Block 0811, lot 031
101 Polk St
- City’s use
- Multi-Family Residential
- Built
- 2016
- Stories
- 14
- Units
- 162
- Building
- 155,218 sq ft
- Lot
- 13,200 sq ft
- Zoning
- C3G
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 9, 2020 | Completed final sign-off Oct 2021 | 101 Polk St | red cloud to reprogram comm scope bda to comply w/sf new requirements, install new donor "roof" antenna to point towards one market st. site, all other errcs equipment shall remain unchangedDetails
red cloud to reprogram comm scope bda to comply w/sf new requirements, install new donor "roof" antenna to point towards one market st. site, all other errcs equipment shall remain unchanged | $10,000 | |
| Feb 17, 2016 | Never finaled issued Feb 2016, no final | 101 Polk St | revision to pa 2013 0705 1190. roll down smoke door at mail room to be disconnected and secured in-place in the fully open position. opening to be covered in gyp board abd painted to match adjoining surfaces. maher naDetails
revision to pa 2013 0705 1190. roll down smoke door at mail room to be disconnected and secured in-place in the fully open position. opening to be covered in gyp board abd painted to match adjoining surfaces. maher na | ||
| Dec 7, 2015 | Never finaled issued Dec 2015, no final | 101 Polk St | street spaceDetails
street space | ||
| Nov 4, 2015 | Completed final sign-off Feb 2016 | 101 Polk St | Maguire Inc Dba Lahue And Associates | (44) evacuation signs for entire bldg. (13/f is called out as 14/f, no 13/f).Details
(44) evacuation signs for entire bldg. (13/f is called out as 14/f, no 13/f). | $13,800 |
| Oct 30, 2015 | Never finaled issued Nov 2015, no final | 101 Polk St | Build Group Inc. | revision to appl #201308134213 - as per fire marshall request, this permit is to document fuel oil sheets fo-1, fo-2 & fo-3 was approved 4/23/14.Details
revision to appl #201308134213 - as per fire marshall request, this permit is to document fuel oil sheets fo-1, fo-2 & fo-3 was approved 4/23/14. | |
| Mar 17, 2014 | Completed final sign-off Aug 2015 | 101 Polk St | Build Group Inc. | provide tower crane. n/a for the maher ordinance #155-13Details
provide tower crane. n/a for the maher ordinance #155-13 | $20,000 |
| Dec 17, 2013 | Never finaled issued Apr 2014, no final | 101 Polk St | Build Group Inc. | install firefighter air system. ref: new building under 2013-07-05-1190.Details
install firefighter air system. ref: new building under 2013-07-05-1190. | $100,000 |
| Nov 27, 2013 | Completed final sign-off Jun 2016 | 101 Polk St | Convergint Technologies Lp | provide new fire alarm voice evacuation system and node in fire command center. ref: new building under 2013-07-05-1190. throughout new r-2Details
provide new fire alarm voice evacuation system and node in fire command center. ref: new building under 2013-07-05-1190. throughout new r-2 | $100,000 |
| Nov 12, 2013 | Completed final sign-off Feb 2016 | 101 Polk St | Superior Automatic Sprinkler | install fire sprinkler/sandpipe system throughout entire building per nfpa 13 and 24 with two new 6" fire services off of 8" main on polk st.. ref new building under architural and structural pa #201307051190. ** maher: compliance with ordinance no# 155-13 not required **Details
install fire sprinkler/sandpipe system throughout entire building per nfpa 13 and 24 with two new 6" fire services off of 8" main on polk st.. ref new building under architural and structural pa #201307051190. ** maher: compliance with ordinance no# 155-13 not required ** | $200,000 |
| Aug 13, 2013 | Completed final sign-off Jun 2016 | 101 Polk St | Build Group Inc. | provide mechanical, electrical and plumbing for new bldg under bpa#201307051190Details
provide mechanical, electrical and plumbing for new bldg under bpa#201307051190 | $400,000 |
| Aug 13, 2013 | Completed final sign-off Feb 2016 | 101 Polk St | Build Group Inc. | temporary lateral support of excavation for new construction by soldier beams, tiebacks and wood laggingDetails
temporary lateral support of excavation for new construction by soldier beams, tiebacks and wood lagging | $225,000 |
| Jul 5, 2013 | Completed final sign-off Jun 2016 | 101 Polk St | Build Group Inc. | erect 13 stories, 162 dwelling units, with parking and office building.Details
erect 13 stories, 162 dwelling units, with parking and office building. | $30,000,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Build Group Inc. (6), Convergint Technologies Lp, Maguire Inc Dba Lahue And Associates, Superior Automatic Sprinkler
- Architects
- Christopher Pemberton
- Engineers
- Max E Saiidnias (2), Christian Bowers, Tuan & Robinson
- Authorized agent-otherss
- Serena Jang
- Pmt consultant/expediters
- James Dyer (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.