Kevin Menninger
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Imeg
- Based in
- San Francisco
- On San Francisco permits
- May 2002 to Nov 2019
64 permits since 2000 (engineer on 57 permits, architect on 6 permits, authorized agent-others on 1 permit): 46 completed, 8 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 6, 2019 | Completed final sign-off Sep 2024 | 2240 Market St | Fisher Development Inc | revision to pa 2017-0331-2940 s1. revision to foundation designDetails
revision to pa 2017-0331-2940 s1. revision to foundation design | |
| Oct 8, 2019 | Completed final sign-off Dec 2020 | 2000 Bryant St | Build Group Inc. | typical metal stud framing details subsequently left out of permit #201406239109 rev. to addenda #3. maher naDetails
typical metal stud framing details subsequently left out of permit #201406239109 rev. to addenda #3. maher na | |
| Nov 19, 2018 | Completed final sign-off Nov 2020 | 1066 Market St | Swinerton Builders | revision to pa# 201805179454 & 201811065179. the tower crane erected @ 1066 market is no longer available. a different tower crane, by a different manufacturer is being used. this diff tower crane imposes different loads to the tower crane foundation w/c required the foundation to be re-engineered.Details
revision to pa# 201805179454 & 201811065179. the tower crane erected @ 1066 market is no longer available. a different tower crane, by a different manufacturer is being used. this diff tower crane imposes different loads to the tower crane foundation w/c required the foundation to be re-engineered. | |
| Nov 6, 2018 | Completed final sign-off Sep 2020 | 1066 Market St | Swinerton Builders | revision to app#201805179454. change to tower crane model ctl 630. n/a for maherDetails
revision to app#201805179454. change to tower crane model ctl 630. n/a for maher | |
| May 17, 2018 | Completed final sign-off Sep 2020 | 1066 Market St | Swinerton Builders | tower crane erection and dismantle.Details
tower crane erection and dismantle. | $230,000 |
| Mar 20, 2018 | Expired or cancelled cancelled Nov 2022 | 88 Arkansas St | James E Roberts-Obayashi Corporation | structural revisions to issued s1 for pa #2015-1102-1443. changes in shear wall core, mat foundation, design mild steel & post-tensioned slab design rebar & tendons added & relocatedl removal of solarium & penthouse; add slab & relocate various columns.Details
structural revisions to issued s1 for pa #2015-1102-1443. changes in shear wall core, mat foundation, design mild steel & post-tensioned slab design rebar & tendons added & relocatedl removal of solarium & penthouse; add slab & relocate various columns. | |
| Dec 11, 2017 | Completed final sign-off Feb 2019 | 100 Van Ness Av | provide new openings at 2nd and b1 levels for future connection to 150 van ness avenue. n/a ordinance #155-13Details
provide new openings at 2nd and b1 levels for future connection to 150 van ness avenue. n/a ordinance #155-13 | $76,000 | |
| Aug 17, 2017 | Completed final sign-off Sep 2019 | 1800 Owens St | alteration to #2014-0904-5458s currently under construction. permit to make ready for laboratory tenants to be processed as future ti. this is a non-site permit therefore included in this permit are complete plans fo arch,struct & mep. all will be reviewed under the 2013 code.Details
alteration to #2014-0904-5458s currently under construction. permit to make ready for laboratory tenants to be processed as future ti. this is a non-site permit therefore included in this permit are complete plans fo arch,struct & mep. all will be reviewed under the 2013 code. | $30,000,000 | |
| Aug 2, 2017 | Completed final sign-off Nov 2018 | 2000 Bryant St | Farrell Design Build Co Inc | ground improvement work to improve soil for foundation support by means of drilled displacement columns. grade site to provide even level working surface for ddc install. reference to building site permit application no. 201406239109 s. maher ord applied.Details
