Michael Leavitt
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Leavitt Architecture
- Based in
- San Francisco
- On San Francisco permits
- Dec 2002 to Aug 2023
105 permits since 2000 (architect on 100 permits, authorized agent-others on 7 permits, designer on 1 permit, engineer on 1 permit): 69 completed, 1 in progress, 14 never finaled, 21 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 105.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 31, 2023 | In progress issued Oct 2023 | 572 Chestnut St | Apex America Gc Inc | limited demolition of interior partitions walls within a four unit apartment bldg. on 2nd and 3rd fl units, replacement of kitchen & bathrooms. addition of one bathroom per unit. provide new beams and posts to support (e) floor and roof framing where interior bearing walls are to be demo. voluntaryDetails
limited demolition of interior partitions walls within a four unit apartment bldg. on 2nd and 3rd fl units, replacement of kitchen & bathrooms. addition of one bathroom per unit. provide new beams and posts to support (e) floor and roof framing where interior bearing walls are to be demo. voluntary | $150,000 |
| Jun 2, 2023 | Completed final sign-off Jan 2024 | 40 Alta St | repair of wood decks at 5th & 6th level & replacement in-kind of deteriorated guardrail & replacement of wood decking boards.Details
repair of wood decks at 5th & 6th level & replacement in-kind of deteriorated guardrail & replacement of wood decking boards. | $10,000 | |
| Feb 9, 2023 | Completed final sign-off Mar 2023 | 1263 Clay St | The Toboni Group | revision to adu pa 2022-0322-0541 - upgrade to (e) wall to create 1 hr rated assembly approx 26" in length; addition of new 1 hr parapet wall 30" in ht along same wall at roof level; work to be performed to create code copliant fire separation based on new property line resulting from proposed newDetails
revision to adu pa 2022-0322-0541 - upgrade to (e) wall to create 1 hr rated assembly approx 26" in length; addition of new 1 hr parapet wall 30" in ht along same wall at roof level; work to be performed to create code copliant fire separation based on new property line resulting from proposed new | $8,500 |
| Dec 28, 2022 | Completed final sign-off Mar 2023 | 1263 Clay St | The Toboni Group | revision to 202203220541, close up e accessory windows per dbi pacel map condition of approvalDetails
revision to 202203220541, close up e accessory windows per dbi pacel map condition of approval | |
| Dec 9, 2022 | Never finaled filed Dec 2022, never issued | 5250 03rd St | The Toboni Group | erect a 7-story, type 3a over 1a, mixed use building with 100 residential units.Details
erect a 7-story, type 3a over 1a, mixed use building with 100 residential units. | $12,500,000 |
| Jun 14, 2022 | Never finaled issued Jun 2022, no final | 40 Alta St | unit 5: limited demo and construction of interior partition walls. replacement of kitchen cabinets and bathroom fixtures.Details
unit 5: limited demo and construction of interior partition walls. replacement of kitchen cabinets and bathroom fixtures. | $25,000 | |
| Jun 14, 2022 | Never finaled issued Jun 2022, no final | 50 Alta St | unit 3 - 3rd fl: limited demo and construction of interior partition walls. replacement of kitchen cabinets and bathroom fixtures.Details
unit 3 - 3rd fl: limited demo and construction of interior partition walls. replacement of kitchen cabinets and bathroom fixtures. | $25,000 | |
| Jun 14, 2022 | Completed final sign-off Aug 2023 | 40 Alta St | unit 3 - 3rd fl: limited demo and construction of interior partition walls. replacement of kitchen cabinets and bathroom fixtures.Details
unit 3 - 3rd fl: limited demo and construction of interior partition walls. replacement of kitchen cabinets and bathroom fixtures. | $25,000 | |
| May 6, 2022 | Completed final sign-off Nov 2022 | 1610 Union St | comply with the acessible business entrance program. ordinance 51-16: 1606 & 1610: install new handrail & replace (e) handrail at entry stair. replace (e) door handles at entry doors with ada compliant level type handles. access business entry request for technical infesibility.Details
comply with the acessible business entrance program. ordinance 51-16: 1606 & 1610: install new handrail & replace (e) handrail at entry stair. replace (e) door handles at entry doors with ada compliant level type handles. access business entry request for technical infesibility. | $3,000 | |
| Apr 19, 2022 | Completed final sign-off Jun 2022 | 1610 Union St | Apex America Gc Inc | minor interior modifications. renovation of 2 restrooms, one to be made accessible.Details
minor interior modifications. renovation of 2 restrooms, one to be made accessible. | $27,000 |
