Toby Stella Levy
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Levy Design Partners
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Sep 2025
107 permits since 2000 (architect on 102 permits, authorized agent-others on 3 permits, engineer on 2 permits): 64 completed, 29 never finaled, 14 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 107.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2025 | Completed final sign-off Sep 2026 | 421 Leavenworth St | Rcm Fire Protection Inc. | proposed fire sprinkler work is to install a complete operational speaker system for full coverage of the rehabilitated 47 public housing apartment and community room. ref #202305057244Details
proposed fire sprinkler work is to install a complete operational speaker system for full coverage of the rehabilitated 47 public housing apartment and community room. ref #202305057244 | $475,000 |
| Sep 13, 2023 | Completed final sign-off Jun 2025 | 388 Beale St | Achill Beg Construction Inc | 4th fl - convert 1700 sf of storage area into an assembly area. area will consist of unfixed seating, tables, games and tvDetails
4th fl - convert 1700 sf of storage area into an assembly area. area will consist of unfixed seating, tables, games and tv | $325,000 |
| Aug 3, 2023 | Completed final sign-off Oct 2023 | 557 Pacific Av | Golden Vector Stars Corporation | commercial ti. reconfigure (e) toilet room, replace (e) kitchen cabinets. non-load bearing wall partitions. no exterior work. no work in public right of way.Details
commercial ti. reconfigure (e) toilet room, replace (e) kitchen cabinets. non-load bearing wall partitions. no exterior work. no work in public right of way. | $25,000 |
| Jun 21, 2022 | Completed final sign-off Sep 2022 | 388 Beale St | Dettaglio Construction Inc Dba Dci Const | revision to pa 201901180804 to revised bathroom doors, eliminate wind wall adjacent to refrigerator. revise closet doors. add door uc6 and ue3 to door schedule.Details
revision to pa 201901180804 to revised bathroom doors, eliminate wind wall adjacent to refrigerator. revise closet doors. add door uc6 and ue3 to door schedule. | |
| Apr 11, 2022 | Completed final sign-off Sep 2022 | 1288 Howard St | Achill Beg Construction Inc | installation of an operable gate at each end of the mid-block alley that will be in closed position only from 10pm to 6am daily, (ref pa# 2014-0606-7752s)Details
installation of an operable gate at each end of the mid-block alley that will be in closed position only from 10pm to 6am daily, (ref pa# 2014-0606-7752s) | $5,000 |
| Jan 28, 2022 | Completed final sign-off Jun 2025 | 388 Beale St | Achill Beg Construction Inc | change of use - retail to apartments. add 7 units w/ 4 mezz units & (3) 2-story units. 7 units are studios and 1-two bedrm. (n) units are added within envelope at ground level. retain (e) openings, replace (e) storefront glazing w/ new, keep (e) design intent.Details
change of use - retail to apartments. add 7 units w/ 4 mezz units & (3) 2-story units. 7 units are studios and 1-two bedrm. (n) units are added within envelope at ground level. retain (e) openings, replace (e) storefront glazing w/ new, keep (e) design intent. | $2,661,221 |
| Oct 12, 2021 | Completed final sign-off Sep 2022 | 388 Beale St | Dettaglio Construction Inc Dba Dci Const | 3rd and 4th floor: as built submittal to provide new fire extinguisher cabinets and revised parking garage dimentions. ref app#201901180804Details
3rd and 4th floor: as built submittal to provide new fire extinguisher cabinets and revised parking garage dimentions. ref app#201901180804 | |
| Oct 12, 2021 | Never finaled issued Dec 2021, no final | 290 Malosi St | Nibbi Bros Assoc Inc. | rev to pa 201806202372. revise bathroom from bathtubs to rolling showers in units, 302a, 304a, 310a, 302b, 307b, 309b, 402a, 404a, 410a, 402b, 408b, 410b, 502a, 504a, 510a, 502b, 508b, 510b. per exception of cbc 11-b-608.4 shower seats will not be provided in residential units provided that reinforcDetails
rev to pa 201806202372. revise bathroom from bathtubs to rolling showers in units, 302a, 304a, 310a, 302b, 307b, 309b, 402a, 404a, 410a, 402b, 408b, 410b, 502a, 504a, 510a, 502b, 508b, 510b. per exception of cbc 11-b-608.4 shower seats will not be provided in residential units provided that reinforc | $10,000 |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 599 Crestmont Dr | building 10 - to erect a type 3-a, 4-story, two-family dwelling with no basement.Details
building 10 - to erect a type 3-a, 4-story, two-family dwelling with no basement. | $1,292,500 | |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 599 Crestmont Dr | building 6 - to erect a type 3-a, 4-story, two-family dwelling with no basement.Details
