Christopher T. Pemberton
- Listed as
- architect, authorized agent-others, engineer, lessee
- Firm
- Solomon Cordwell Buenz
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Jan 2022
37 permits since 2000 (architect on 33 permits, lessee on 2 permits, authorized agent-others on 1 permit, engineer on 1 permit): 29 completed, 6 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 13, 2022 | Completed final sign-off May 2022 | 1028 Market St | Build Group Inc. | administrative permit only to correct dwelling unit count from 186 to 193 units per plans as approved in -site permit pa#201707172085 & arch/mep addendum #3. see sheet a0.06 for approved unit count.Details
administrative permit only to correct dwelling unit count from 186 to 193 units per plans as approved in -site permit pa#201707172085 & arch/mep addendum #3. see sheet a0.06 for approved unit count. | |
| Jul 9, 2019 | Completed final sign-off Sep 2019 | 100 Van Ness Av | 1/f: rev to pa201804207003: revision to garage fresh air intake duct from gypsum board enclosure to use morgan flame master. maher n/a.Details
1/f: rev to pa201804207003: revision to garage fresh air intake duct from gypsum board enclosure to use morgan flame master. maher n/a. | ||
| Oct 5, 2018 | Completed final sign-off Nov 2018 | 150 Van Ness Av | provide electrical and plumbing for future retail tenants at ground fl. sprinklers under separate permit. ref #201808157451. maher n/a.Details
provide electrical and plumbing for future retail tenants at ground fl. sprinklers under separate permit. ref #201808157451. maher n/a. | ||
| Aug 15, 2018 | Completed final sign-off Nov 2018 | 150 Van Ness Av | provide interior partitions and existing for future retail tenants. ref bpa #201406138394/s3.Details
provide interior partitions and existing for future retail tenants. ref bpa #201406138394/s3. | $25,000 | |
| Mar 27, 2018 | Completed final sign-off Sep 2018 | 150 Van Ness Av | provide one fire table at level 3 pool deck, and four fire tables at level 14 roof terrace. ref app#201406138394/s-3Details
provide one fire table at level 3 pool deck, and four fire tables at level 14 roof terrace. ref app#201406138394/s-3 | $10,000 | |
| Jul 17, 2017 | Completed final sign-off May 2022 | 1028 Market St | Build Group Inc. | construct (n) 13-story mixed-use building r2 and mDetails
construct (n) 13-story mixed-use building r2 and m | $60,000,000 |
| Nov 16, 2016 | Completed final sign-off May 2017 | 100 Van Ness Av | to replace existing swinging entry doors at 100 van ness with new automatic sliding doors.ref chnage of use # 201208226344. n/a ordinance #155-13Details
to replace existing swinging entry doors at 100 van ness with new automatic sliding doors.ref chnage of use # 201208226344. n/a ordinance #155-13 | $3,000 | |
| May 24, 2016 | Completed final sign-off Sep 2016 | 100 Van Ness Av | revision to pa #201410108636: addition of structural steel supports for an existing cmu wall and framing over existing plaster wall both located on the east side of bldg, not visible from street. n/a maher ordinanceDetails
revision to pa #201410108636: addition of structural steel supports for an existing cmu wall and framing over existing plaster wall both located on the east side of bldg, not visible from street. n/a maher ordinance | $3,000 | |
| Apr 27, 2016 | Completed final sign-off Feb 2017 | 399 Fremont St | Swinerton Builders | deferred permit for application 200605161774 addenda 4 superstructure, installation of accelerograph for seismic monitoring; maher n/aDetails
deferred permit for application 200605161774 addenda 4 superstructure, installation of accelerograph for seismic monitoring; maher n/a | |
| Feb 10, 2016 | Never finaled issued Mar 2016, no final | 50 Fell St | minor alteration entails the removal of infilled openings on the north, non-primary facade within an existing concrete wall and installing (11) new steel, multi-lite windows to match existing surrounding openings. maher n/a.Details
minor alteration entails the removal of infilled openings on the north, non-primary facade within an existing concrete wall and installing (11) new steel, multi-lite windows to match existing surrounding openings. maher n/a. | $8,000 | |
| Feb 4, 2016 | Never finaled issued Feb 2016, no final | 185 Berry St | Rossi Builders Inc. | revision to pa 2015-0925-8063, consist construction of a one hour rated horizontal assembly in the elevator lobby; maher n/aDetails
revision to pa 2015-0925-8063, consist construction of a one hour rated horizontal assembly in the elevator lobby; maher n/a | $12,000 |
| Jan 15, 2016 | Never finaled issued Feb 2016, no final | 3 Embarcadero Center | Principal Builders Inc. | suite 1410, 14th floor- scope of project of existing office (b occupancy) building. it is a multi-tenant floor. the scope consists of the construction of new partitions and minor electrical, plumbing. no mech work. electrical, plumbing, sprinkler on seperate permit. n/a maher ordinanceDetails