| Mar 28, 2022 | Completed final sign-off Nov 2022 | 573 Lombard St | Apex America Gc Inc | limited demo of non structural. interior partition walls, replacement of kitchen and bath casework and fixtures.Details
limited demo of non structural. interior partition walls, replacement of kitchen and bath casework and fixtures. | $15,000 |
| Mar 22, 2022 | Completed final sign-off Mar 2023 | 1263 Clay St | The Toboni Group | addition of one adu unit at the ground floor under the state adu program.Details
addition of one adu unit at the ground floor under the state adu program. | $140,000 |
| Oct 14, 2021 | Completed final sign-off Mar 2022 | 50 Alta St | installation of a painted steel gate at the building entrywayDetails
installation of a painted steel gate at the building entryway | $2,000 | |
| Oct 14, 2021 | Completed final sign-off Aug 2023 | 40 Alta St | #1. limited demolition and construction of interior partition walls, replacement of existing kitchen and bathroom fixturesDetails
#1. limited demolition and construction of interior partition walls, replacement of existing kitchen and bathroom fixtures | $20,000 | |
| Oct 14, 2021 | Completed final sign-off Mar 2022 | 40 Alta St | installation of a painted steel gate at the bldg entryway.Details
installation of a painted steel gate at the bldg entryway. | $2,000 | |
| Oct 13, 2021 | Completed final sign-off Jan 2024 | 50 Alta St | unit #1: limited demolition & construction of interior partition walls, replacement of existing kitchen & bathroom fixtures.Details
unit #1: limited demolition & construction of interior partition walls, replacement of existing kitchen & bathroom fixtures. | $20,000 | |
| Oct 5, 2021 | Completed final sign-off Mar 2023 | 1263 Clay St | structural work only: replacement of existing perimeter foundation. no changes to interior layout or exterior building envelope.Details
structural work only: replacement of existing perimeter foundation. no changes to interior layout or exterior building envelope. | $50,000 | |
| Sep 20, 2021 | Completed final sign-off Nov 2022 | 1439 Leavenworth St | Apex America Gc Inc | unit #1 & #2:remodel of 2 residential units on the 2nd floor to include, remodeled kitchen and bath, the addition of on new bath in each of the units.Details
unit #1 & #2:remodel of 2 residential units on the 2nd floor to include, remodeled kitchen and bath, the addition of on new bath in each of the units. | $50,000 |
| Jul 20, 2021 | Never finaled issued Jul 2021, no final | 600 South Van Ness Av | The Toboni Group | administrative permit to amend the approved, issued & completed permit pa# 2014-01-13-6108 to comply with affordable housing requirements through payment of an in-lieu fee instead of providing on-site bmr units.Details
administrative permit to amend the approved, issued & completed permit pa# 2014-01-13-6108 to comply with affordable housing requirements through payment of an in-lieu fee instead of providing on-site bmr units. | |
| Jun 24, 2021 | Completed final sign-off Apr 2023 | 1439 Leavenworth St | Miann Builder, Apex America Gc Inc | to comply w/ nov 202060101: interior renovation of a single ground floor unit to include relocation of several partition walls, kitchen cabinet replacement, one new bathrom.Details
to comply w/ nov 202060101: interior renovation of a single ground floor unit to include relocation of several partition walls, kitchen cabinet replacement, one new bathrom. | $40,000 |
| May 19, 2021 | Completed final sign-off Aug 2023 | 50 Alta St | Miann Builder, Apex America Gc Inc | apt #6: limited demolition of interior partition walls. kitchen and bathrooms replacement & limited construction of new interior partition walls. no exterior workDetails
apt #6: limited demolition of interior partition walls. kitchen and bathrooms replacement & limited construction of new interior partition walls. no exterior work | $20,000 |
| Apr 26, 2021 | Expired or cancelled cancelled Feb 2025 | 3595 Mission St | to erect 4 story, r3, type va, 2 residential dwelling over garage. 0 basement.Details
to erect 4 story, r3, type va, 2 residential dwelling over garage. 0 basement. | $1,221,600 | |
| Apr 26, 2021 | Expired or cancelled cancelled Feb 2025 | 3595 Mission St | renovation of existing structure to include dig out of ground level storage area to create habitable space, addition of a dormer and skylights at attic level to create habitable space.Details
renovation of existing structure to include dig out of ground level storage area to create habitable space, addition of a dormer and skylights at attic level to create habitable space. | $175,000 | |