building 6 - to erect a type 3-a, 4-story, two-family dwelling with no basement. | $1,292,500 | |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 599 Crestmont Dr | building 4 - to erect a 3 story, 1 dwelling, no basement bldg. type 3-aDetails
building 4 - to erect a 3 story, 1 dwelling, no basement bldg. type 3-a | $921,000 | |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 599 Crestmont Dr | building 9 - to erect a type 3-a, 4-story, two-family dwelling with no basement.Details
building 9 - to erect a type 3-a, 4-story, two-family dwelling with no basement. | $1,292,500 | |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 599 Crestmont Dr | building 11 - to erect a type 3-a, 4-story, two-family dwelling with no basement.Details
building 11 - to erect a type 3-a, 4-story, two-family dwelling with no basement. | $1,292,500 | |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 599 Crestmont Dr | building 12 - to erect a type 3-a, 3-story, single family dwelling with no basement.Details
building 12 - to erect a type 3-a, 3-story, single family dwelling with no basement. | $921,000 | |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 599 Crestmont Dr | building 8 - to erect a type 3-a, 4-story, two-family dwelling with no basement.Details
building 8 - to erect a type 3-a, 4-story, two-family dwelling with no basement. | $1,292,500 | |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 599 Crestmont Dr | building 2 - to erect a 3 story, 1 dwelling, no basement bldg. type 3-aDetails
building 2 - to erect a 3 story, 1 dwelling, no basement bldg. type 3-a | $921,000 | |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 599 Crestmont Dr | building 13 - to erect a 3-story, type 3a, 1o residential unit building w/ 1 basement.Details
building 13 - to erect a 3-story, type 3a, 1o residential unit building w/ 1 basement. | $9,233,000 | |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 599 Crestmont Dr | building 1 - to erect a 3 story, 1 dwelling, no basement bldg. type 3-aDetails
building 1 - to erect a 3 story, 1 dwelling, no basement bldg. type 3-a | $921,000 | |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 599 Crestmont Dr | building 5 - to erect a type 3-a, 4-story, two-family dwelling with no basement.Details
building 5 - to erect a type 3-a, 4-story, two-family dwelling with no basement. | $1,292,500 | |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 599 Crestmont Dr | building 7 - to erect a type 3-a, 4-story, two-family dwelling with no basement.Details
building 7 - to erect a type 3-a, 4-story, two-family dwelling with no basement. | $1,292,500 | |
| Mar 18, 2019 | Completed final sign-off Jul 2020 | 1150 03rd St | Nibbi Bros Assoc Inc. | sffd request submit addendum 4 of 201612215523s6 as a separate permit since it was not routed to sffd. this separate permit is only for fire alarm. mr. sagiv weiss-ishai requested is only routed to him. maher n/aDetails
sffd request submit addendum 4 of 201612215523s6 as a separate permit since it was not routed to sffd. this separate permit is only for fire alarm. mr. sagiv weiss-ishai requested is only routed to him. maher n/a | |
| Feb 13, 2019 | Never finaled issued Mar 2020, no final | 599 Crestmont Dr | site improvement work to include grading, and drainage, stormwater control, construction of new private street, retaining walls, and side walk, continuation of case no. 2004.0093c.Details
site improvement work to include grading, and drainage, stormwater control, construction of new private street, retaining walls, and side walk, continuation of case no. 2004.0093c. | $1,400,000 | |
| Jan 18, 2019 | Completed final sign-off Sep 2022 | 388 Beale St | Dettaglio Construction Inc Dba Dci Const | at (e) garage levels 3 & 4; removal of parking stalls & addition of 13 dwelling units (1 adu per ordinance# 162-16 and 12 regular units).Details
at (e) garage levels 3 & 4; removal of parking stalls & addition of 13 dwelling units (1 adu per ordinance# 162-16 and 12 regular units). | $2,743,044 |
| Dec 27, 2018 | Never finaled filed Dec 2018, never issued | 220 09th St | podium. to erect a type-1, 1 story, 3-dwelling unit with parking and commercial.Details
podium. to erect a type-1, 1 story, 3-dwelling unit with parking and commercial. | $3,000,000 | |
| Dec 27, 2018 | Never finaled filed Dec 2018, never issued | 220 09th St | building 2. to erect type iiia, 5-story, 20 dwelling units building with no basement.Details
building 2. to erect type iiia, 5-story, 20 dwelling units building with no basement. | $5,000,000 | |