suite 1410, 14th floor- scope of project of existing office (b occupancy) building. it is a multi-tenant floor. the scope consists of the construction of new partitions and minor electrical, plumbing. no mech work. electrical, plumbing, sprinkler on seperate permit. n/a maher ordinance | $55,000 |
| Oct 23, 2015 | Completed final sign-off Jan 2017 | 185 Berry St | Rossi Builders Inc. | #6600- construction of new partitions and minor mechancial, electrical, plumbing, fire sprinkler & fire alarm work. mep & fire alarm under seperate permit. n/a ordinance #155-13.Details
#6600- construction of new partitions and minor mechancial, electrical, plumbing, fire sprinkler & fire alarm work. mep & fire alarm under seperate permit. n/a ordinance #155-13. | $430,500 |
| Jul 21, 2015 | Completed final sign-off Apr 2017 | 100 Van Ness Av | to provide equal access for the physically challenged from level 1 to the existing mezzanine level by means of a new mechanical lift. the work includes the installation of the lift only. n/a maher ordinanceDetails
to provide equal access for the physically challenged from level 1 to the existing mezzanine level by means of a new mechanical lift. the work includes the installation of the lift only. n/a maher ordinance | $54,000 | |
| Jun 9, 2015 | Completed final sign-off Aug 2016 | 500 03rd St | Rossi Builders Inc. | this project consists of the removal of existing non-compliant pipe handrails within two of the building existing stairwells & installing new handrails & guardrails that meet the disabled access. n/a maher ordinanceDetails
this project consists of the removal of existing non-compliant pipe handrails within two of the building existing stairwells & installing new handrails & guardrails that meet the disabled access. n/a maher ordinance | $200,000 |
| Feb 18, 2015 | Completed final sign-off Feb 2017 | 280 Beale St | defered submital to addenda s/5 building "a" architectural for fsae water protection of elerator shafts. 2013-04-02-3626. n/a for maher ordinance.Details
defered submital to addenda s/5 building "a" architectural for fsae water protection of elerator shafts. 2013-04-02-3626. n/a for maher ordinance. | ||
| Nov 4, 2014 | Completed final sign-off Jan 2016 | 150 Van Ness Av | interior soft demolition to include selective demolition and removal of the mep systems. demo per ab17 no occupancy.Details
interior soft demolition to include selective demolition and removal of the mep systems. demo per ab17 no occupancy. | $245,000 | |
| Nov 3, 2014 | Completed final sign-off Jun 2015 | 401 Harrison St | Webcor Construction Lp | administrative permit to document unit revision to site permit #2004.1221.1855 eliminate one dwelling unit for the purpose of creating an amenity space including new bar; unit count from 299 to 298 units. note: there is no level 3 on this project. n/a maher ordinanceDetails
administrative permit to document unit revision to site permit #2004.1221.1855 eliminate one dwelling unit for the purpose of creating an amenity space including new bar; unit count from 299 to 298 units. note: there is no level 3 on this project. n/a maher ordinance | |
| Nov 3, 2014 | Completed final sign-off Jun 2015 | 401 Harrison St | administrative permit to document unit count from 312 to 299 dwelling units as approved by site permit #2004.1221.1855 drawing a0.07a. to also document story count there are 48 occupied floors & 3 mechanical floors. n/a maher ordinanceDetails
administrative permit to document unit count from 312 to 299 dwelling units as approved by site permit #2004.1221.1855 drawing a0.07a. to also document story count there are 48 occupied floors & 3 mechanical floors. n/a maher ordinance | ||
| Sep 25, 2014 | Never finaled issued Sep 2014, no final | 255 California St | Plant Construction Co, Lp | 3rd floor - office t.i. new partition, finishes and lighting. mep under separate permit. maher n/a.Details
3rd floor - office t.i. new partition, finishes and lighting. mep under separate permit. maher n/a. | $150,000 |
| Sep 25, 2014 | Never finaled issued Sep 2014, no final | 255 California St | 4th floor t.i. including partitions and finishes. mep under separate permit. maher n/a.Details
4th floor t.i. including partitions and finishes. mep under separate permit. maher n/a. | $350,000 | |
| Sep 16, 2014 | Completed final sign-off Jan 2016 | 150 Van Ness Av | removal of all exterior non load bearing vertical surfaces of (e) 7 story bldg at 150 van ness/155 hayes. existing interior and structure will remain. comply with maher ordinance no.155-13 not required.Details
removal of all exterior non load bearing vertical surfaces of (e) 7 story bldg at 150 van ness/155 hayes. existing interior and structure will remain. comply with maher ordinance no.155-13 not required. | $125,000 | |
| Sep 16, 2014 | Expired or cancelled cancelled Jan 2020 | 100 Van Ness Av | demolition for the north and east property line walls at levels 02-08. to comply with maher ordinance 155-13 not requiredDetails