| Mar 4, 2021 | Completed final sign-off Jul 2021 | 606 Capp St | The Toboni Group | to comply with planning volation # 2019-006274enf dated 10/2/20. reconfiguration of bicycle parking in (e) structure. removal of hardscape in front yard setback. reconfigure (e) fence at capp st.Details
to comply with planning volation # 2019-006274enf dated 10/2/20. reconfiguration of bicycle parking in (e) structure. removal of hardscape in front yard setback. reconfigure (e) fence at capp st. | $5,000 |
| Feb 4, 2021 | Completed final sign-off May 2021 | 2290 03rd St | The Toboni Group | administrative permit to correct the record for the legal number of dwelling units from 71 to 73 dwelling units for pa# 2013-09-25-7711. all addenda were issued with the correct number of 73 dwelling units. no work is required or proposed. this is a permit to correct the record only. * maher: n/a *Details
administrative permit to correct the record for the legal number of dwelling units from 71 to 73 dwelling units for pa# 2013-09-25-7711. all addenda were issued with the correct number of 73 dwelling units. no work is required or proposed. this is a permit to correct the record only. * maher: n/a * | |
| Jan 29, 2021 | Completed final sign-off Sep 2026 | 3945 Judah St | Quinlan Construction | demolition of a former auto repair stationDetails
demolition of a former auto repair station | $25,000 |
| Sep 16, 2020 | Completed final sign-off Jan 2026 | 2100 Mission St | to demolish 1 story retail building.Details
to demolish 1 story retail building. | $15,500 | |
| Jul 15, 2020 | Never finaled issued Dec 2020, no final | 2290 03rd St | The Toboni Group | revision to pa# 201309257711-s3 (arch / mep), as requested by sffd. ** maher: n/a**Details
revision to pa# 201309257711-s3 (arch / mep), as requested by sffd. ** maher: n/a** | |
| Dec 6, 2019 | Completed final sign-off Jun 2020 | 218 27th Av | The Toboni Group | revision to pa# 2016-08705-1548 s2: installation of metal security gate at ground levelDetails
revision to pa# 2016-08705-1548 s2: installation of metal security gate at ground level | $1,500 |
| Jul 25, 2019 | Expired or cancelled withdrawn Apr 2023 | 50 Alta St | Miann Builder | remodel of entry lobby & repair of decks at the 5th & 6th floors including new access stairs. work to be done in conjunction with work under app #2018-1113-5616 & #2018-0924-1235.Details
remodel of entry lobby & repair of decks at the 5th & 6th floors including new access stairs. work to be done in conjunction with work under app #2018-1113-5616 & #2018-0924-1235. | $150,000 |
| Jul 25, 2019 | Expired or cancelled withdrawn Apr 2023 | 40 Alta St | Miann Builder | remodel of entry lobby & 5th floor unit & repair of decks at the 5th & 6th floors including new access stairs. work to be done in conjunction with work under app #2018-1113-5611.Details
remodel of entry lobby & 5th floor unit & repair of decks at the 5th & 6th floors including new access stairs. work to be done in conjunction with work under app #2018-1113-5611. | $175,000 |
| Jul 11, 2019 | Never finaled issued Jul 2019, no final | 1439 Leavenworth St | Miann Builder | remodel of 4 residential units on 3rd and 4th floors to include new kitchen and baths. replacement of single pane windows.Details
remodel of 4 residential units on 3rd and 4th floors to include new kitchen and baths. replacement of single pane windows. | $120,000 |
| Mar 25, 2019 | Completed final sign-off Dec 2020 | 2290 03rd St | The Toboni Group | stormwater drain per sfpuc for plumbing inspection division plan check only. **maher n/a**Details
stormwater drain per sfpuc for plumbing inspection division plan check only. **maher n/a** | |
| Dec 7, 2018 | Never finaled issued Jan 2019, no final | 606 Capp St | The Toboni Group | storm water drain per sfpuc. ref 2016-06-29-1227 s/r3. for plumbing inspection division plan check only.Details
storm water drain per sfpuc. ref 2016-06-29-1227 s/r3. for plumbing inspection division plan check only. | |
| Nov 13, 2018 | Expired or cancelled cancelled May 2020 | 40 Alta St | Miann Builder | removal & replacement in kind of (e) stairway, up/down direction reversed & door landing width increased by 10"Details
removal & replacement in kind of (e) stairway, up/down direction reversed & door landing width increased by 10" | $12,000 |
| Nov 13, 2018 | Expired or cancelled cancelled May 2020 | 50 Alta St | Miann Builder | removal & replacement in kind of (e) stairway, up/down direction reversed & door landing width increased by 10"Details
removal & replacement in kind of (e) stairway, up/down direction reversed & door landing width increased by 10" | $12,000 |