ground improvement work to improve soil for foundation support by means of drilled displacement columns. grade site to provide even level working surface for ddc install. reference to building site permit application no. 201406239109 s. maher ord applied. | $1,500,000 |
| Jun 21, 2017 | Completed final sign-off May 2019 | 1699 Market St | Build Group Inc. | tower crane for (n) construction @ 1699 market st (ref pa #201406108024-s)Details
tower crane for (n) construction @ 1699 market st (ref pa #201406108024-s) | $100,000 |
| Dec 1, 2016 | Never finaled issued Dec 2016, no final | 1198 Valencia St | Js Sullivan Construction Inc | revision to pa#201507141495 & 201606281116, change 1/f wall @ line 1 from cmu to shotcrete, add drilled piers @ line h per structural plans. n/a ordinance #155-13Details
revision to pa#201507141495 & 201606281116, change 1/f wall @ line 1 from cmu to shotcrete, add drilled piers @ line h per structural plans. n/a ordinance #155-13 | $15,000 |
| Oct 20, 2016 | Completed final sign-off Aug 2018 | 150 Van Ness Av | Clark Construction Group Ca Lp | temporary construction. erection & operation of tower crane.Details
temporary construction. erection & operation of tower crane. | $50,000 |
| Jul 25, 2016 | Completed final sign-off Oct 2017 | 1075 Market St | Build Group Inc. | temporary tower crane for construction use. ref pa# 2014/05/28/6908-s. ** maher: n/a **Details
temporary tower crane for construction use. ref pa# 2014/05/28/6908-s. ** maher: n/a ** | $30,000 |
| May 24, 2016 | Completed final sign-off Sep 2016 | 100 Van Ness Av | revision to pa #201410108636: addition of structural steel supports for an existing cmu wall and framing over existing plaster wall both located on the east side of bldg, not visible from street. n/a maher ordinanceDetails
revision to pa #201410108636: addition of structural steel supports for an existing cmu wall and framing over existing plaster wall both located on the east side of bldg, not visible from street. n/a maher ordinance | $3,000 | |
| Nov 3, 2015 | Completed final sign-off Mar 2018 | 374 Harriet St | installation of new structural hvac platforms on roof of 374 harriet street & 75 boardman place. ** maher: compliance with ordinance no# 155-13 not required **Details
installation of new structural hvac platforms on roof of 374 harriet street & 75 boardman place. ** maher: compliance with ordinance no# 155-13 not required ** | $65,000 | |
| Nov 2, 2015 | Never finaled issued Nov 2016, no final | 88 Arkansas St | James E Roberts-Obayashi Corporation | to erect 5 stories, 1 basement, 127 dwelling units, mix use with commericial, maher ordinance.Details
to erect 5 stories, 1 basement, 127 dwelling units, mix use with commericial, maher ordinance. | $46,100,000 |
| Oct 15, 2015 | Completed final sign-off May 2016 | 2497 Golden Gate Av | Build Group Inc. | revision to 2015-06-30-0360 solely for the purpose of changing the structural system from concrete/smu/steel to cast-in-place concrete at owner's direction. maher ord n/a.Details
revision to 2015-06-30-0360 solely for the purpose of changing the structural system from concrete/smu/steel to cast-in-place concrete at owner's direction. maher ord n/a. | |
| Jul 8, 2015 | Completed final sign-off Jan 2024 | 1900 Mission St | Patrick Coakley Construction | erect 6-story building, type iiia over type ia, 11 dwelling units and (1) retail, with 1 basement.Details
erect 6-story building, type iiia over type ia, 11 dwelling units and (1) retail, with 1 basement. | $2,772,350 |
| Jul 8, 2015 | Completed final sign-off Jan 2024 | 1900 Mission St | Ace Drilling & Excavation | demolish 1-story, type 5, auto shop building.Details