| Dec 27, 2018 | Never finaled filed Dec 2018, never issued | 220 09th St | building 1. to erect a type v, 5-story, 41 dwelling unit building with no basement.Details
building 1. to erect a type v, 5-story, 41 dwelling unit building with no basement. | $10,000,000 | |
| Jun 20, 2018 | Completed final sign-off Jun 2019 | 1 Blythdale Av | Nibbi Bros Assoc Inc. | priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (49 - 59 blythdale avenue).Details
priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (49 - 59 blythdale avenue). | $20,000 |
| Jun 20, 2018 | Completed final sign-off Jun 2019 | 1 Blythdale Av | Nibbi Bros Assoc Inc. | priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (42 - 56 blythdale ave).Details
priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (42 - 56 blythdale ave). | $20,000 |
| Jun 20, 2018 | Completed final sign-off Jun 2019 | 1 Blythdale Av | Nibbi Bros Assoc Inc. | priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (65 - 79 blythdale avenue).Details
priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (65 - 79 blythdale avenue). | $20,000 |
| Jun 20, 2018 | Completed final sign-off Jun 2019 | 1 Blythdale Av | Nibbi Bros Assoc Inc. | priority processing. demolish 2-story, type 5, 0 basement, 4 units apartment builidng. (58 - 64 blythdale ave).Details
priority processing. demolish 2-story, type 5, 0 basement, 4 units apartment builidng. (58 - 64 blythdale ave). | $20,000 |
| Jun 20, 2018 | Completed final sign-off Jun 2019 | 1 Blythdale Av | Nibbi Bros Assoc Inc. | priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (17 - 31 blythdale ave).Details
priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (17 - 31 blythdale ave). | $20,000 |
| Jun 20, 2018 | Completed final sign-off Jun 2019 | 1 Blythdale Av | Nibbi Bros Assoc Inc. | priority processing. demolish 2-story, type 5, 0 basement, 4 units apartment builidng. (33 - 39 blythdale ave).Details
priority processing. demolish 2-story, type 5, 0 basement, 4 units apartment builidng. (33 - 39 blythdale ave). | $20,000 |
| Jun 20, 2018 | Completed final sign-off Jun 2019 | 1 Blythdale Av | Nibbi Bros Assoc Inc. | priority processing. demolish 2-story, type 5, 0 basement, 4 units apartment builidng. (34 -40 blythdale ave).Details
priority processing. demolish 2-story, type 5, 0 basement, 4 units apartment builidng. (34 -40 blythdale ave). | $20,000 |
| Jun 20, 2018 | Completed final sign-off Jun 2019 | 1 Blythdale Av | Nibbi Bros Assoc Inc. | priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (66 - 80 blythdale ave).Details
priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (66 - 80 blythdale ave). | $20,000 |
| Jun 20, 2018 | Completed final sign-off Jun 2019 | 1 Blythdale Av | Nibbi Bros Assoc Inc. | priority processing. demolish 2-story, type 5, 0 basement, 12 units apartment builidng. (82-94, 94a, 96, 96a, 98 & 98a blythdale ave ).Details
priority processing. demolish 2-story, type 5, 0 basement, 12 units apartment builidng. (82-94, 94a, 96, 96a, 98 & 98a blythdale ave ). | $20,000 |
| Jun 20, 2018 | Completed final sign-off Jun 2019 | 1 Blythdale Av | Nibbi Bros Assoc Inc. | priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (9 - 11 blythdale ave).Details
priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (9 - 11 blythdale ave). | $20,000 |
| Jun 20, 2018 | Completed final sign-off Jun 2019 | 1 Blythdale Av | Nibbi Bros Assoc Inc. | priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (1617 - 1631 sunnydale ave).Details
priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (1617 - 1631 sunnydale ave). | $20,000 |
| Jun 20, 2018 | Completed final sign-off Jun 2019 | 1 Blythdale Av | Nibbi Bros Assoc Inc. | priority processing. demolish 2-story, type 5, 0 basement, 12 units apartment builidng. (220 - 242 hahn st).Details
priority processing. demolish 2-story, type 5, 0 basement, 12 units apartment builidng. (220 - 242 hahn st). | $20,000 |
| Jun 20, 2018 | Completed final sign-off Jun 2019 | 1 Blythdale Av | Nibbi Bros Assoc Inc. | priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (18 -32 blythdale ave).Details
priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (18 -32 blythdale ave). | $20,000 |
| Jun 20, 2018 | Completed final sign-off Jun 2022 | 242 Hahn St | Nibbi Bros Assoc Inc. | priority processing. erect 5-story, type 5-a over type 1-a, 1 basement, 167 dwelling units, parking, offices, community room building;Details
priority processing. erect 5-story, type 5-a over type 1-a, 1 basement, 167 dwelling units, parking, offices, community room building; | $70,000,000 |