| Sep 17, 2018 | Completed final sign-off Mar 2023 | 1263 Clay St | The Toboni Group | to demolish a type v, 1-story, detached garage.Details
to demolish a type v, 1-story, detached garage. | $7,000 |
| Sep 17, 2018 | Completed final sign-off Mar 2023 | 1259 Clay St | Cullinane Plastering, The Toboni Group, R Lowy Fire Protection Inc | to erect a type v-a, 4-story two family residence- no basement levels.Details
to erect a type v-a, 4-story two family residence- no basement levels. | $900,000 |
| Aug 15, 2018 | Expired or cancelled cancelled Nov 2018 | 40 Alta St | Miann Builder | removal and replacement in kind of (e) stairway up/dn direction reversed & door landing width increased by 10" note: the onle building egress stairway will be removed for construction. no occupants will be in building.Details
removal and replacement in kind of (e) stairway up/dn direction reversed & door landing width increased by 10" note: the onle building egress stairway will be removed for construction. no occupants will be in building. | $12,000 |
| Aug 15, 2018 | Expired or cancelled cancelled Nov 2018 | 50 Alta St | Miann Builder | removal and replacement in kind of (e) stairway up/dn direction reversed & door landing width increased by 10" note: the only building egress stairway will be removed for construction. no occupants will be in building.Details
removal and replacement in kind of (e) stairway up/dn direction reversed & door landing width increased by 10" note: the only building egress stairway will be removed for construction. no occupants will be in building. | $12,000 |
| Aug 9, 2018 | Completed final sign-off Jun 2019 | 526 Valley St | Keegan Contruction Inc. | remove and replace in kind existing stucco finish and/or vener brick to repair dry rotted supporting sheating. molding vener as required at the south building facade.Details
remove and replace in kind existing stucco finish and/or vener brick to repair dry rotted supporting sheating. molding vener as required at the south building facade. | $8,000 |
| Jul 24, 2018 | Completed final sign-off Mar 2022 | 40 Alta St | Yuco Electrical | limited demolition of interior walls, new bath and remodeled kitchen within a single dwelling unitDetails
limited demolition of interior walls, new bath and remodeled kitchen within a single dwelling unit | $20,000 |
| May 31, 2018 | Never finaled issued Jun 2018, no final | 1463 Lombard St | The Toboni Group | revision to pa 2014-0422-3881 to indicate location of fire alarm panel & access door to elevator shaftDetails
revision to pa 2014-0422-3881 to indicate location of fire alarm panel & access door to elevator shaft | |
| May 15, 2018 | Completed final sign-off Jun 2022 | 793 South Van Ness Av | The Toboni Group | to erect 7 stories, no basement, type iii-a over i-a, 75 units residential, retail & parking. (r-2, a, m, s-1, s-2) ** maher: n/a **Details
to erect 7 stories, no basement, type iii-a over i-a, 75 units residential, retail & parking. (r-2, a, m, s-1, s-2) ** maher: n/a ** | $18,500,000 |
| Mar 8, 2018 | Completed final sign-off Apr 2019 | 606 Capp St | The Toboni Group | partial removal and repair of existing asphalt parking lot, 60x90Details
partial removal and repair of existing asphalt parking lot, 60x90 | $5,000 |
| Jun 15, 2017 | Never finaled issued Apr 2022, no final | 1463 Lombard St | The Toboni Group | as built plumbing plans for approval of storm water control plan. no work to be performed.Details
as built plumbing plans for approval of storm water control plan. no work to be performed. | |
| Jun 1, 2017 | Never finaled issued Apr 2022, no final | 600 South Van Ness Av | The Toboni Group | for final stormwater control plan sign off - no work to be performed.Details
for final stormwater control plan sign off - no work to be performed. | |
| Sep 2, 2016 | Completed final sign-off Aug 2017 | 896 De Haro St | Keegan Contruction Inc. | revision to 201204249018(s2), equivalency per ab-005 to allow a metal frame non-rated window in lieu of the 45 min. approved window #29; with the use of ordinary temperature, quick response sprinklers.Details
revision to 201204249018(s2), equivalency per ab-005 to allow a metal frame non-rated window in lieu of the 45 min. approved window #29; with the use of ordinary temperature, quick response sprinklers. | |
| Aug 30, 2016 | Completed final sign-off Aug 2017 | 896 De Haro St | revision to pa #201204249018-s2: equivalency per ab-057 to allow discontinuos handrail at roof hatch.Details
revision to pa #201204249018-s2: equivalency per ab-057 to allow discontinuos handrail at roof hatch. | ||
| Jul 5, 2016 | Completed final sign-off Jul 2020 | 218 27th Av | The Toboni Group | to erect 4 stories, 3 units residential building as approved per 2016-003258cua/pc motion 20025 / nsr 2018k588112.Details
