Block 3534, lot 069
25 Dolores St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 20, 2014 | Completed final sign-off Oct 2018 | 25 Dolores St | Eagle Bay Enterprises, Inc (Dba Garnett | install evauation sings on floors: basement, 1st to 4th floor, roof. n/a maher ordinanceDetails
install evauation sings on floors: basement, 1st to 4th floor, roof. n/a maher ordinance | $5,700 |
| Aug 15, 2014 | Expired or cancelled expired Oct 2025 | 25 Dolores St | Build Group Inc. | additional work to 201205180774; particularly addition of design of staircase #1 (at the north elevation) also staircase #2 (south elevation), pls refer to dwg e.1 & e.2 for staircase locations; maher n/aDetails
additional work to 201205180774; particularly addition of design of staircase #1 (at the north elevation) also staircase #2 (south elevation), pls refer to dwg e.1 & e.2 for staircase locations; maher n/a | |
| Jul 14, 2014 | Never finaled issued Jul 2014, no final | 25 Dolores St | Build Group Inc. | revision appl. 2012.0518.0774. revision to the general notes of water closet dimension from wall to grab bar and 42"x48" shower to comply with cbc 1134a.6. maher n/a.Details
revision appl. 2012.0518.0774. revision to the general notes of water closet dimension from wall to grab bar and 42"x48" shower to comply with cbc 1134a.6. maher n/a. | |
| Jan 21, 2014 | Never finaled issued Jan 2014, no final | 25 Dolores St | street space prmit (201205180774)Details
street space prmit (201205180774) | ||
| Jan 13, 2014 | Never finaled filed Jan 2014, never issued | 25 Dolores St | street space permitDetails
street space permit | ||
| Nov 26, 2013 | Completed final sign-off Oct 2018 | 25 Dolores St | Bay Mountain Air | install garage exhaust system, install kitchen and bath exhaust system, install co2 monitor system, install 2 duct for osa. new bldg pa# 2012/05/18/0744 architectural permit approved. ** maher: compliance with ordinance no# 155-13 not required **Details
install garage exhaust system, install kitchen and bath exhaust system, install co2 monitor system, install 2 duct for osa. new bldg pa# 2012/05/18/0744 architectural permit approved. ** maher: compliance with ordinance no# 155-13 not required ** | $200,000 |
| Aug 27, 2013 | Never finaled issued Sep 2014, no final | 25 Dolores St | Build Group Inc. | separate building & minor sidewalk encroachment permits for encroachment on sidewalk. in the event, the encroachment is not approved, the entrances will be re-designed. (ref approved pa# 2012/05/18/0774). n/a for maher ordinance.Details
separate building & minor sidewalk encroachment permits for encroachment on sidewalk. in the event, the encroachment is not approved, the entrances will be re-designed. (ref approved pa# 2012/05/18/0774). n/a for maher ordinance. | |
| Jun 13, 2013 | Never finaled issued Oct 2013, no final | 25 Dolores St | Aquamatic Fire Protection | install new underground piping and new riser for 4 floors and basement. standpipe system installed.install (106) upright sprinklers/(564) pendent sprinklers/(26) sidewall sprinklers. provide all bracing per nfpa and seismic bracing calcs. provide calc plates on riser. standpipe.Details
install new underground piping and new riser for 4 floors and basement. standpipe system installed.install (106) upright sprinklers/(564) pendent sprinklers/(26) sidewall sprinklers. provide all bracing per nfpa and seismic bracing calcs. provide calc plates on riser. standpipe. | $166,900 |
| Dec 27, 2012 | Never finaled issued Feb 2013, no final | 25 Dolores St | Granite Excavation & Demolition Inc | shoring for excavation at 25 dolores st project. (reference: approved permit #201205180774)Details
shoring for excavation at 25 dolores st project. (reference: approved permit #201205180774) | $250,000 |
| May 18, 2012 | Never finaled issued Dec 2012, no final | 25 Dolores St | Axis Construction, Build Group Inc. | erect four story 37 units apartment building.Details
erect four story 37 units apartment building. | $8,500,000 |
| May 18, 2012 | Completed final sign-off Jul 2013 | 25 Dolores St | Granite Excavation & Demolition Inc | to demolish 1 story warehouse building.Details
to demolish 1 story warehouse building. | $300,000 |
| Jul 2, 2003 | Expired or cancelled expired Dec 2006 | 25 Dolores St | Structural Renovations, Inc. | seismic upgrade of umb structureDetails
seismic upgrade of umb structure | $140,000 |
| Jan 25, 2000 | Completed final sign-off Oct 2000 | 35 Dolores St | Quality Bay Construction Inc. | parapet bracingDetails
parapet bracing | $15,000 |
| Jan 25, 2000 | Completed final sign-off Oct 2000 | 25 Dolores St | Quality Bay Construction Inc. | parapet bracingDetails
parapet bracing | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Build Group Inc. (4), Granite Excavation & Demolition Inc (2), Quality Bay Construction Inc. (2), Aquamatic Fire Protection, Axis Construction, Bay Mountain Air, Eagle Bay Enterprises, Inc (Dba Garnett, Structural Renovations, Inc.
- Architects
- Levy Design Partners (3), Rodrigo Santos, Sal Italiano
- Engineers
- Kevin L Menninger (2), Louay A. Shamrookh (2), Ben Cao, Toby Levy