 2014, no final | 555 Mission Rock St | street spaceDetails
street space | ||
| Mar 17, 2014 | Completed final sign-off Sep 2015 | 1201 04th St | Interstate Restoration California Lp | to comply w/ nov#201457831. demo building inside stairways, 326,423,526,525,523,522,521,519,517,516,617,614,615,619,621,624,709,21,19,17,15,3,6,7,9,11,5,623,427,425,417,315,316,317,323,325 & 8. drywall and doors. total of 37 units.Details
to comply w/ nov#201457831. demo building inside stairways, 326,423,526,525,523,522,521,519,517,516,617,614,615,619,621,624,709,21,19,17,15,3,6,7,9,11,5,623,427,425,417,315,316,317,323,325 & 8. drywall and doors. total of 37 units. | $10,000 |
| Jan 2, 2014 | Never finaled issued Jan 2014, no final | 1245 04th St | street space permitDetails
street space permit | ||
| Nov 26, 2013 | Never finaled issued Nov 2013, no final | 1245 04th St | Hawk Mechanical Inc | unit c: install two new fan coils & condensers with new grilles, new thermostats, refrigerant piping & duct work, install bath exhaust fan with duct & exhaust louver, instlal outside air duct from new outside air louver to two fan coil return plenums.Details
unit c: install two new fan coils & condensers with new grilles, new thermostats, refrigerant piping & duct work, install bath exhaust fan with duct & exhaust louver, instlal outside air duct from new outside air louver to two fan coil return plenums. | $42,000 |
| Nov 25, 2013 | Never finaled issued Nov 2013, no final | 1245 04th St | Golden Gate Fire Protection Inc | relocate 1 pendent sprinkler and add 1 head. ti 201309096307Details
relocate 1 pendent sprinkler and add 1 head. ti 201309096307 | $1,030 |
| Nov 13, 2013 | Never finaled issued Nov 2013, no final | 1245 04th St | D Kelly Construction Inc. | revision to 201309096307. patch membrane from drain addition. add new floor drainDetails
revision to 201309096307. patch membrane from drain addition. add new floor drain | |
| Nov 12, 2013 | Never finaled issued Nov 2013, no final | 1201 04th St | Commercial Fire Protection Inc | unit c: replace fire alarm devices with fire alarm devices acceptable for persons with hearing disability; (1) multi-candela strobe; (2) multi-candela horn strobe.Details
unit c: replace fire alarm devices with fire alarm devices acceptable for persons with hearing disability; (1) multi-candela strobe; (2) multi-candela horn strobe. | $1,000 |
| Oct 23, 2013 | Never finaled issued Oct 2013, no final | 1245 04th St | street spaceDetails
street space | ||
| Sep 9, 2013 | Never finaled issued Sep 2013, no final | 1215 04th St | five new addres assigned to block 8711 lot 028 as: 1215,1235,1245,1265,1275 4th street.Details
five new addres assigned to block 8711 lot 028 as: 1215,1235,1245,1265,1275 4th street. | ||
| Sep 9, 2013 | Never finaled issued Sep 2013, no final | 1285 04th St | assigning new addres to block 8711, lot 028 as; 1285 4th street.Details
assigning new addres to block 8711, lot 028 as; 1285 4th street. | ||
| Sep 9, 2013 | Never finaled issued Oct 2013, no final | 1245 04th St | D Kelly Construction Inc. | ground floor unit c: t.i. first time build out, includes demo of one store front entry and build back non structural partitions. all new or revised hvac electrical, plmg, and life safety work will be design build and submitted seperately. bldg fully sprinklered.Details
ground floor unit c: t.i. first time build out, includes demo of one store front entry and build back non structural partitions. all new or revised hvac electrical, plmg, and life safety work will be design build and submitted seperately. bldg fully sprinklered. | $117,000 |
| Dec 17, 2009 | Completed final sign-off Jan 2010 | 1201 04th St | Cenco | work on hallway @ unit #109, #110, #101 on 1st floor - replace water damaged - sheetrock at bottom 12" of wall. replace 12" insulation , repalce baseboards, replace carpet & paint. no electrical, no plumbing,Details
work on hallway @ unit #109, #110, #101 on 1st floor - replace water damaged - sheetrock at bottom 12" of wall. replace 12" insulation , repalce baseboards, replace carpet & paint. no electrical, no plumbing, | $35,000 |
| Aug 12, 2009 | Completed final sign-off Aug 2009 | 555 Mission Rock St | Nibbi Bros Construction | to obtain for final inspection for app#200610185373. all work is complete.Details
to obtain for final inspection for app#200610185373. all work is complete. | |
| Aug 12, 2009 | Completed final sign-off Aug 2009 | 555 Mission Rock St | Nibbi Bros Construction | to obtain for final inspection for app#200608028365. all work is complete.Details
to obtain for final inspection for app#200608028365. all work is complete. | |
| Aug 22, 2008 | Never finaled issued Aug 2008, no final | 1201 04th St | apply additional house number on 4th street for leasing officeDetails
apply additional house number on 4th street for leasing office | ||
| May 9, 2008 | Completed final sign-off Mar 2009 | 555 Mission Rock St | provide metal stairs and glass fiber reinforced,concrete (gfrc), detail, plans for deferred submittals to appl.200607247440s.Details
provide metal stairs and glass fiber reinforced,concrete (gfrc), detail, plans for deferred submittals to appl.200607247440s. | ||
| Dec 4, 2007 | Completed final sign-off Feb 2009 | 555 Mission Rock St | revision to approved pa#2006-0724-7440 s2 update post tension podium slab at level 3 design to increase slab clear cover to 1-1/4 to accommodate 4hr fire rateing requirement. replace steel beam with built up light gauge steel header at dining room. minor update to info in detail 11/s71, etc.Details
revision to approved pa#2006-0724-7440 s2 update post tension podium slab at level 3 design to increase slab clear cover to 1-1/4 to accommodate 4hr fire rateing requirement. replace steel beam with built up light gauge steel header at dining room. minor update to info in detail 11/s71, etc. | ||
| Aug 15, 2007 | Completed final sign-off Feb 2009 | 555 Mission Rock St | Nibbi Bros Construction | erection, operation and dismantle of tower crane located on job site.Details
erection, operation and dismantle of tower crane located on job site. | $119,481 |
| Jan 23, 2007 | Completed final sign-off Feb 2009 | 555 Mission Rock St | grading per plan. (ref. to appl#200607247440).Details
grading per plan. (ref. to appl#200607247440). | $1,000 | |
| Oct 18, 2006 | Expired or cancelled expired Aug 2009 | 555 Mission Rock St | this revision is a clarification to indicate dimensional locations of the indicator piles.Details
this revision is a clarification to indicate dimensional locations of the indicator piles. | ||
| Aug 2, 2006 | Expired or cancelled expired Aug 2009 | 555 Mission Rock St | provide indicator pile per plan.Details
provide indicator pile per plan. | $200,000 | |
| Jul 24, 2006 | Completed final sign-off Jul 2009 | 555 Mission Rock St | to erect 192 dwelling units/storage/prking/retail (8 stories)Details
to erect 192 dwelling units/storage/prking/retail (8 stories) | $12,000,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.