to erect 4 stories, 3 units residential building as approved per 2016-003258cua/pc motion 20025 / nsr 2018k588112. | $1,400,000 |
| Jul 5, 2016 | Completed final sign-off Jul 2020 | 218 27th Av | The Toboni Group | to demolish 2 story single family dwelling.Details
to demolish 2 story single family dwelling. | $15,000 |
| Jun 29, 2016 | Completed final sign-off Apr 2019 | 606 Capp St | The Toboni Group, R Lowy Fire Protection Inc | to erect 4 stories, no basement, type iii-a, 20 units residential apartment.Details
to erect 4 stories, no basement, type iii-a, 20 units residential apartment. | $2,800,000 |
| May 26, 2016 | Expired or cancelled cancelled Nov 2024 | 817 Carolina St | vertical & horizontal addition. to create 3rd floor, horizontal extension at rear. dig out of basement for living space & garage. redesign of building facade.Details
vertical & horizontal addition. to create 3rd floor, horizontal extension at rear. dig out of basement for living space & garage. redesign of building facade. | $280,000 | |
| Apr 1, 2016 | Expired or cancelled cancelled Jan 2017 | 2355 Scott St | boa# 15-095 per issued site pa# 2012/06/22/3267-s. (horizontal addition, partial lightwell infill, interior modifications to (e) 12 units, roof monitor addition along front building elevation. per boa# 15-095, scope of work reduced to elimate subterranean gargage & ground floor residential.)Details
boa# 15-095 per issued site pa# 2012/06/22/3267-s. (horizontal addition, partial lightwell infill, interior modifications to (e) 12 units, roof monitor addition along front building elevation. per boa# 15-095, scope of work reduced to elimate subterranean gargage & ground floor residential.) | ||
| Oct 28, 2015 | Expired or cancelled cancelled Feb 2025 | 1228 25th St | to erect 5 stories, no basement, for commercial bldg,type 2 construction. ** maher: compliance with ordinance no# 155-13 not required **Details
to erect 5 stories, no basement, for commercial bldg,type 2 construction. ** maher: compliance with ordinance no# 155-13 not required ** | $2,500,000 | |
| Sep 28, 2015 | Completed final sign-off Jul 2018 | 1463 Lombard St | The Toboni Group | demolish 3 stories of 2 dwelling unit.Details
demolish 3 stories of 2 dwelling unit. | $20,000 |
| Jul 17, 2015 | Expired or cancelled withdrawn Jan 2020 | 2092 03rd St | demolish 2-story, office/restaurant building.Details
demolish 2-story, office/restaurant building. | $65,000 | |
| Jul 17, 2015 | Expired or cancelled withdrawn Jan 2020 | 2092 03rd St | construct (n) 6-story, 19 dwelling unts residential above retail with 1 basement building.Details
construct (n) 6-story, 19 dwelling unts residential above retail with 1 basement building. | $5,500,000 | |
| Dec 31, 2014 | Completed final sign-off Sep 2026 | 3945 Judah St | Quinlan Construction | to erect 5 stories, 1 basement, 20 units residential with commercial building.Details
to erect 5 stories, 1 basement, 20 units residential with commercial building. | $1,500,000 |
| Aug 25, 2014 | Completed final sign-off Aug 2014 | 1275 Indiana St | R Group, Inc | revision to app#200212244171 s3 r-1. reconfigure units 403,404,405, and 406 on the 5th floor.Details
revision to app#200212244171 s3 r-1. reconfigure units 403,404,405, and 406 on the 5th floor. | |
| Jul 29, 2014 | Completed final sign-off Aug 2014 | 1839 Stockton St | revision to app#201402188771 and 200302197737. replace study with bathroom off of bedroom #2. relocate door on 3rd floor and reconfigure powder room and kitchen layout and change heater location.Details
revision to app#201402188771 and 200302197737. replace study with bathroom off of bedroom #2. relocate door on 3rd floor and reconfigure powder room and kitchen layout and change heater location. | ||
| Jun 23, 2014 | Completed final sign-off Mar 2025 | 2100 Mission St | Rf Fire Alarm Llc, The Toboni Group | to erect 6 stories, no basement, type i-a / iii-a, 28 units residential, ground floor commercial building.Details
to erect 6 stories, no basement, type i-a / iii-a, 28 units residential, ground floor commercial building. | $7,500,000 |
| Jun 16, 2014 | Never finaled issued Dec 2015, no final | 600 South Van Ness Av | The Toboni Group | to demolish 1 story auto repair building.Details
to demolish 1 story auto repair building. | $10,000 |
| Jun 2, 2014 | Completed final sign-off Aug 2014 | 1275 Indiana St | R Group, Inc | evacuation maps for new building-10 total, 4 floors, ref app #2002.1224.4171. compliance with ordinance 155-13 not requiredDetails
evacuation maps for new building-10 total, 4 floors, ref app #2002.1224.4171. compliance with ordinance 155-13 not required | $5,000 |