demolish 1-story, type 5, auto shop building. | $10,000 |
| Feb 27, 2015 | Completed final sign-off Sep 2016 | 346 Potrero Av | Build Group Inc. | erect temporary construction crane for new building under pa#201311202405s.Details
erect temporary construction crane for new building under pa#201311202405s. | $70,000 |
| Nov 26, 2014 | Never finaled issued Feb 2015, no final | 144 King St | O'keeffe Construction Inc | one tower crane erection. new construction under site permit 2013-0628-0783. maher - n/a for maher ordinnance.Details
one tower crane erection. new construction under site permit 2013-0628-0783. maher - n/a for maher ordinnance. | $10,000 |
| Aug 8, 2014 | Completed final sign-off May 2015 | 1201 Tennessee St | Devcon Construction | demolish 2 stories storage. maher n/aDetails
demolish 2 stories storage. maher n/a | $200,000 |
| Aug 5, 2014 | Completed final sign-off Sep 2022 | 198 Valencia St | Crime Watch Security Sys Llc, Js Sullivan Construction Inc | to erect 5 stories, no basement, type 5-a, 28 units residential condo and commercial building. (r-2,m) ** maher: compliance with ordinance is required **Details
to erect 5 stories, no basement, type 5-a, 28 units residential condo and commercial building. (r-2,m) ** maher: compliance with ordinance is required ** | $3,000,000 |
| Aug 4, 2014 | Completed final sign-off Jun 2015 | 1000 California St | Bcci Construction Company | revision to approved pa 201311121685; maher n/aDetails
revision to approved pa 201311121685; maher n/a | $10,000 |
| Jun 12, 2014 | Completed final sign-off Nov 2020 | 1066 Market St | Swinerton Builders | to erect 14 stories, 2 basement, 303 residential & retail building. (r-2,a-2,b,s-2)Details
to erect 14 stories, 2 basement, 303 residential & retail building. (r-2,a-2,b,s-2) | $86,400,000 |
| May 28, 2014 | Completed final sign-off Feb 2018 | 1075 Market St | Build Group Inc. | to erect 8 stories, 1 basement of 90 dwelling units with commercial, car stacker parking, roof deck. ** maher: disturbance of at least 50 cu.yd. of soil. route to dph **Details
to erect 8 stories, 1 basement of 90 dwelling units with commercial, car stacker parking, roof deck. ** maher: disturbance of at least 50 cu.yd. of soil. route to dph ** | $27,000,000 |
| Mar 12, 2014 | Completed final sign-off May 2014 | 760 02nd St | Oliver & Company Inc. | revision to appl #2013.0531.8379: per building inspector requested that structural drawings be resubmitted. compliance with ordinance #155-13 not requiredDetails
revision to appl #2013.0531.8379: per building inspector requested that structural drawings be resubmitted. compliance with ordinance #155-13 not required | |
| Nov 20, 2013 | Completed final sign-off Dec 2016 | 346 Potrero Av | Build Group Inc. | to erect 9 stories, 1 basement, of 70 residential, retail, mix use building.Details
to erect 9 stories, 1 basement, of 70 residential, retail, mix use building. | $22,000,000 |
| Sep 12, 2013 | Completed final sign-off Mar 2016 | 1415 Mission St | Build Group Inc. | erect temporary construction tower crane fo rnew building under pa #2008.10.31.5586/s2.Details
erect temporary construction tower crane fo rnew building under pa #2008.10.31.5586/s2. | $80,000 |
| Jun 11, 2013 | Completed final sign-off Aug 2013 | 2770 Taylor St | Golden Gate Sign Company Inc. | relocate 1 sign, 1 column down towards jefferson st from present location.Details
relocate 1 sign, 1 column down towards jefferson st from present location. | $6,000 |
| May 16, 2013 | Never finaled issued May 2013, no final | 2770 Taylor St | Cci Com'l Constr & Improv**See 985808*** | structural permit for sign. ref app#201304255421Details
structural permit for sign. ref app#201304255421 | $40,000 |