| Jun 20, 2018 | Completed final sign-off Jun 2019 | 1 Blythdale Av | Nibbi Bros Assoc Inc. | priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (85 - 87 blythdale avenue & 101 - 111 santos street).Details
priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (85 - 87 blythdale avenue & 101 - 111 santos street). | $20,000 |
| Jun 20, 2018 | Completed final sign-off Jun 2019 | 1 Blythdale Av | Nibbi Bros Assoc Inc. | priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (1535 - 1549 sunnydale ave).Details
priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (1535 - 1549 sunnydale ave). | $20,000 |
| Jun 20, 2018 | Completed final sign-off Jun 2019 | 1 Blythdale Av | Nibbi Bros Assoc Inc. | priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (2 -16 blythdale ave).Details
priority processing. demolish 2-story, type 5, 0 basement, 8 units apartment builidng. (2 -16 blythdale ave). | $20,000 |
| May 25, 2018 | Never finaled filed May 2018, never issued | 108 South Park | vertical addition. seismic upgrade of (e) building. restore 1 residential unit. add 3 additional residential unit. 2 bedroom unit & 2 studio lofts. modify (e) 1st floor commercial space. ** maher: n/a **Details
vertical addition. seismic upgrade of (e) building. restore 1 residential unit. add 3 additional residential unit. 2 bedroom unit & 2 studio lofts. modify (e) 1st floor commercial space. ** maher: n/a ** | $200,000 | |
| Apr 10, 2018 | Completed final sign-off May 2018 | 2101 Mission St | A M Rocca Inc. | revision to app#201312033192: due to field conditions 2 new conc. shearwalls combined to single shearwall. plus as built construction details/sketches. n/a for maherDetails
revision to app#201312033192: due to field conditions 2 new conc. shearwalls combined to single shearwall. plus as built construction details/sketches. n/a for maher | |
| Feb 2, 2018 | Expired or cancelled cancelled Jan 2026 | 904 Steiner St | adding one residential unit with 2 bedrooms & 2 bath at (e) lower level and new rear horizontal extension.Details
adding one residential unit with 2 bedrooms & 2 bath at (e) lower level and new rear horizontal extension. | $100,000 | |
| Dec 20, 2017 | Completed final sign-off Feb 2018 | 1075 Market St | Build Group Inc. | revision to 201405286908 s3 - showing revised rooftop level fire table/bbq clearances and layoutDetails
revision to 201405286908 s3 - showing revised rooftop level fire table/bbq clearances and layout | $5,000 |
| Dec 12, 2017 | Never finaled issued Jan 2018, no final | 1750 Armstrong Av | A M Rocca Inc. | build 1 hour wall assemblies where required for fire separation. for occupancy separation between b & f1. maher naDetails
build 1 hour wall assemblies where required for fire separation. for occupancy separation between b & f1. maher na | $14,000 |
| Aug 17, 2017 | Expired or cancelled cancelled Oct 2024 | 668 Guerrero St | Citidev Inc. | demolition of a 1-story warehouse.Details
demolition of a 1-story warehouse. | $25,000 |
| Aug 15, 2017 | Completed final sign-off Jul 2018 | 2349 26th Av | Tai Shan Construction | comply w/ nov #201785901. legalize dwelling unit (unit b) on 1st fl by legalized as built kitchen per plan. unit included (2) bedroom, (2) bathrooms, living room & kitchen per unit legalization ordinace# 43-14Details
comply w/ nov #201785901. legalize dwelling unit (unit b) on 1st fl by legalized as built kitchen per plan. unit included (2) bedroom, (2) bathrooms, living room & kitchen per unit legalization ordinace# 43-14 | $20,000 |
| Aug 11, 2017 | Never finaled issued Aug 2017, no final | 3004 16th St | Lighthouse Electric | ti for title 24 electrical. ref #201707141867.Details
ti for title 24 electrical. ref #201707141867. | $20,000 |
| Jul 28, 2017 | Completed final sign-off Jan 2018 | 2101 Mission St | A M Rocca Inc. | #108: relocate of coffee counter as accessory use. maher naDetails
#108: relocate of coffee counter as accessory use. maher na | $12,500 |
| Jun 3, 2016 | Completed final sign-off Oct 2021 | 2101 Mission St | A M Rocca Inc. | revision to pa#201312033192 r-4 to relocate bathroom to allow seismic work, also dissassemble interior stairs to allow access to drilling equipment for seismic work. n/a ordinance #155-13Details
revision to pa#201312033192 r-4 to relocate bathroom to allow seismic work, also dissassemble interior stairs to allow access to drilling equipment for seismic work. n/a ordinance #155-13 | $30,000 |
| Mar 18, 2016 | Expired or cancelled cancelled Oct 2024 | 668 Guerrero St | Citidev Inc. | to erect 4 stories, no basement, 3 units residential building. ** maher: disturbance of at least 50 cu.yd. of soil; route to dph **Details