| Apr 22, 2014 | Completed final sign-off Jul 2018 | 1463 Lombard St | The Toboni Group, R Lowy Fire Protection Inc | to erect 4 stories 14 dwelling units type iiia .Details
to erect 4 stories 14 dwelling units type iiia . | $2,100,000 |
| Feb 19, 2014 | Completed final sign-off Jul 2014 | 740 Bay St | Doherty Construction | revision to 2012-05-14-0388. add seating, counter top, movable planters & furniture at roof deck. add small bump out above 3rd floor patio doors for water proofing and add lights. ** maher: compliance with ordinance no# 155-13 not required **Details
revision to 2012-05-14-0388. add seating, counter top, movable planters & furniture at roof deck. add small bump out above 3rd floor patio doors for water proofing and add lights. ** maher: compliance with ordinance no# 155-13 not required ** | $6,000 |
| Jan 15, 2014 | Completed final sign-off Oct 2014 | 3819 21st St | revision to approved pa#2012-12-21-6784s. change door & window on exterior. remove door & small window & replace w/ rescue window. see sheet a2.0 & a3.0. replace door and build wall with channel dropwood siding and the new windows to be wood casement. rmerove concrete steps.Details
revision to approved pa#2012-12-21-6784s. change door & window on exterior. remove door & small window & replace w/ rescue window. see sheet a2.0 & a3.0. replace door and build wall with channel dropwood siding and the new windows to be wood casement. rmerove concrete steps. | $5,000 | |
| Jan 13, 2014 | Completed final sign-off Jul 2017 | 600 South Van Ness Av | The Toboni Group | to erect 5 stories of 27 dwellings/2 commercials and 19 parkingsDetails
to erect 5 stories of 27 dwellings/2 commercials and 19 parkings | $4,950,000 |
| Jul 11, 2013 | Completed final sign-off May 2017 | 1297 Dolores St | interior modifications to (e) 3rd flr residential unit and contruction of a new 4th fl addition & roof deck area to create a penthouse unit.Details
interior modifications to (e) 3rd flr residential unit and contruction of a new 4th fl addition & roof deck area to create a penthouse unit. | $100,000 | |
| Apr 2, 2013 | Completed final sign-off Apr 2015 | 4028 23rd St | move lower unit down to grd level.enlarge garage space.incorp 2nd level&attic to upper unit.chg(e)flr plan thruout the house to remain a 2 unit bldg.create 5 dormers at less than 20% of roof plan.reduce(e)legal non compliant deck approved under permit.reduce(e)fire wall.no inc ft prt of bldg facadeDetails
move lower unit down to grd level.enlarge garage space.incorp 2nd level&attic to upper unit.chg(e)flr plan thruout the house to remain a 2 unit bldg.create 5 dormers at less than 20% of roof plan.reduce(e)legal non compliant deck approved under permit.reduce(e)fire wall.no inc ft prt of bldg facade | $180,000 | |
| Feb 7, 2013 | Completed final sign-off Jun 2019 | 526 Valley St | Keegan Contruction Inc., Ace Drilling & Excavation | renovation & addition to existing single family residence incl vertical addition to create a 3rd living level & horizontal extension at the rear. nfpa 13r sprinkler system throughout entire building to be provided under separate permit.Details
renovation & addition to existing single family residence incl vertical addition to create a 3rd living level & horizontal extension at the rear. nfpa 13r sprinkler system throughout entire building to be provided under separate permit. | $300,000 |
| Dec 21, 2012 | Completed final sign-off Oct 2014 | 3819 21st St | Achill Beg Construction Inc, Keegan Contruction Inc. | renovation of and addition to exist. 3 story s.f.r. dwelling to include rear addition of 8'4" beyond exist. rear bldg, wall, with an additional a single story, 12 ft. by 25 sf attached structure at the rear, extending 12'0" beyond the 55% lot coverage set back line per planning sec. 136Details
renovation of and addition to exist. 3 story s.f.r. dwelling to include rear addition of 8'4" beyond exist. rear bldg, wall, with an additional a single story, 12 ft. by 25 sf attached structure at the rear, extending 12'0" beyond the 55% lot coverage set back line per planning sec. 136 | $300,000 |
| Jun 26, 2012 | Expired or cancelled cancelled May 2015 | 2055 Hyde St | Tn Building | interior renovations of 2 units, build out of ground floor storage area as master bedroom suite, roof deck addition, not to exceed 4ft above (e) roofDetails
interior renovations of 2 units, build out of ground floor storage area as master bedroom suite, roof deck addition, not to exceed 4ft above (e) roof | $125,000 |
