Serena Jang
- Listed as
- authorized agent-others, engineer, pmt consultant/expediter
- Firm
- Langan Treadwell Rollo
- Based in
- San Francisco
- On San Francisco permits
- Jan 2006 to Jul 2017
16 permits since 2000 (authorized agent-others on 9 permits, pmt consultant/expediter on 4 permits, engineer on 3 permits): 13 completed, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 25, 2017 | Completed final sign-off Jun 2019 | 300 16th St | Mortenson Clark A Joint Venture | temp construction, erection and operation of tower crane #3. reference to building site permit application no. 201606149949 s.Details
temp construction, erection and operation of tower crane #3. reference to building site permit application no. 201606149949 s. | $100,000 |
| Jul 24, 2017 | Completed final sign-off Jun 2019 | 300 16th St | Mortenson Clark A Joint Venture | temp construction, erection and operation of tower crane #1. n/a ordinance #155-13. reference to building site permit application no. 201606149949 s.Details
temp construction, erection and operation of tower crane #1. n/a ordinance #155-13. reference to building site permit application no. 201606149949 s. | $100,000 |
| May 21, 2015 | Expired or cancelled withdrawn Mar 2016 | 1800 Owens St | Malcolm Drilling Co Inc | test program for design build stone colum ground improvement for new construction ref pa# 2014/09/04/5458's'. total of 32 test piles (16 in two locations).Details
test program for design build stone colum ground improvement for new construction ref pa# 2014/09/04/5458's'. total of 32 test piles (16 in two locations). | $90,000 |
| Mar 17, 2015 | Completed final sign-off Apr 2016 | 155 Hayes St | demolish (e) office building.Details
demolish (e) office building. | $10,000 | |
| Nov 10, 2014 | Completed final sign-off Dec 2015 | 2451 19th Av | Kmh Construction Company | revision to app#201304184893 including 1)remove a closet in ground floor level. 2) rearrange layout of bed room and kitchen in 2nd floor. 3)relocate side windows.Details
revision to app#201304184893 including 1)remove a closet in ground floor level. 2) rearrange layout of bed room and kitchen in 2nd floor. 3)relocate side windows. | |
| Sep 24, 2014 | Completed final sign-off Jul 2015 | 1172 Plymouth Av | add kitchen on (e) condition space on 1st floor & convert to 2nd unit.Details
add kitchen on (e) condition space on 1st floor & convert to 2nd unit. | $10,000 | |
| Jul 17, 2014 | Completed final sign-off Jul 2016 | 400 05th St | J & J South West Construction Inc | to remodel (e) gas station office/retail become auto repair shop. proposed (n) hc bathroom. service counter.Details
to remodel (e) gas station office/retail become auto repair shop. proposed (n) hc bathroom. service counter. | $20,000 |
| Jul 11, 2014 | Completed final sign-off Sep 2015 | 555 Mission Rock St | Nibbi Bros Inc. | demolition of most extg exterior finishes materials along west elevation as well as select portions of north and south elevations of bldg due to damages from a fire at the under contruction project located across 4th street. replacement in-kind under separate permit.Details
demolition of most extg exterior finishes materials along west elevation as well as select portions of north and south elevations of bldg due to damages from a fire at the under contruction project located across 4th street. replacement in-kind under separate permit. | $50,000 |
| Jul 8, 2014 | Completed final sign-off Sep 2014 | 1111 California St | Aspen Builders Inc. | remodel existing kitchen to include replacement of existing ceiling, installation of new kitchen fixtures and relocation of existing kitchen fixtures.Details
remodel existing kitchen to include replacement of existing ceiling, installation of new kitchen fixtures and relocation of existing kitchen fixtures. | $100,000 |
| Jun 16, 2014 | Completed final sign-off Aug 2017 | 2198 Market St | James E Roberts-Obayashi Corporation | temporary lateral support for adjacent new construction by means of soldier beam with tiebacks & wood lagging. shoring within muni / bart zone of influence along market street. ** maher: compliance with ordinance no# 155-13 applied. route to health **Details
temporary lateral support for adjacent new construction by means of soldier beam with tiebacks & wood lagging. shoring within muni / bart zone of influence along market street. ** maher: compliance with ordinance no# 155-13 applied. route to health ** | $250,000 |
| Jun 16, 2014 | Completed final sign-off Aug 2017 | 151 Sanchez St | James E Roberts-Obayashi Corporation | temporary lateral support for adjacent new construction by hand dug concrete piers, soldier beams, tiebacks & wood lagging. long term vertical support of (e) structure. shoring for 2198 market st under separate permit. ** maher: compliance with ordinance with no# 155-13 not required **Details
temporary lateral support for adjacent new construction by hand dug concrete piers, soldier beams, tiebacks & wood lagging. long term vertical support of (e) structure. shoring for 2198 market st under separate permit. ** maher: compliance with ordinance with no# 155-13 not required ** | $50,000 |
| Apr 17, 2014 | Completed final sign-off Feb 2015 | 1411 Market St | revision to pa#200903234623-s3-r3, revising (12) 2-bedroom units into (6) 3 bedroom units and (6) 1-bedroom units on floors 33-35 in the norht tower.Details
revision to pa#200903234623-s3-r3, revising (12) 2-bedroom units into (6) 3 bedroom units and (6) 1-bedroom units on floors 33-35 in the norht tower. | $30,000 | |
| Dec 16, 2013 | Never finaled issued Apr 2014, no final | 750 Kearny St | W. Wong Construction Co. Inc. | ground floor - demolish (e) spa area on ground floor. install (n) walls, ceilings, lighting and cabinetry. electrical, plumbing and sprinkler modifications will be performed under separate permits. ** maher: compliance with ordinance no# 155-13 not required **Details
ground floor - demolish (e) spa area on ground floor. install (n) walls, ceilings, lighting and cabinetry. electrical, plumbing and sprinkler modifications will be performed under separate permits. ** maher: compliance with ordinance no# 155-13 not required ** | $290,000 |
| Nov 12, 2013 | Completed final sign-off Feb 2016 | 101 Polk St | Superior Automatic Sprinkler | install fire sprinkler/sandpipe system throughout entire building per nfpa 13 and 24 with two new 6" fire services off of 8" main on polk st.. ref new building under architural and structural pa #201307051190. ** maher: compliance with ordinance no# 155-13 not required **Details
install fire sprinkler/sandpipe system throughout entire building per nfpa 13 and 24 with two new 6" fire services off of 8" main on polk st.. ref new building under architural and structural pa #201307051190. ** maher: compliance with ordinance no# 155-13 not required ** | $200,000 |
| Dec 22, 2006 | Expired or cancelled withdrawn May 2015 | 300 Grant Av | convert office to residential units. change in use to r-1 existing condutions/demolition floor plans to be submitted as revisions.Details
convert office to residential units. change in use to r-1 existing condutions/demolition floor plans to be submitted as revisions. | $5,000,000 | |
| Jan 24, 2006 | Completed final sign-off Mar 2006 | 750 Kearny St | install a 240 sq.ft. coffee kiosh in the lobby of an existing hotel lobbyDetails
install a 240 sq.ft. coffee kiosh in the lobby of an existing hotel lobby | $120,000 |