Mortenson Clark A Joint Venture

Contractor license
996476
State license record
Based in
Bethesda
On San Francisco permits
Jun 2016 to Aug 2020
Last 24 months
0 permits filed

58 permits since 2000: 47 completed, 7 never finaled, 4 expired or cancelled.

Of the 7 never-finaled permits, 7 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Aug 12, 2020Completed
final sign-off Oct 2020
300 16th Strevision to gsw aena #201908158948 & 201606149949s7 to include sffd approved local equivalencies1.sffd approved ab-005 for back up power for the arenascopeboard 2,sffd approved ab-005 for power shut down for portable av equiptment, no proposed equiptment or sequence changes to approved system
Details
Permit
202008121626
Status
complete
Filed
Aug 12, 2020
Permit issued
Aug 26, 2020
Final sign-off
Oct 15, 2020
Address
300 16th St

revision to gsw aena #201908158948 & 201606149949s7 to include sffd approved local equivalencies1.sffd approved ab-005 for back up power for the arenascopeboard 2,sffd approved ab-005 for power shut down for portable av equiptment, no proposed equiptment or sequence changes to approved system

Open the permit page

Jan 29, 2020Never finaled
issued Jan 2020, no final
1 Warriors Wyinstallation of an elevator hall door operator(s) on 4 existing ada lifts at level 000
Details
Permit
202001293041
Status
issued
Filed
Jan 29, 2020
Permit issued
Jan 29, 2020
Declared cost
$20,000
Address
1 Warriors Wy

installation of an elevator hall door operator(s) on 4 existing ada lifts at level 000

Open the permit page

$20,000
Sep 18, 2019Completed
final sign-off Jul 2020
300 16th Stfire sprinklers as built for south tower ref 201606149954 s5
Details
Permit
201909181990
Status
complete
Filed
Sep 18, 2019
Permit issued
Nov 13, 2019
Final sign-off
Jul 30, 2020
Address
300 16th St

fire sprinklers as built for south tower ref 201606149954 s5

Open the permit page

Sep 18, 2019Completed
final sign-off Jul 2020
300 16th Stfire sprinklers as built for north tower ref 201606149952 s5
Details
Permit
201909181989
Status
complete
Filed
Sep 18, 2019
Permit issued
Nov 13, 2019
Final sign-off
Jul 30, 2020
Address
300 16th St

fire sprinklers as built for north tower ref 201606149952 s5

Open the permit page

Aug 29, 2019Expired or cancelled
cancelled Nov 2024
1 Warriors Wyinstall chandelier within bld
Details
Permit
201908290220
Status
cancelled
Filed
Aug 29, 2019
Declared cost
$50,000
Address
1 Warriors Wy

install chandelier within bld

Open the permit page

$50,000
Aug 26, 2019Expired or cancelled
cancelled Jan 2026
300 16th Strevision to 201606149949 s4. mech revision to arch/mep addendum to correct, changes in the filed dues to obstructions and conditions. changes include: revise fan for airflow & statice reqd for pressurzation at all levels. revise elevator pressurization at location to the room on level 600 to comply
Details
Permit
201908269830
Status
cancelled
Filed
Aug 26, 2019
Address
300 16th St

revision to 201606149949 s4. mech revision to arch/mep addendum to correct, changes in the filed dues to obstructions and conditions. changes include: revise fan for airflow & statice reqd for pressurzation at all levels. revise elevator pressurization at location to the room on level 600 to comply

Open the permit page

Aug 23, 2019Never finaled
issued Aug 2019, no final
1 Warriors Wyinstall interior non electric wall sign (176"x26")
Details
Permit
201908239695
Status
issued
Filed
Aug 23, 2019
Permit issued
Aug 26, 2019
Declared cost
$8,000
Address
1 Warriors Wy

install interior non electric wall sign (176"x26")