| Jun 22, 2012 | Expired or cancelled cancelled Jan 2017 | 2355 Scott St | interior modifications to (e) 12 units. addition of subterranean parking garage. conversion of (e) garage area to residential usage. 4'-6" horizontal addition at front building elevation. 3'-0" high roof monitor addition along front building elevation.Details
interior modifications to (e) 12 units. addition of subterranean parking garage. conversion of (e) garage area to residential usage. 4'-6" horizontal addition at front building elevation. 3'-0" high roof monitor addition along front building elevation. | $400,000 | |
| May 14, 2012 | Completed final sign-off Jul 2014 | 740 Bay St | Doherty Construction | renovate exist 2 story bldg. addition of 3rd story above exist 2nd story. creation of a flat roof area 1' above exist. ridge line towards rear of bldg. additon of a 2nd story, 13'x15' attached structure at rear.Details
renovate exist 2 story bldg. addition of 3rd story above exist 2nd story. creation of a flat roof area 1' above exist. ridge line towards rear of bldg. additon of a 2nd story, 13'x15' attached structure at rear. | $330,000 |
| Apr 24, 2012 | Completed final sign-off Aug 2017 | 896 De Haro St | Keegan Contruction Inc. | erect 3 stories, type 5, 2 dwelling units building.Details
erect 3 stories, type 5, 2 dwelling units building. | $700,000 |
| Mar 2, 2011 | Never finaled issued Mar 2011, no final | 970 Valencia St | exterior alteration to storefront facade per planning. new door, no sidewalk work.Details
exterior alteration to storefront facade per planning. new door, no sidewalk work. | $2,000 | |
| Dec 17, 2010 | Completed final sign-off Mar 2011 | 915 Battery St | Malpas And Birmingham Inc | 2nd floor - t.i. incl partial demo of non-structural partitions & construction of new non-sturctural partitions. remove & replace existlighting fixtures. modifications to exist non-accessible toilet room to comply w/cbc accessibility requirements.Details
2nd floor - t.i. incl partial demo of non-structural partitions & construction of new non-sturctural partitions. remove & replace existlighting fixtures. modifications to exist non-accessible toilet room to comply w/cbc accessibility requirements. | $50,000 |
| Oct 15, 2010 | Completed final sign-off May 2011 | 1740 17th St | O'keeffe Construction Inc | re-use of existing dining area to accomodate men's dressing area & women's dressing area. installation of suspended gypsum board celling above existing office area. use of area to reain the same, electrical, mechanical & sprinklers shall be under separate permit.Details
re-use of existing dining area to accomodate men's dressing area & women's dressing area. installation of suspended gypsum board celling above existing office area. use of area to reain the same, electrical, mechanical & sprinklers shall be under separate permit. | $20,000 |
| Sep 29, 2010 | Completed final sign-off Jul 2011 | 83 Grattan St | Lau Man Construction | kitchen renovation to include new cabinets and counters. intallation of new gas wall furnace.Details
kitchen renovation to include new cabinets and counters. intallation of new gas wall furnace. | $7,500 |
| Sep 17, 2010 | Completed final sign-off Oct 2022 | 15 Mountain Spring Av | R Group, Inc | demolish 1 story, 1 unit bldg on 2 lots.Details
demolish 1 story, 1 unit bldg on 2 lots. | $10,000 |
| Sep 17, 2010 | Expired or cancelled expired Nov 2022 | 21 Mountain Spring Av | R Group, Inc | erect 3 stories, 1 basement, 1 unit building.Details
erect 3 stories, 1 basement, 1 unit building. | $600,000 |
| Apr 13, 2010 | Completed final sign-off Jun 2011 | 665 Myra Wy | Hubert Penny | remove non-bearing wall at upper floor, reconstruct of (e) stairs, new partial slab at ground floor & build in new bathroom, office & playroom at (e) storage space.Details
remove non-bearing wall at upper floor, reconstruct of (e) stairs, new partial slab at ground floor & build in new bathroom, office & playroom at (e) storage space. | $45,000 |
| Dec 16, 2009 | Completed final sign-off May 2014 | 1430 Larkin St | comply with nov# 200902304, dated 4-16-09-remove (e) plumbing fixtures, non bearing wall at (e) bathroom #2 on ground level unit. add new stall shower in lieu of bathroom & change occupancy from commercial office (b) to residential hotel (r1). check for total of 22 guest roomsDetails
comply with nov# 200902304, dated 4-16-09-remove (e) plumbing fixtures, non bearing wall at (e) bathroom #2 on ground level unit. add new stall shower in lieu of bathroom & change occupancy from commercial office (b) to residential hotel (r1). check for total of 22 guest rooms | $1,000 | |
| Nov 4, 2009 | Completed final sign-off Jan 2011 | 1740 17th St | O'keeffe Construction Inc | revision to appl #200810083721-r1: revision to 2nd floor skylight opening to locker room area. increase kitchen area & add janitor room @ 1st floor, no exterior changes.Details