| Feb 27, 2013 | Expired or cancelled expired May 2017 | 2770 Taylor St | 3rd floor remodel of e assembly space into new restaurant inlcuding new dining room, bar, and kitchen. new partitions, finishes, casework. exterior work seperate permit & change use to restaurant.Details
3rd floor remodel of e assembly space into new restaurant inlcuding new dining room, bar, and kitchen. new partitions, finishes, casework. exterior work seperate permit & change use to restaurant. | $500,000 | |
| Jan 25, 2013 | Expired or cancelled cancelled Apr 2013 | 100 Van Ness Av | Plant Construction Company Lp | erection of tower crane attached to existing buildingDetails
erection of tower crane attached to existing building | $200,000 |
| Dec 10, 2012 | Completed final sign-off Dec 2012 | 243 Pierce St | enclose (e) opening in wall between dining & living room w/ wood framing & gympsum as necessary. create (n) opening in wall adjacent to old opening. increase the clear opening of a passage way between living & parlor from 7'-2" to 10'-0". no exterior work is to be done.Details
enclose (e) opening in wall between dining & living room w/ wood framing & gympsum as necessary. create (n) opening in wall adjacent to old opening. increase the clear opening of a passage way between living & parlor from 7'-2" to 10'-0". no exterior work is to be done. | $2,000 | |
| Jul 10, 2012 | Completed final sign-off Feb 2013 | 333 Harrison St | Webcor Construction Lp | 4/f- revision to appl #2010.06.30.5679 for infill of p.t. slab blockout & encasing of 2 exposed p.t. cables in (e) sleeves.Details
4/f- revision to appl #2010.06.30.5679 for infill of p.t. slab blockout & encasing of 2 exposed p.t. cables in (e) sleeves. | |
| May 18, 2012 | Completed final sign-off Jul 2013 | 25 Dolores St | Granite Excavation & Demolition Inc | to demolish 1 story warehouse building.Details
to demolish 1 story warehouse building. | $300,000 |
| May 18, 2012 | Never finaled issued Dec 2012, no final | 25 Dolores St | Axis Construction, Build Group Inc. | erect four story 37 units apartment building.Details
erect four story 37 units apartment building. | $8,500,000 |
| Feb 21, 2012 | Completed final sign-off Oct 2012 | 1800 Van Ness Av | Build Group Inc. | demolish 2 stories, type 5, retail/office building.Details
demolish 2 stories, type 5, retail/office building. | $156,108 |
| Feb 3, 2012 | Expired or cancelled cancelled Nov 2022 | 178 Townsend St | James E Roberts-Obayashi Corporation | provide spa on roof deck shown on issued site permit & final addenda drawing under pa #2011.04.08.3769. mechanical under separate permit. (change of use under #2006.08.29.0851).Details
provide spa on roof deck shown on issued site permit & final addenda drawing under pa #2011.04.08.3769. mechanical under separate permit. (change of use under #2006.08.29.0851). | |
| Dec 5, 2011 | Expired or cancelled withdrawn Sep 2012 | 201 Alabama St | Plant Construction Company Lp | to document the seismic work previously completed under pa 200705010109, conforms w/ seismic requirt in the 2001 cbc w. sf amendments subject to review in current pa 201108182700. for record keeping purpose.Details
to document the seismic work previously completed under pa 200705010109, conforms w/ seismic requirt in the 2001 cbc w. sf amendments subject to review in current pa 201108182700. for record keeping purpose. | |
| Oct 31, 2011 | Completed final sign-off Dec 2011 | 255 Berry St | Lewis M Merlo Inc | saw cut and demo slab on ground floor 3'x4' to access broken pipe below slab. replace slab with rebar and concrete when complete.Details
saw cut and demo slab on ground floor 3'x4' to access broken pipe below slab. replace slab with rebar and concrete when complete. | $5,000 |
| Oct 27, 2011 | Completed final sign-off Feb 2013 | 333 Harrison St | Webcor Construction Lp | revision to pa#201006305679 s-1.drill piers will be added under the north end of the east wall at the lowest level. the slope will be back filled against the strengthened concrete wall. the pile caps and a stronger grade beam will be raised to the new higher level.Details