Open the permit page

$8,000
Aug 20, 2019Expired or cancelled
cancelled Jan 2026
1 Warriors Wyinstall internal single faced wall sign
Details
Permit
201908209326
Status
cancelled
Filed
Aug 20, 2019
Declared cost
$10,000
Address
1 Warriors Wy

install internal single faced wall sign

Open the permit page

$10,000
Aug 20, 2019Expired or cancelled
cancelled Jan 2026
1 Warriors Wyinstall internal single faced wall sign (steel framing to hang art work)
Details
Permit
201908209330
Status
cancelled
Filed
Aug 20, 2019
Declared cost
$15,000
Address
1 Warriors Wy

install internal single faced wall sign (steel framing to hang art work)

Open the permit page

$15,000
Aug 15, 2019Completed
final sign-off Jul 2020
1655 03rd Stnorth tower. as built drawing for north tower's fire alarm & 2-way communication. see pa# 2016/06/14/9952-s6. ** maher: n/a **
Details
Permit
201908158967
Status
complete
Filed
Aug 15, 2019
Permit issued
Jun 25, 2020
Final sign-off
Jul 30, 2020
Address
1655 03rd St

north tower. as built drawing for north tower's fire alarm & 2-way communication. see pa# 2016/06/14/9952-s6. ** maher: n/a **

Open the permit page

Aug 15, 2019Never finaled
issued Jun 2020, no final
300 16th Stfor arena. fire alarm & 2-way communication as-built drawings for arena. see pa# 2016/06/14/9949-s7.
Details
Permit
201908158948
Status
issued
Filed
Aug 15, 2019
Permit issued
Jun 25, 2020
Address
300 16th St

for arena. fire alarm & 2-way communication as-built drawings for arena. see pa# 2016/06/14/9949-s7.

Open the permit page

Aug 15, 2019Completed
final sign-off Jul 2020
1725 03rd Stsouth tower. as built drawing for south tower's fire alarm & 2-way communication. see pa# 2016/06/14/9954-s6. ** maher: n/a **
Details
Permit
201908158966
Status
complete
Filed
Aug 15, 2019
Permit issued
Jun 25, 2020
Final sign-off
Jul 30, 2020
Address
1725 03rd St

south tower. as built drawing for south tower's fire alarm & 2-way communication. see pa# 2016/06/14/9954-s6. ** maher: n/a **

Open the permit page

Aug 13, 2019Never finaled
issued Sep 2019, no final
1 Warriors Wyinstall artwork at stadium. "pathways" is an art sculpture compromised galvanized and painted steel structure holding up laser cut sheet metal panels that are painted off-site.
Details
Permit
201908138702
Status
issued
Filed
Aug 13, 2019
Permit issued
Sep 19, 2019
Declared cost
$18,000
Address
1 Warriors Wy

install artwork at stadium. "pathways" is an art sculpture compromised galvanized and painted steel structure holding up laser cut sheet metal panels that are painted off-site.

Open the permit page

$18,000
Jul 25, 2019Completed
final sign-off Sep 2019
300 16th Stinstall ground electric double faced sign
Details
Permit
201907256977
Status
complete
Filed
Jul 25, 2019
Permit issued
Aug 16, 2019
Final sign-off
Sep 19, 2019
Address
300 16th St

install ground electric double faced sign

Open the permit page

Jul 25, 2019Completed
final sign-off Sep 2019
300 16th Stinstall ground electric double faced sign
Details
Permit
201907256979
Status
complete
Filed
Jul 25, 2019
Permit issued
Aug 16, 2019
Final sign-off
Sep 19, 2019
Address
300 16th St

install ground electric double faced sign

Open the permit page

Jul 25, 2019Completed
final sign-off Sep 2019
300 16th Stinstall ground electric double faced sign
Details
Permit
201907256978
Status
complete
Filed
Jul 25, 2019
Permit issued
Aug 16, 2019
Final sign-off
Sep 19, 2019
Address
300 16th St

install ground electric double faced sign

Open the permit page

Jul 24, 2019Completed
final sign-off Oct 2020
300 16th Stas built revision to warriors sprinkler addendum per app#201606149949 (s6) n/a for maher
Details
Permit
201907246868
Status
complete
Filed
Jul 24, 2019
Permit issued
Sep 3, 2019
Final sign-off
Oct 19, 2020
Address
300 16th St

as built revision to warriors sprinkler addendum per app#201606149949 (s6) n/a for maher