demolition for the north and east property line walls at levels 02-08. to comply with maher ordinance 155-13 not required | $150,000 | |
| Sep 12, 2014 | Completed final sign-off Jan 2017 | 923 Folsom St | Cahill Contractors Inc | to demolish 2 stories, bus repair garage & office building. ** maher: compliance with ordinance no# 155-13 not required **Details
to demolish 2 stories, bus repair garage & office building. ** maher: compliance with ordinance no# 155-13 not required ** | $55,000 |
| Jun 18, 2014 | Never finaled filed Jun 2014, never issued | 525 Harrison St | to erect 23 stories, 4 basement, 200 dwelling units & retail building. ** maher: compliance with ordinance no. 155-13 required; route to dph **Details
to erect 23 stories, 4 basement, 200 dwelling units & retail building. ** maher: compliance with ordinance no. 155-13 required; route to dph ** | $71,000,000 | |
| Jun 13, 2014 | Completed final sign-off Sep 2018 | 150 Van Ness Av | erect 13 stories ,431 dwelling units.Details
erect 13 stories ,431 dwelling units. | $108,000,000 | |
| Nov 20, 2013 | Completed final sign-off Nov 2017 | 923 Folsom St | Cahill Contractors Inc | to erect 9 stories, 1 basement, 115 residential units, commercial & parking.Details
to erect 9 stories, 1 basement, 115 residential units, commercial & parking. | $35,000,000 |
| Sep 17, 2013 | Completed final sign-off Oct 2014 | 55 09th St | Avalon Bay Communities | revision to pa# 2011/08/23/3049-s2 (arch). add smoke barriers for shaft at generator room. 2 hour rated wall garage exhaust duct, fitness center & generator room. active louvres for west & south elevations. exhaust louvre south elevation. 2 hour rated enclosures for ductsDetails
revision to pa# 2011/08/23/3049-s2 (arch). add smoke barriers for shaft at generator room. 2 hour rated wall garage exhaust duct, fitness center & generator room. active louvres for west & south elevations. exhaust louvre south elevation. 2 hour rated enclosures for ducts | |
| Jul 16, 2013 | Completed final sign-off Oct 2013 | 255 California St | Plant Construction Company Lp | revision to pa #2013.05.02.5973 -& 2013.05.24.7813 - change designation of rm #325 to "it room", omit enclosing one-hr rating on walls, omit fsd's.Details
revision to pa #2013.05.02.5973 -& 2013.05.24.7813 - change designation of rm #325 to "it room", omit enclosing one-hr rating on walls, omit fsd's. | |
| Jul 5, 2013 | Completed final sign-off Jun 2016 | 101 Polk St | Build Group Inc. | erect 13 stories, 162 dwelling units, with parking and office building.Details
erect 13 stories, 162 dwelling units, with parking and office building. | $30,000,000 |
| May 2, 2013 | Completed final sign-off Oct 2013 | 255 California St | Plant Construction Company Lp | floor 3. office t.i. - new partitions, finishes, lighting. mechanical and electrical under separate permit.Details
floor 3. office t.i. - new partitions, finishes, lighting. mechanical and electrical under separate permit. | $700,000 |
| Apr 2, 2013 | Completed final sign-off Feb 2017 | 280 Beale St | Bb/Cc A California Joint Venture | to erect 32 stories, 479 condo units with retail.Details
to erect 32 stories, 479 condo units with retail. | $131,088,316 |
| Aug 2, 2012 | Completed final sign-off Sep 2016 | 100 Van Ness Av | convert (e) office building int 399 residential apartments ground floor retail and roof deck. maintain (e) steel frame structure and garage. remove pre-cast concrete skin and replace with glass curtain wall. renovate interior of building.Details
convert (e) office building int 399 residential apartments ground floor retail and roof deck. maintain (e) steel frame structure and garage. remove pre-cast concrete skin and replace with glass curtain wall. renovate interior of building. | $75,000,000 | |
| Jun 13, 2012 | Completed final sign-off Sep 2012 | 2375 Golden Gate Av | Turner Construction Co | 3rd floor:t.i. for 3rd floor of university center bldg. work includes new partitions, ceiling, fixtures, finishes. mep and fire protection under seperate permit.Details
3rd floor:t.i. for 3rd floor of university center bldg. work includes new partitions, ceiling, fixtures, finishes. mep and fire protection under seperate permit. | $40,000 |
| May 25, 2012 | Completed final sign-off Aug 2014 | 2375 Golden Gate Av | Turner Construction Co | 3rd floor tenant improvement to (e) building, full floor tenant suite demolition work to remove (e) walls, ceilings (per ab-017).Details
3rd floor tenant improvement to (e) building, full floor tenant suite demolition work to remove (e) walls, ceilings (per ab-017). | $105,000 |
| May 16, 2006 | Completed final sign-off Feb 2017 | 399 Fremont St | erect 42-story, 3 basements, 452 dwelling residential with parking bldg.Details
erect 42-story, 3 basements, 452 dwelling residential with parking bldg. | $100,000,000 | |
| Sep 19, 2000 | Expired or cancelled expired Mar 2001 | 140 Geary St | new automatic door openerDetails
new automatic door opener | $20,000 |