to erect 4 stories, no basement, 3 units residential building. ** maher: disturbance of at least 50 cu.yd. of soil; route to dph ** | $1,900,000 |
| Mar 16, 2016 | Expired or cancelled cancelled Jan 2026 | 3265 17th St | ground floor vacant retail suite 104- add ada bathrooms, non-load bearing walls for small retail room (#104a), new accessible kitchenette (no range). tenant improvement (#104a) obtain separate t.i. permit.Details
ground floor vacant retail suite 104- add ada bathrooms, non-load bearing walls for small retail room (#104a), new accessible kitchenette (no range). tenant improvement (#104a) obtain separate t.i. permit. | $15,000 | |
| Nov 10, 2015 | Completed final sign-off Jun 2016 | 2101 Mission St | suite 401, 402, 402a & 402b tenant improvements - accessibility upgrade of (e) restroom, new accessible wet bar, new room partitions. n/a maher ordinanceDetails
suite 401, 402, 402a & 402b tenant improvements - accessibility upgrade of (e) restroom, new accessible wet bar, new room partitions. n/a maher ordinance | $100,000 | |
| Jun 2, 2015 | Completed final sign-off Jun 2015 | 3265 17th St | suite 204: adding partial height partitions on 2nd floor to create art studio spaces. partitions are 7'-6" from floor to top. all work on 2nd floor only.Details
suite 204: adding partial height partitions on 2nd floor to create art studio spaces. partitions are 7'-6" from floor to top. all work on 2nd floor only. | $10,000 | |
| Apr 21, 2015 | Expired or cancelled cancelled Jan 2026 | 181 Lowell St | renovation of a private residence including reconfiguration of (e) stair at rear yard, (n) bedroom & bathroom in (e) garage, (n) deck @ rear yard.Details
renovation of a private residence including reconfiguration of (e) stair at rear yard, (n) bedroom & bathroom in (e) garage, (n) deck @ rear yard. | $20,000 | |
| Feb 5, 2015 | Completed final sign-off Nov 2015 | 1 South Park | Citidev Inc. | #407 - revision to appl #201211093988: remove bathroom #2 & closet to create (n) office. remove master bedroom closet to extend master bath. install connecting door between master bedroom to (n) dressing room.Details
#407 - revision to appl #201211093988: remove bathroom #2 & closet to create (n) office. remove master bedroom closet to extend master bath. install connecting door between master bedroom to (n) dressing room. | $180,000 |
| Jan 16, 2015 | Expired or cancelled cancelled Jan 2026 | 2101 Mission St | move entrance to left, close existing entrance. n/a ordinance #155-13.Details
move entrance to left, close existing entrance. n/a ordinance #155-13. | $2,000 | |
| Aug 15, 2014 | Expired or cancelled expired Oct 2025 | 25 Dolores St | Build Group Inc. | additional work to 201205180774; particularly addition of design of staircase #1 (at the north elevation) also staircase #2 (south elevation), pls refer to dwg e.1 & e.2 for staircase locations; maher n/aDetails
additional work to 201205180774; particularly addition of design of staircase #1 (at the north elevation) also staircase #2 (south elevation), pls refer to dwg e.1 & e.2 for staircase locations; maher n/a | |
| Jun 9, 2014 | Never finaled issued Jun 2019, no final | 33 Norfolk St | to erect 5 stories, no basement, type v-a/i-a, 19 residential units and parking building. (r-2,s-2) ** maher: disturbance of at least 50 cu.yd. of soild, route to dph **Details
to erect 5 stories, no basement, type v-a/i-a, 19 residential units and parking building. (r-2,s-2) ** maher: disturbance of at least 50 cu.yd. of soild, route to dph ** | $4,887,516 | |
| Jun 9, 2014 | Never finaled issued Nov 2019, no final | 33 Norfolk St | Maan Global Development | to demolish 2 storire, type 5, office building.Details
to demolish 2 storire, type 5, office building. | $25,000 |
| Jun 6, 2014 | Completed final sign-off Sep 2022 | 1298 Howard St | Achill Beg Construction Inc, Amplex Electrical Inc | to erect 5 stories, 1 basement, type 1-a & v-a, 129 residential units with commercial & parking. (r-2,m,b,s-2) comply w/ ordinance no. 155-13 required.Details
to erect 5 stories, 1 basement, type 1-a & v-a, 129 residential units with commercial & parking. (r-2,m,b,s-2) comply w/ ordinance no. 155-13 required. | $34,000,000 |
| May 28, 2014 | Completed final sign-off Feb 2018 | 1075 Market St | Build Group Inc. | to erect 8 stories, 1 basement of 90 dwelling units with commercial, car stacker parking, roof deck. ** maher: disturbance of at least 50 cu.yd. of soil. route to dph **Details
to erect 8 stories, 1 basement of 90 dwelling units with commercial, car stacker parking, roof deck. ** maher: disturbance of at least 50 cu.yd. of soil. route to dph ** | $27,000,000 |