Open the permit page

Jul 17, 2019Completed
final sign-off Aug 2019
300 16th Stnfpa 101 life safety evaluation for chase center arena.**maher n/a**
Details
Permit
201907176102
Status
complete
Filed
Jul 17, 2019
Permit issued
Aug 1, 2019
Final sign-off
Aug 26, 2019
Address
300 16th St

nfpa 101 life safety evaluation for chase center arena.**maher n/a**

Open the permit page

Jul 8, 2019Completed
final sign-off Oct 2021
300 16th Stinstall 1 electrical, single faced, wall sign/video board on westside of arena.
Details
Permit
201907085293
Status
complete
Filed
Jul 8, 2019
Permit issued
Aug 19, 2019
Final sign-off
Oct 4, 2021
Declared cost
$50,000
Address
300 16th St

install 1 electrical, single faced, wall sign/video board on westside of arena.

Open the permit page

$50,000
Jul 8, 2019Completed
final sign-off Oct 2021
300 16th Stinstall 1 led-electric, single faced, ribbon video board wrap on eastside entrance of arena.
Details
Permit
201907085294
Status
complete
Filed
Jul 8, 2019
Permit issued
Aug 16, 2019
Final sign-off
Oct 4, 2021
Declared cost
$25,000
Address
300 16th St

install 1 led-electric, single faced, ribbon video board wrap on eastside entrance of arena.

Open the permit page

$25,000
Jul 8, 2019Completed
final sign-off Oct 2021
300 16th Stinstall 1 led-electric, single faced, ribbon video board wrap on gatehouse of arena.
Details
Permit
201907085296
Status
complete
Filed
Jul 8, 2019
Permit issued
Aug 16, 2019
Final sign-off
Oct 4, 2021
Declared cost
$18,000
Address
300 16th St

install 1 led-electric, single faced, ribbon video board wrap on gatehouse of arena.

Open the permit page

$18,000
Jul 5, 2019Completed
final sign-off Jul 2019
1725 03rd Stadministration permit for pa #201606149954, change adress from 300 16th st w/ apn 822/001 to 1725 3rd st w/ apn 8722/024.
Details
Permit
201907055214
Status
complete
Filed
Jul 5, 2019
Permit issued
Jul 5, 2019
Final sign-off
Jul 8, 2019
Address
1725 03rd St

administration permit for pa #201606149954, change adress from 300 16th st w/ apn 822/001 to 1725 3rd st w/ apn 8722/024.

Open the permit page

Jul 5, 2019Completed
final sign-off Jul 2019
1 Warriors Wyadministration permit for pa #201606149949, change adress from 300 16th st w/ apn 822/001 to 1 warriors way w/ apn 8722/021, street address sign on exterior wall facing street of warrios way, directing the entrance to proposed location on terry a prancois under seperate permit.
Details
Permit
201907055211
Status
complete
Filed
Jul 5, 2019
Permit issued
Jul 5, 2019
Final sign-off
Jul 8, 2019
Address
1 Warriors Wy

administration permit for pa #201606149949, change adress from 300 16th st w/ apn 822/001 to 1 warriors way w/ apn 8722/021, street address sign on exterior wall facing street of warrios way, directing the entrance to proposed location on terry a prancois under seperate permit.

Open the permit page

Jul 5, 2019Completed
final sign-off Jul 2019
1655 03rd Stadministration permit for pa #201606149952, change adress from 300 16th st w/ apn 822/001 to 1655 3rd st w/ apn 8722/023.
Details
Permit
201907055215
Status
complete
Filed
Jul 5, 2019
Permit issued
Jul 5, 2019
Final sign-off
Jul 8, 2019
Address
1655 03rd St

administration permit for pa #201606149952, change adress from 300 16th st w/ apn 822/001 to 1655 3rd st w/ apn 8722/023.