revision to pa#201006305679 s-1.drill piers will be added under the north end of the east wall at the lowest level. the slope will be back filled against the strengthened concrete wall. the pile caps and a stronger grade beam will be raised to the new higher level. | |
| Aug 18, 2011 | Completed final sign-off Sep 2012 | 201 Alabama St | Plant Construction Company Lp | phase 1 - tenant improvement of approx 15,045 sf of 1st floor storage, office and laundry space, including a new structural mechanical platform on the roof.Details
phase 1 - tenant improvement of approx 15,045 sf of 1st floor storage, office and laundry space, including a new structural mechanical platform on the roof. | $32,500 |
| Aug 18, 2011 | Completed final sign-off Aug 2012 | 201 Alabama St | phase 2 - tenant improvement of approx 18,964 sf of adminstrative space for animal service facility. this includes a new 7,889 sf 3rd floor.adding a communicating door on grid line 1. seismic upgrade is triggered due to increase in occupant load.Details
phase 2 - tenant improvement of approx 18,964 sf of adminstrative space for animal service facility. this includes a new 7,889 sf 3rd floor.adding a communicating door on grid line 1. seismic upgrade is triggered due to increase in occupant load. | $1,695,000 | |
| Aug 18, 2011 | Completed final sign-off Aug 2012 | 201 Alabama St | Plant Construction Company Lp | phase 3 - tenant improvement of approx 693 sf of animal shelter space which including a lift, stair, and a connection to (existing) sf/spca space next door.Details
phase 3 - tenant improvement of approx 693 sf of animal shelter space which including a lift, stair, and a connection to (existing) sf/spca space next door. | $28,000 |
| Dec 14, 2010 | Completed final sign-off Nov 2012 | 2235 03rd St | Nibbi Bros Assoc Inc. | erection and operation of tower crane located on jobsite per ab 023. ref arch 200907092309. foundation work for tower crane only under this permit.Details
erection and operation of tower crane located on jobsite per ab 023. ref arch 200907092309. foundation work for tower crane only under this permit. | $76,782 |
| Jun 30, 2010 | Completed final sign-off Feb 2013 | 333 Harrison St | erect type 1, retail, parking, and residential bldg.Details
erect type 1, retail, parking, and residential bldg. | $61,000,000 | |
| Apr 28, 2010 | Completed final sign-off Aug 2010 | 490 Jamestown Av | Devcon Construction | new field level suiteDetails
new field level suite | $118,000 |
| Dec 5, 2008 | Completed final sign-off Jul 2010 | 235 Montgomery St | Gci, Inc | partial floor ti for new tenant space for demo and new construction of doors/parttion/finishes. mech,el,l/s, sp to be submitted seperating this project is applying for leed platinum certificationDetails
partial floor ti for new tenant space for demo and new construction of doors/parttion/finishes. mech,el,l/s, sp to be submitted seperating this project is applying for leed platinum certification | $1,236,000 |
| Nov 13, 2008 | Never finaled issued Nov 2008, no final | 414 Jessie St | Martin Building Co | install hardpiped heaters on existing arbor for cafe tables & chairs area (permit no. 07tc-0302)nin front of plaza, ref pa #200709132611Details
install hardpiped heaters on existing arbor for cafe tables & chairs area (permit no. 07tc-0302)nin front of plaza, ref pa #200709132611 | $7,000 |
| Aug 28, 2008 | Completed final sign-off Dec 2008 | 560 Mission St | Gci, Inc | floor 6th & 7th - demolition under ab-017 to create vacant space for subsequant t.i. work on pa #200808068494 (currently under review).Details
floor 6th & 7th - demolition under ab-017 to create vacant space for subsequant t.i. work on pa #200808068494 (currently under review). | $20,000 |