| Apr 24, 2014 | Completed final sign-off May 2014 | 1370 Harrison St | Sausalito Construction Inc. | tenant improvements including (n) closets, (n) conference rooms, (n) lighting. maher ordinance n/a.Details
tenant improvements including (n) closets, (n) conference rooms, (n) lighting. maher ordinance n/a. | $20,000 |
| Dec 3, 2013 | Completed final sign-off May 2018 | 2101 Mission St | A M Rocca Inc. | vouluntary seismic retrofit of the existing (4) story plus basement commercial building. no changes to the exterior of the buildling.Details
vouluntary seismic retrofit of the existing (4) story plus basement commercial building. no changes to the exterior of the buildling. | $1,900,000 |
| Nov 27, 2013 | Completed final sign-off Dec 2014 | 1 Ventura Av | A M Rocca Inc. | convert storage space to living bedroom, bathroom & family room per plans. relace vinyl windows with marvin wood windows, install new gas fireplaceDetails
convert storage space to living bedroom, bathroom & family room per plans. relace vinyl windows with marvin wood windows, install new gas fireplace | $65,000 |
| Aug 27, 2013 | Never finaled issued Sep 2014, no final | 25 Dolores St | Build Group Inc. | separate building & minor sidewalk encroachment permits for encroachment on sidewalk. in the event, the encroachment is not approved, the entrances will be re-designed. (ref approved pa# 2012/05/18/0774). n/a for maher ordinance.Details
separate building & minor sidewalk encroachment permits for encroachment on sidewalk. in the event, the encroachment is not approved, the entrances will be re-designed. (ref approved pa# 2012/05/18/0774). n/a for maher ordinance. | |
| Jul 1, 2013 | Never finaled issued Jul 2013, no final | 234 Front St | comply with health dept requirements. provide a partition to show clear delinination between the food prep area and refuse area, transition floor to wall, provide 3 compartment sink, food prep sink, handwash sinkDetails
comply with health dept requirements. provide a partition to show clear delinination between the food prep area and refuse area, transition floor to wall, provide 3 compartment sink, food prep sink, handwash sink | $10,000 | |
| Jun 14, 2013 | Completed final sign-off Feb 2019 | 1255 Columbus Av | Pacific General Construction | to erect 4 stories, one basement, 20 units apartment with commercial and parking building.Details
to erect 4 stories, one basement, 20 units apartment with commercial and parking building. | $8,500,000 |
| Feb 27, 2013 | Completed final sign-off Sep 2013 | 1370 Harrison St | tenant improvement including 1 new kitchenette, 4 new bathrooms (2 accessible) & new windows to match (e). no fabrication work in the workshop.Details
tenant improvement including 1 new kitchenette, 4 new bathrooms (2 accessible) & new windows to match (e). no fabrication work in the workshop. | $95,000 | |
| Feb 13, 2013 | Expired or cancelled expired Feb 2026 | 603 07th St | Sausalito Construction Inc. | to demolish 1 story restaurant & auto service building.Details
to demolish 1 story restaurant & auto service building. | $7,500 |
| Aug 15, 2012 | Expired or cancelled cancelled Oct 2015 | 401 03rd St | construct (n) egress corridor at street level garage @ southern corner of 401 -3rd st/ 88 perry st. not visible from street. this is the extension of the (e) exit enclosure per pre-app meeting for 671 harrison st., appl. #2011-12-14-0639.Details
construct (n) egress corridor at street level garage @ southern corner of 401 -3rd st/ 88 perry st. not visible from street. this is the extension of the (e) exit enclosure per pre-app meeting for 671 harrison st., appl. #2011-12-14-0639. | $5,000 | |
| Jul 26, 2012 | Never finaled issued Dec 2013, no final | 234 Front St | Build Group Inc. | new storefront remodel, new windows, demo portions of mezzanine, accessibility upgrades at existing restrooms. construct second means of egress. fire alarm under separate permit.Details
new storefront remodel, new windows, demo portions of mezzanine, accessibility upgrades at existing restrooms. construct second means of egress. fire alarm under separate permit. | $50,000 |
| May 18, 2012 | Completed final sign-off Jul 2013 | 25 Dolores St | Granite Excavation & Demolition Inc | to demolish 1 story warehouse building.Details
to demolish 1 story warehouse building. | $300,000 |
| May 18, 2012 | Never finaled issued Dec 2012, no final | 25 Dolores St | Axis Construction, Build Group Inc. | erect four story 37 units apartment building.Details
erect four story 37 units apartment building. | $8,500,000 |
| Dec 14, 2011 | Completed final sign-off Feb 2021 | 671 Harrison St | A M Rocca Inc. | erect 5 story office building.Details