Open the permit page

Jul 2, 2019Completed
final sign-off Oct 2021
300 16th Sterect no illuminated "chase vip east" sign (11'8'x 10")
Details
Permit
201907024936
Status
complete
Filed
Jul 2, 2019
Permit issued
Jul 16, 2019
Final sign-off
Oct 4, 2021
Declared cost
$1,000
Address
300 16th St

erect no illuminated "chase vip east" sign (11'8'x 10")

Open the permit page

$1,000
Jul 2, 2019Completed
final sign-off Oct 2021
300 16th Sterect no illuminated "chase vip west" sign (11'8'x 10")
Details
Permit
201907024939
Status
complete
Filed
Jul 2, 2019
Permit issued
Jul 16, 2019
Final sign-off
Oct 4, 2021
Declared cost
$1,000
Address
300 16th St

erect no illuminated "chase vip west" sign (11'8'x 10")

Open the permit page

$1,000
Jun 13, 2019Completed
final sign-off Oct 2021
300 16th Strevision to pa #201606149954-s2. revise damper matrix and smoke control configuration as stated in revised smoke control amendment letter. north tower.
Details
Permit
201906133376
Status
complete
Filed
Jun 13, 2019
Permit issued
Jun 28, 2019
Final sign-off
Oct 4, 2021
Declared cost
$25,000
Address
300 16th St

revision to pa #201606149954-s2. revise damper matrix and smoke control configuration as stated in revised smoke control amendment letter. north tower.

Open the permit page

$25,000
Jun 13, 2019Completed
final sign-off Oct 2021
300 16th Strevision to pa #201606149954-s2. revise damper matrix and smoke control configuration as stated in revised smoke control amendment letter. south tower.
Details
Permit
201906133375
Status
complete
Filed
Jun 13, 2019
Permit issued
Jul 1, 2019
Final sign-off
Oct 4, 2021
Declared cost
$25,000
Address
300 16th St

revision to pa #201606149954-s2. revise damper matrix and smoke control configuration as stated in revised smoke control amendment letter. south tower.

Open the permit page

$25,000
Jun 12, 2019Completed
final sign-off Sep 2019
300 16th Stto erect non electrical wall sign (warrior of id) n/a for maher
Details
Permit
201906123244
Status
complete
Filed
Jun 12, 2019
Permit issued
Jul 16, 2019
Final sign-off
Sep 17, 2019
Declared cost
$3,000
Address
300 16th St

to erect non electrical wall sign (warrior of id) n/a for maher

Open the permit page

$3,000
Jun 12, 2019Completed
final sign-off Sep 2019
300 16th Stto erect non electrical wall sign (1 warrior way) n/a for maher
Details
Permit
201906123239
Status
complete
Filed
Jun 12, 2019
Permit issued
Jul 16, 2019
Final sign-off
Sep 17, 2019
Declared cost
$1,000
Address
300 16th St

to erect non electrical wall sign (1 warrior way) n/a for maher

Open the permit page

$1,000
Jun 12, 2019Completed
final sign-off Sep 2019
300 16th Stto erect non-electrical single faced wall sign (bike valet). n/a for maher.
Details
Permit
201906123245
Status
complete
Filed
Jun 12, 2019
Permit issued
Jul 16, 2019
Final sign-off
Sep 17, 2019
Declared cost
$1,100
Address
300 16th St

to erect non-electrical single faced wall sign (bike valet). n/a for maher.

Open the permit page

$1,100
Jun 12, 2019Completed
final sign-off Sep 2019
300 16th Stto erect non electrical wall sign (box office) n/a for maher
Details
Permit
201906123243
Status
complete
Filed
Jun 12, 2019
Permit issued
Jul 16, 2019
Final sign-off
Sep 17, 2019
Declared cost
$900
Address
300 16th St

to erect non electrical wall sign (box office) n/a for maher

Open the permit page

$900
Jun 7, 2019Completed
final sign-off Sep 2019
300 16th Stinstall 1 door/window chase center sign 2 1/2" x 2 3/8"
Details
Permit
201906072902
Status
complete
Filed
Jun 7, 2019
Permit issued
Jul 16, 2019
Final sign-off
Sep 12, 2019
Declared cost
$2,000
Address
300 16th St

install 1 door/window chase center sign 2 1/2" x 2 3/8"

