Permit GraphShortlistSan Francisco building permits since 2000

Block 3510, lot 001

1401 Mission St

City’s use
Multi-Family Residential
Built
2016
Stories
13
Units
122
Building
138,512 sq ft
Lot
11,424 sq ft
Zoning
C3G
Construction type
NA

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

17 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 23, 2018Completed
final sign-off Dec 2018
1401 Mission StCuan Constructionsuite 1: 1st time t. i. of leased space on ground floor, recent construction mixed-use bldg, (n) interior metal frame partitions, finishes & lighting modification of (e) plumbing
Details
Permit
201803234516
Status
complete
Filed
Mar 23, 2018
Permit issued
May 4, 2018
Final sign-off
Dec 11, 2018
Declared cost
$80,000
Address
1401 Mission St

suite 1: 1st time t. i. of leased space on ground floor, recent construction mixed-use bldg, (n) interior metal frame partitions, finishes & lighting modification of (e) plumbing

Open the permit page

$80,000
Apr 12, 2016Completed
final sign-off Apr 2016
1401 Mission StMarketplace Increvised egress sign plan, ref. application issued 201511122425; maher n/a
Details
Permit
201604124549
Status
complete
Filed
Apr 12, 2016
Permit issued
Apr 12, 2016
Final sign-off
Apr 28, 2016
Declared cost
$10,000
Address
1401 Mission St

revised egress sign plan, ref. application issued 201511122425; maher n/a

Open the permit page

$10,000
Feb 8, 2016Completed
final sign-off Mar 2016
1415 Mission StBuild Group Inc.rev.to address an as built discrepancy found in the floor slab elevation @ the loading aera 117,the revision changes the designated accessible route from the east egress to the west egress.the exiiting diagram based on the occupancy analysis for the spaces remains (pa 200810315586s)n/a for maher
Details
Permit
201602089079
Status
complete
Filed
Feb 8, 2016
Permit issued
Feb 8, 2016
Final sign-off
Mar 24, 2016
Address
1415 Mission St

rev.to address an as built discrepancy found in the floor slab elevation @ the loading aera 117,the revision changes the designated accessible route from the east egress to the west egress.the exiiting diagram based on the occupancy analysis for the spaces remains (pa 200810315586s)n/a for maher

Open the permit page

Jan 15, 2016Never finaled
issued Jan 2016, no final
1401 Mission Ststreet space
Details
Permit
M655407
Status
issued
Filed
Jan 15, 2016
Permit issued
Jan 15, 2016
Address
1401 Mission St

street space

Open the permit page

Dec 31, 2015Completed
final sign-off Mar 2016
1415 Mission StBuild Group Inc.van accessible parking stall at b1 relocated to clear the overhead utility/life safety obstruction along gridline 3 (that encroaches on the required 8'2" height clearance) and 1 accesssible stall relocated to b2. ref app #200810315586s. maher n/a
Details
Permit
201512316223
Status
complete
Filed
Dec 31, 2015
Permit issued
Jan 27, 2016
Final sign-off
Mar 24, 2016
Declared cost
$1,000
Address
1415 Mission St

van accessible parking stall at b1 relocated to clear the overhead utility/life safety obstruction along gridline 3 (that encroaches on the required 8'2" height clearance) and 1 accesssible stall relocated to b2. ref app #200810315586s. maher n/a

Open the permit page

$1,000
Nov 12, 2015Completed
final sign-off May 2016
1401 Mission StMarketplace Incinstall evacuation map signs from b2 to roof. n/a maher ordinance
Details
Permit
201511122425
Status
complete
Filed
Nov 12, 2015
Permit issued
Nov 19, 2015
Final sign-off
May 12, 2016
Declared cost
$100,000
Address
1401 Mission St

install evacuation map signs from b2 to roof. n/a maher ordinance

Open the permit page

$100,000
Apr 8, 2015Completed
final sign-off Mar 2016
1415 Mission StBuild Group Inc.revision to approved pa# 2008/10/31/5586 s-3 (architectural). lower garage door clearance @ loading area from 12'-0" to 11'-0". ** maher: compliance with ordinance no# 155-13 not required **
Details
Permit
201504083073
Status
complete
Filed
Apr 8, 2015
Permit issued
May 20, 2015
Final sign-off
Mar 16, 2016
Address
1415 Mission St

revision to approved pa# 2008/10/31/5586 s-3 (architectural). lower garage door clearance @ loading area from 12'-0" to 11'-0". ** maher: compliance with ordinance no# 155-13 not required **