erect 5 story office building. | $670,000 |
| May 17, 2011 | Completed final sign-off Mar 2012 | 234 Front St | Build Group Inc. | 4th floor t.i. renovations to include new walls & new kitchenette & new restrooms. to legalize work that was never finaled under pa #200706184166.Details
4th floor t.i. renovations to include new walls & new kitchenette & new restrooms. to legalize work that was never finaled under pa #200706184166. | $180,000 |
| Apr 21, 2011 | Completed final sign-off Mar 2012 | 234 Front St | Build Group Inc. | sidewalk work, demo existing to replace structural slab and topping slab.Details
sidewalk work, demo existing to replace structural slab and topping slab. | $100,000 |
| Apr 1, 2011 | Completed final sign-off Mar 2012 | 234 Front St | Build Group Inc. | revision to app#201006245251.5 office to extg permit.Details
revision to app#201006245251.5 office to extg permit. | $1,000 |
| Mar 8, 2011 | Expired or cancelled cancelled Jul 2024 | 711 Pacific Av | voluntary addition of a new tracation elevator hoistway structure adjacent to the (e) building at the west wing courtyard @ 711 pacific ave. this is a voluntary upgrade to improve disable & senior access. only alteration is removing asection 0f guardrail for elevator connection.Details
voluntary addition of a new tracation elevator hoistway structure adjacent to the (e) building at the west wing courtyard @ 711 pacific ave. this is a voluntary upgrade to improve disable & senior access. only alteration is removing asection 0f guardrail for elevator connection. | $300,000 | |
| Feb 28, 2011 | Completed final sign-off May 2012 | 638 19th St | tenant improvement of 2 ground floor retail spaces merged into one for future within an extg residential bldg.no extg wall separation between units 2 and 3.Details
tenant improvement of 2 ground floor retail spaces merged into one for future within an extg residential bldg.no extg wall separation between units 2 and 3. | $15,000 | |
| Feb 2, 2011 | Completed final sign-off Jun 2012 | 2197 Chestnut St | Almer Corp. | (n) atm within a (n) alcove on pierce street. no interior work.Details
(n) atm within a (n) alcove on pierce street. no interior work. | $16,000 |
| Sep 24, 2010 | Completed final sign-off Nov 2010 | 330 Clementina St | T P Windows Inc Dba Sf Window Factory | replace front door (2) to north and south towers. install power door operatorsDetails
replace front door (2) to north and south towers. install power door operators | $27,000 |
| Sep 10, 2010 | Never finaled issued Dec 2010, no final | 1251 Turk St | Transworld Construction | enclosed walkay addition, elevator upgrades, exterior (n) ramp and walkways, lighting and landscaping. note: see pa #2010-0629-5562 for related work on the senior center (1111 buchanan st.) that share the same set of drawings.Details
enclosed walkay addition, elevator upgrades, exterior (n) ramp and walkways, lighting and landscaping. note: see pa #2010-0629-5562 for related work on the senior center (1111 buchanan st.) that share the same set of drawings. | $212,500 |
| Aug 5, 2010 | Completed final sign-off Dec 2011 | 895 Pacific Av | Best Roofing & Waterproofing Inc | window replacement in kind.Details
window replacement in kind. | $600,000 |
| Jun 29, 2010 | Never finaled issued Dec 2010, no final | 1111 Buchanan St | Transworld Construction | exterior paint, replace all windows/doors. (n) site access gate, exterior ramp/walkways, landscape. interior ada upgrades to (e) bathrooms, (n) accessible toilet rooms, interior renovation. see pa #2010-0910-0604 for related work on senior housing (1251 turk st.) that share same set of drwgs.Details
exterior paint, replace all windows/doors. (n) site access gate, exterior ramp/walkways, landscape. interior ada upgrades to (e) bathrooms, (n) accessible toilet rooms, interior renovation. see pa #2010-0910-0604 for related work on senior housing (1251 turk st.) that share same set of drwgs. | $1,941,237 |
| Jun 24, 2010 | Completed final sign-off Nov 2011 | 234 Front St | voluntary seismic upgrade including new steel base frames @ front & middle out of plane wall anchors will be provided as required non soud concrete wall panels. accessible restroom & kitchenettes on 2nd & 3rd floors renovated.Details
voluntary seismic upgrade including new steel base frames @ front & middle out of plane wall anchors will be provided as required non soud concrete wall panels. accessible restroom & kitchenettes on 2nd & 3rd floors renovated. | $300,000 | |