Open the permit page

$2,000
Jun 7, 2019Completed
final sign-off Sep 2019
300 16th Stto erect 4 electrical monument sign n/a for maher
Details
Permit
201906072903
Status
complete
Filed
Jun 7, 2019
Permit issued
Jul 16, 2019
Final sign-off
Sep 12, 2019
Declared cost
$16,000
Address
300 16th St

to erect 4 electrical monument sign n/a for maher

Open the permit page

$16,000
Jun 7, 2019Completed
final sign-off Sep 2019
300 16th Stto erect electrical monument sign
Details
Permit
201906072909
Status
complete
Filed
Jun 7, 2019
Permit issued
Jul 16, 2019
Final sign-off
Sep 12, 2019
Declared cost
$4,000
Address
300 16th St

to erect electrical monument sign

Open the permit page

$4,000
Jun 7, 2019Completed
final sign-off Oct 2021
300 16th Stinstall (9) ground electrical double faced signs - frame only
Details
Permit
201906072879
Status
complete
Filed
Jun 7, 2019
Permit issued
Jul 26, 2019
Final sign-off
Oct 4, 2021
Declared cost
$90,000
Address
300 16th St

install (9) ground electrical double faced signs - frame only

Open the permit page

$90,000
Jun 7, 2019Completed
final sign-off Oct 2021
300 16th Stinstall 2'0" x 17'69/32" single faced wall sign
Details
Permit
201906072910
Status
complete
Filed
Jun 7, 2019
Permit issued
Jul 16, 2019
Final sign-off
Oct 4, 2021
Declared cost
$4,000
Address
300 16th St

install 2'0" x 17'69/32" single faced wall sign

Open the permit page

$4,000
May 22, 2019Completed
final sign-off Sep 2019
300 16th Stref pa# 201606149949; evacuation plans for areana n/a maher
Details
Permit
201905221336
Status
complete
Filed
May 22, 2019
Permit issued
Jul 25, 2019
Final sign-off
Sep 27, 2019
Declared cost
$50,000
Address
300 16th St

ref pa# 201606149949; evacuation plans for areana n/a maher

Open the permit page

$50,000
May 8, 2019Completed
final sign-off Oct 2021
300 16th Sterect a electric,roof,single faced sign. "chase center"
Details
Permit
201905080188
Status
complete
Filed
May 8, 2019
Permit issued
May 31, 2019
Final sign-off
Oct 4, 2021
Declared cost
$50,000
Address
300 16th St

erect a electric,roof,single faced sign. "chase center"

Open the permit page

$50,000
May 7, 2019Completed
final sign-off Aug 2019
300 16th Sthealth only -review of recycled systems. ref 201606149949 s4, 201606149952 & 201606149954
Details
Permit
201905079980
Status
complete
Filed
May 7, 2019
Permit issued
May 8, 2019
Final sign-off
Aug 26, 2019
Address
300 16th St

health only -review of recycled systems. ref 201606149949 s4, 201606149952 & 201606149954

Open the permit page

Apr 23, 2019Never finaled
issued Jul 2019, no final
300 16th Strevision to pa #201606149949s4 to capture all design conditions in chase arena. interior work only. ** maher: n/a **
Details
Permit
201904238695
Status
issued
Filed
Apr 23, 2019
Permit issued
Jul 31, 2019
Address
300 16th St

revision to pa #201606149949s4 to capture all design conditions in chase arena. interior work only. ** maher: n/a **

Open the permit page

Apr 1, 2019Completed
final sign-off Aug 2019
300 16th Strevision to 201606149949 s4 create 2 hour seperation between garage and towers ofr fire alarm purposes
Details
Permit
201904016774
Status
complete
Filed
Apr 1, 2019
Permit issued
May 17, 2019
Final sign-off
Aug 26, 2019
Declared cost
$75,000
Address
300 16th St

revision to 201606149949 s4 create 2 hour seperation between garage and towers ofr fire alarm purposes