| Apr 2, 2008 | Never finaled issued Jun 2008, no final | 55 Concourse Dr | (e) interior spaces to be built out for use as retail. some (e) walls and doors to be removed and/or replaced. mep under seperate permit, 1st time tenant improvementDetails
(e) interior spaces to be built out for use as retail. some (e) walls and doors to be removed and/or replaced. mep under seperate permit, 1st time tenant improvement | $800,000 | |
| Nov 8, 2007 | Completed final sign-off Aug 2009 | 353 King St | assemble, operate temporary tower cranes (2) on a vacant lot. new construction pa# 2001.05.30.0277 was issued.Details
assemble, operate temporary tower cranes (2) on a vacant lot. new construction pa# 2001.05.30.0277 was issued. | $60,000 | |
| Jun 25, 2007 | Completed final sign-off Jan 2008 | 1300 Eddy St | Ravano & Cooney Const Co Inc | bldg# 6. revision to pa 2007/03/12/6027, changing deck structural connection details only.Details
bldg# 6. revision to pa 2007/03/12/6027, changing deck structural connection details only. | |
| Sep 27, 2006 | Completed final sign-off Feb 2011 | 724 Van Ness Av | to comply with complaint 9-14-06 shotcrete in lieu of cast in place concrete appl#200205025568Details
to comply with complaint 9-14-06 shotcrete in lieu of cast in place concrete appl#200205025568 | ||
| Sep 15, 2006 | Never finaled issued Feb 2007, no final | 750 Van Ness Av | Embarcadero Enterprises Corporation | erection of tower crane.Details
erection of tower crane. | $27,000 |
| Jan 4, 2006 | Completed final sign-off Oct 2007 | 235 Berry St | alteration to issued site permit & addendan pa# 2004/02/02/5349 's'. including alteration to add # 2. super structure, conextect, exterior framing, exit stair, cement board panel.Details
alteration to issued site permit & addendan pa# 2004/02/02/5349 's'. including alteration to add # 2. super structure, conextect, exterior framing, exit stair, cement board panel. | $27,000 | |
| Dec 22, 2005 | Expired or cancelled expired Jul 2007 | 475 26th Av | construct new 4/5 story apt. (sr. bldg. revision permit#2004/10/22/7526 for underpining (e) bldg @ 475 26th ave (no sidewalk work).Details
construct new 4/5 story apt. (sr. bldg. revision permit#2004/10/22/7526 for underpining (e) bldg @ 475 26th ave (no sidewalk work). | ||
| Dec 22, 2005 | Expired or cancelled expired Jul 2007 | 463 26th Av | revision to permit#200410227534. addresses under this appl are#463-473 26th ave for shoring and underpinningDetails
revision to permit#200410227534. addresses under this appl are#463-473 26th ave for shoring and underpinning | ||
| Jun 15, 2005 | Expired or cancelled expired Mar 2006 | 110 Edgewood Av | D Cappelletti & Sons Inc | add bay window at rear for kitchen -level2.alter wall bet kitchen&dining.remove steel beam at level2Details
add bay window at rear for kitchen -level2.alter wall bet kitchen&dining.remove steel beam at level2 | |
| Mar 2, 2005 | Expired or cancelled withdrawn Sep 2006 | 235 Berry St | structural alterations to appl#200103023320 & 200412020572Details
structural alterations to appl#200103023320 & 200412020572 | $300,001 | |
| Jan 10, 2005 | Completed final sign-off Oct 2006 | 301 King St | provide indicator piles. reference site pa#200105249986s.Details
provide indicator piles. reference site pa#200105249986s. | $15,000 | |
| Jan 10, 2005 | Completed final sign-off Nov 2006 | 351 King St | provide indicator piles. reference site pa 200210290145s.Details
provide indicator piles. reference site pa 200210290145s. | $35,000 | |
| May 24, 2002 | Expired or cancelled expired Sep 2005 | 428 03rd St | voluntary seismic upgrade additional to complete construction per appl#200101311088Details
voluntary seismic upgrade additional to complete construction per appl#200101311088 | $35,000 |