| Feb 26, 2010 | Expired or cancelled cancelled Jan 2015 | 1 South Park | Webcor Construction Lp | work @ unit# 307 only. to comply with nov# 201032244. modify three property line windows to meet requirements of ab-009, windows to be non-operable, tempered glazing, & protected with ws sprinkelrs, all work on 3rd floor. ref pa# 2004/05/19/4312. correction information on window schedule to indicateDetails
work @ unit# 307 only. to comply with nov# 201032244. modify three property line windows to meet requirements of ab-009, windows to be non-operable, tempered glazing, & protected with ws sprinkelrs, all work on 3rd floor. ref pa# 2004/05/19/4312. correction information on window schedule to indicate | $15,000 |
| Feb 26, 2010 | Completed final sign-off Jun 2011 | 1 South Park | Webcor Construction Lp | work @ unit# 407 only. to comply with nov# 201032245. modify property line windows to meet requirements of ab-009, windows to be non-operable, tempered glazing & protected with ws sprinklers. all on 4th floor.Details
work @ unit# 407 only. to comply with nov# 201032245. modify property line windows to meet requirements of ab-009, windows to be non-operable, tempered glazing & protected with ws sprinklers. all on 4th floor. | $15,000 |
| Mar 31, 2009 | Expired or cancelled withdrawn Aug 2009 | 2627 Lombard St | first floor:reconfiguration parking to add one space and add residential elevator. convert 2nd floor office to lower level of residential unit and add 3rd floor. extend 2nd floor 11'6" into rear yard. 45% rear yard to remain.Details
first floor:reconfiguration parking to add one space and add residential elevator. convert 2nd floor office to lower level of residential unit and add 3rd floor. extend 2nd floor 11'6" into rear yard. 45% rear yard to remain. | $125,000 | |
| Feb 27, 2009 | Completed final sign-off May 2010 | 200 Randolph St | Jin Construction & Elec | exterior painting, replacement of garage doors, replacement of roofing, new exit stairs.Details
exterior painting, replacement of garage doors, replacement of roofing, new exit stairs. | $200,000 |
| Feb 27, 2009 | Completed final sign-off May 2010 | 409 Head St | Jin Construction & Elec | exterior painting, garage door replacement, new roof, new exterior stairs, interior cosmetic renovations to (1) unit #32.Details
exterior painting, garage door replacement, new roof, new exterior stairs, interior cosmetic renovations to (1) unit #32. | $100,000 |
| Nov 21, 2008 | Completed final sign-off Jul 2010 | 736 Valencia St | minor facade changes; entry corner; bay window & garage entry. change to appl.#2006/0208/4114.Details
minor facade changes; entry corner; bay window & garage entry. change to appl.#2006/0208/4114. | ||
| Nov 14, 2008 | Completed final sign-off Dec 2008 | 1 South Park | Bergquist Builders | slab on grade detail for pa #200810204586, slab over entire office space area.Details
slab on grade detail for pa #200810204586, slab over entire office space area. | |
| Oct 20, 2008 | Completed final sign-off May 2009 | 1 South Park | Bergquist Builders | t.i. for approx. 3500 s.f. of office space, adding partition walls and restrooms. mechanical under separate permit.Details
t.i. for approx. 3500 s.f. of office space, adding partition walls and restrooms. mechanical under separate permit. | $95,000 |
| Nov 28, 2007 | Completed final sign-off Jun 2009 | 662 Church St | fill in two existing light wells with no neighboring windows and build out in the rear for an additional 176 sf space. interior remodle of existing kitchens and bathrooms on two floors. replace the existing brick foundation if necessary.Details
fill in two existing light wells with no neighboring windows and build out in the rear for an additional 176 sf space. interior remodle of existing kitchens and bathrooms on two floors. replace the existing brick foundation if necessary. | $300,000 | |
| May 18, 2007 | Completed final sign-off Jun 2008 | 300 Broderick St | alterations to issued site permit 200310036540s-retan duct shaft #1 re-routed to sidewall, louver above roof mech area, duct added for elevator closet at ground fl0or, elevator smoke door deleted at lower level, exit door from ground floor retail parking relocatedDetails
alterations to issued site permit 200310036540s-retan duct shaft #1 re-routed to sidewall, louver above roof mech area, duct added for elevator closet at ground fl0or, elevator smoke door deleted at lower level, exit door from ground floor retail parking relocated | ||
| Jul 14, 2006 | Completed final sign-off Jan 2015 | 870 Harrison St | Creative Assembly Inc, Crime Watch Security Sys Llc, Js Sullivan Construction Inc | to erect a new 6 story 26 dwelling units w/ commercial bldg.Details
to erect a new 6 story 26 dwelling units w/ commercial bldg. | $3,500,000 |