Open the permit page

$75,000
Mar 29, 2019Completed
final sign-off Sep 2019
300 16th Stti to combine 2 lounges into one lounge mahern a revision to p.a.#2016 0614 9949 s4
Details
Permit
201903296696
Status
complete
Filed
Mar 29, 2019
Permit issued
May 20, 2019
Final sign-off
Sep 5, 2019
Declared cost
$10,000
Address
300 16th St

ti to combine 2 lounges into one lounge mahern a revision to p.a.#2016 0614 9949 s4

Open the permit page

$10,000
Feb 12, 2019Never finaled
issued Jun 2019, no final
300 16th Stt.i. work in event center / arena that includes offices. misc support spaces & a business entry point total approx 31,200 sq.ft. business entry on grade level 050 with offices & support spaces on level 100.
Details
Permit
201902122747
Status
issued
Filed
Feb 12, 2019
Permit issued
Jun 27, 2019
Declared cost
$10,000,000
Address
300 16th St

t.i. work in event center / arena that includes offices. misc support spaces & a business entry point total approx 31,200 sq.ft. business entry on grade level 050 with offices & support spaces on level 100.

Open the permit page

$10,000,000
Jan 30, 2019Completed
final sign-off Jul 2019
300 16th Stpre-action & detection control systems. fire only. reference #2016-0614-9949. ** maher: n/a **
Details
Permit
201901301650
Status
complete
Filed
Jan 30, 2019
Permit issued
Mar 4, 2019
Final sign-off
Jul 31, 2019
Address
300 16th St

pre-action & detection control systems. fire only. reference #2016-0614-9949. ** maher: n/a **

Open the permit page

Jan 28, 2019Completed
final sign-off Aug 2019
300 16th Stinstall 37 ul300 hood and dust fire systems. reference pa #201606149949-s. ** maher: n/a **
Details
Permit
201901281432
Status
complete
Filed
Jan 28, 2019
Permit issued
Mar 4, 2019
Final sign-off
Aug 16, 2019
Address
300 16th St

install 37 ul300 hood and dust fire systems. reference pa #201606149949-s. ** maher: n/a **

Open the permit page

Dec 20, 2017Completed
final sign-off Jul 2019
300 16th St8 inch underground fire service from property line curb into building. site hydrant locations. maher n/a
Details
Permit
201712206991
Status
complete
Filed
Dec 20, 2017
Permit issued
Feb 20, 2018
Final sign-off
Jul 18, 2019
Declared cost
$15,000
Address
300 16th St

8 inch underground fire service from property line curb into building. site hydrant locations. maher n/a

Open the permit page

$15,000
Jul 25, 2017Completed
final sign-off Jun 2019
300 16th Sttemporary construction, erection , operation of tower crane #2. reference to building site permit application no. 201606149949 s.
Details
Permit
201707252889
Status
complete
Filed
Jul 25, 2017
Permit issued
Jul 27, 2017
Final sign-off
Jun 13, 2019
Declared cost
$100,000
Address
300 16th St

temporary construction, erection , operation of tower crane #2. reference to building site permit application no. 201606149949 s.

Open the permit page

$100,000
Jul 25, 2017Completed
final sign-off Jun 2019
300 16th Sttemp construction, erection and operation of tower crane #3. reference to building site permit application no. 201606149949 s.
Details
Permit
201707252892
Status
complete
Filed
Jul 25, 2017
Permit issued
Jul 27, 2017
Final sign-off
Jun 13, 2019
Declared cost
$100,000
Address
300 16th St

temp construction, erection and operation of tower crane #3. reference to building site permit application no. 201606149949 s.

Open the permit page

$100,000
Jul 24, 2017Completed
final sign-off Jun 2019
300 16th Sttemp construction, erection and operation of tower crane #1. n/a ordinance #155-13. reference to building site permit application no. 201606149949 s.
Details
Permit
201707242733
Status
complete
Filed
Jul 24, 2017
Permit issued
Jul 27, 2017
Final sign-off
Jun 13, 2019
Declared cost
$100,000
Address
300 16th St

temp construction, erection and operation of tower crane #1. n/a ordinance #155-13. reference to building site permit application no. 201606149949 s.