Open the permit page

Oct 29, 2014Never finaled
issued Nov 2014, no final
1415 Mission Ststreet space
Details
Permit
M531847
Status
issued
Filed
Oct 29, 2014
Permit issued
Nov 4, 2014
Address
1415 Mission St

street space

Open the permit page

Sep 10, 2014Completed
final sign-off Mar 2016
1415 Mission StBuild Group Inc.interior & non-structural revision to level one floor only uner construction. no changes to height, bulk sq. footage or occupancy classification authorized under approved pa# 2008/10/31/5586 's'. relocate retail, fcc, mail room & provide leasing offices, 1 additional bathroom, workroom & office.
Details
Permit
201409105967
Status
complete
Filed
Sep 10, 2014
Permit issued
Jan 21, 2015
Final sign-off
Mar 23, 2016
Declared cost
$10,000
Address
1415 Mission St

interior & non-structural revision to level one floor only uner construction. no changes to height, bulk sq. footage or occupancy classification authorized under approved pa# 2008/10/31/5586 's'. relocate retail, fcc, mail room & provide leasing offices, 1 additional bathroom, workroom & office.

Open the permit page

$10,000
Nov 25, 2013Never finaled
issued Nov 2013, no final
1415 Mission Ststreet space & sidewalk repair
Details
Permit
M446827
Status
issued
Filed
Nov 25, 2013
Permit issued
Nov 25, 2013
Address
1415 Mission St

street space & sidewalk repair

Open the permit page

Nov 4, 2013Completed
final sign-off Mar 2016
1415 Mission Strevision to 201304224104
Details
Permit
201311041027
Status
complete
Filed
Nov 4, 2013
Permit issued
Jan 3, 2014
Final sign-off
Mar 23, 2016
Address
1415 Mission St

revision to 201304224104

Open the permit page

Sep 16, 2013Never finaled
issued Sep 2013, no final
1401 Mission Stper pa #200810315586, add address for residential entrance to block 3510, lot 001 as; 1401 mission st.
Details
Permit
M426427
Status
issued
Filed
Sep 16, 2013
Permit issued
Sep 16, 2013
Address
1401 Mission St

per pa #200810315586, add address for residential entrance to block 3510, lot 001 as; 1401 mission st.

Open the permit page

Sep 12, 2013Completed
final sign-off Mar 2016
1415 Mission StBuild Group Inc.erect temporary construction tower crane fo rnew building under pa #2008.10.31.5586/s2.
Details
Permit
201309126613
Status
complete
Filed
Sep 12, 2013
Permit issued
Sep 18, 2013
Final sign-off
Mar 16, 2016
Declared cost
$80,000
Address
1415 Mission St

erect temporary construction tower crane fo rnew building under pa #2008.10.31.5586/s2.

Open the permit page

$80,000
Apr 22, 2013Completed
final sign-off Mar 2016
1415 Mission StBuild Group Inc.excavation shoring for new construction on the same address-1415 mission st. (ref pa#200810315586s)
Details
Permit
201304225104
Status
complete
Filed
Apr 22, 2013
Permit issued
Aug 7, 2013
Final sign-off
Mar 23, 2016
Declared cost
$250,000
Address
1415 Mission St

excavation shoring for new construction on the same address-1415 mission st. (ref pa#200810315586s)

Open the permit page

$250,000
Apr 22, 2013Completed
final sign-off Mar 2016
1415 Mission StBuild Group Inc.soil cement shoring as a result of the new construction on 1415 mission st project. (reference pa#200810315586s.
Details
Permit
201304225100
Status
complete
Filed
Apr 22, 2013
Permit issued
Aug 7, 2013
Final sign-off
Mar 23, 2016
Declared cost
$400,000
Address
1415 Mission St

soil cement shoring as a result of the new construction on 1415 mission st project. (reference pa#200810315586s.

Open the permit page

$400,000
Nov 5, 2008Completed
final sign-off May 2016
1415 Mission StBuild Group Inc.total demo of single-story concrete/masonry commercial structure
Details
Permit
200811055926
Status
complete
Filed
Nov 5, 2008
Permit issued
Aug 7, 2013
Final sign-off
May 27, 2016
Declared cost
$60,000
Address
1415 Mission St

total demo of single-story concrete/masonry commercial structure

Open the permit page

$60,000
Oct 31, 2008Completed
final sign-off May 2016
1415 Mission StBuild Group Inc.to erect 13 stories, 2 basements, 121 residential unit with commercial and parking building.
Details
Permit
200810315586
Status
complete
Filed
Oct 31, 2008
Permit issued
Jul 22, 2013
Final sign-off
May 27, 2016
Declared cost
$4,130,000
Address
1415 Mission St

to erect 13 stories, 2 basements, 121 residential unit with commercial and parking building.

Open the permit page

$4,130,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Build Group Inc. (9), Marketplace Inc (2), Cuan Construction
Architects
Alex Asli (3), Clark Manus, James David Whitfield, Ron Rusell
Engineers
Timothy Mathison (3), Kevin Menninger

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.