Open the permit page

$100,000
Jun 19, 2017Completed
final sign-off Jun 2019
300 16th Sttemp construction, erection and operation of tower crane (#5) maher na.
Details
Permit
201706199715
Status
complete
Filed
Jun 19, 2017
Permit issued
Jul 27, 2017
Final sign-off
Jun 13, 2019
Declared cost
$100,000
Address
300 16th St

temp construction, erection and operation of tower crane (#5) maher na.

Open the permit page

$100,000
May 31, 2017Completed
final sign-off Jun 2019
300 16th Sttemp construction, erection and operation of tower crane (#4) maher na. deep foundations under addenda #2.
Details
Permit
201705317952
Status
complete
Filed
May 31, 2017
Permit issued
Jun 5, 2017
Final sign-off
Jun 17, 2019
Declared cost
$100,000
Address
300 16th St

temp construction, erection and operation of tower crane (#4) maher na. deep foundations under addenda #2.

Open the permit page

$100,000
Apr 18, 2017Never finaled
issued Sep 2017, no final
300 16th Staltered site permit to revise site permit #2016-0614-9949. revise gate house location and modification to north east corner retail area.
Details
Permit
201704184260
Status
issued
Filed
Apr 18, 2017
Permit issued
Sep 29, 2017
Address
300 16th St

altered site permit to revise site permit #2016-0614-9949. revise gate house location and modification to north east corner retail area.

Open the permit page

Oct 13, 2016Completed
final sign-off Jun 2019
300 16th Stinstall indicator piles within site. reference to building site permit application no. 201606149949s; 201606149952s & 201606149954s.
Details
Permit
201610130222
Status
complete
Filed
Oct 13, 2016
Permit issued
Nov 30, 2016
Final sign-off
Jun 13, 2019
Declared cost
$1,200,000
Address
300 16th St

install indicator piles within site. reference to building site permit application no. 201606149949s; 201606149952s & 201606149954s.

Open the permit page

$1,200,000
Oct 13, 2016Completed
final sign-off Jul 2019
300 16th Sttemporary shoring & excavation at site to prepare for future work. reference to building permit application no. 201606149949s;201606149952s;201606149954s
Details
Permit
201610130225
Status
complete
Filed
Oct 13, 2016
Permit issued
Nov 14, 2016
Final sign-off
Jul 10, 2019
Declared cost
$10,900,000
Address
300 16th St

temporary shoring & excavation at site to prepare for future work. reference to building permit application no. 201606149949s;201606149952s;201606149954s

Open the permit page

$10,900,000
Jun 14, 2016Completed
final sign-off Jul 2020
300 16th Stconstruct (n) 11-story office building
Details
Permit
201606149952
Status
complete
Filed
Jun 14, 2016
Permit issued
Apr 11, 2017
Final sign-off
Jul 24, 2020
Declared cost
$145,665,213
Address
300 16th St

construct (n) 11-story office building

Open the permit page

$145,665,213
Jun 14, 2016Completed
final sign-off Jul 2020
300 16th Stconstruct (n) 11-story office building
Details
Permit
201606149954
Status
complete
Filed
Jun 14, 2016
Permit issued
Apr 11, 2017
Final sign-off
Jul 24, 2020
Declared cost
$6,283,099
Address
300 16th St

construct (n) 11-story office building

Open the permit page

$6,283,099
Jun 14, 2016Completed
final sign-off Oct 2020
300 16th Stconstruct (n) professional sports arena: includes gate house, theatre/auditorium, parking garage, team offices, gymnasiums, restaurants & retail
Details
Permit
201606149949
Status
complete
Filed
Jun 14, 2016
Permit issued
Apr 11, 2017
Final sign-off
Oct 19, 2020
Declared cost
$537,958,646
Address
300 16th St

construct (n) professional sports arena: includes gate house, theatre/auditorium, parking garage, team offices, gymnasiums, restaurants & retail

Open the permit page

$537,958,646