revision to appl #200810083721-r1: revision to 2nd floor skylight opening to locker room area. increase kitchen area & add janitor room @ 1st floor, no exterior changes. | $1,000 |
| Jun 23, 2009 | Completed final sign-off Mar 2010 | 286 Holladay Av | R Group, Inc | interior remodel & lateral stiffening (voluntary). bathroom & kitchen remodel @ 2nd & 3rd floors. new bathroom & bedroom @ ground floor. new staircase. new bathroom @ 3rd floor. new powder room @ 2nd floor.Details
interior remodel & lateral stiffening (voluntary). bathroom & kitchen remodel @ 2nd & 3rd floors. new bathroom & bedroom @ ground floor. new staircase. new bathroom @ 3rd floor. new powder room @ 2nd floor. | $138,000 |
| May 12, 2009 | Completed final sign-off May 2011 | 1740 17th St | O'keeffe Construction Inc | new concrete pad and new non epss generator to be installed in exterior location at east side of building (500 kw generator)Details
new concrete pad and new non epss generator to be installed in exterior location at east side of building (500 kw generator) | $2,500 |
| Jan 8, 2009 | Completed final sign-off Oct 2010 | 21 Fountain St | R Group, Inc | interior remodel-new 7'6" horizonal addition at 3rd floor rear area. replacement of pitched roof with flat roof to match ridge line of (e) roof, facade modifications.Details
interior remodel-new 7'6" horizonal addition at 3rd floor rear area. replacement of pitched roof with flat roof to match ridge line of (e) roof, facade modifications. | $75,000 |
| Dec 29, 2008 | Completed final sign-off Nov 2010 | 829 Corbett Av | Martin Tynan & Son Construction | demolition of existing single family resident.Details
demolition of existing single family resident. | $10,000 |
| Dec 29, 2008 | Completed final sign-off Jun 2011 | 829 Corbett Av | Martin Tynan & Son Construction | erect 5 stories of 4 dwelling units apartments.Details
erect 5 stories of 4 dwelling units apartments. | $1,250,000 |
| Oct 8, 2008 | Completed final sign-off Jun 2009 | 1740 17th St | tenant improvement of existing 2 story bldg and addition of 2nd floor mezz area at 17th side as indicated.change use from retail to office,storage. mep under seperate permit.Details
tenant improvement of existing 2 story bldg and addition of 2nd floor mezz area at 17th side as indicated.change use from retail to office,storage. mep under seperate permit. | $1,868,000 | |
| Oct 9, 2007 | Completed final sign-off Aug 2011 | 850 Bush St | umb strengthening to include steel moment frame within building enclosure. accessibility upgrade to add auto door opener at front entrance. no change to building exterior.Details
umb strengthening to include steel moment frame within building enclosure. accessibility upgrade to add auto door opener at front entrance. no change to building exterior. | $35,340 | |
| Jul 14, 2006 | Completed final sign-off Jan 2015 | 870 Harrison St | Creative Assembly Inc, Crime Watch Security Sys Llc, Js Sullivan Construction Inc | to erect a new 6 story 26 dwelling units w/ commercial bldg.Details
to erect a new 6 story 26 dwelling units w/ commercial bldg. | $3,500,000 |
| Feb 10, 2006 | Expired or cancelled cancelled Nov 2022 | 793 South Van Ness Av | to demolish 1 story gas station.Details
to demolish 1 story gas station. | $22,000 | |
| Feb 2, 2006 | Completed final sign-off Aug 2017 | 570 Jessie St | Transatlantic Construction Company | to demolish 2 story office/warehouseDetails
to demolish 2 story office/warehouse | $35,000 |
| Jan 13, 2006 | Expired or cancelled withdrawn Aug 2011 | 655 04th St | to erect 192 dwelling unit with 7 story new building/mixed useDetails
to erect 192 dwelling unit with 7 story new building/mixed use | $8,000,000 | |
| Dec 30, 2005 | Never finaled filed Dec 2005, never issued | 850 Bush St | construct 7 floors of residential use above exist. commercial bldg and reconfigure exist. ground floor to include entire lobby commercial and residentialDetails
construct 7 floors of residential use above exist. commercial bldg and reconfigure exist. ground floor to include entire lobby commercial and residential | $1,200,000 | |
| Oct 12, 2005 | Never finaled issued Jan 2009, no final | 77 Miguel St | horizontal addition, new kitchen, powder rm new/remodel stairDetails
horizontal addition, new kitchen, powder rm new/remodel stair | $20,000 | |
| Oct 6, 2005 | Completed final sign-off May 2008 | 1831 Stockton St | partition walls added at g/f of units 1831 & 1833 to create 2 bedrooms & 3 baths. opening made thru floor above each unit & connect the 2 levels with a new stair.remove partition walls on 2/f in each unit.provide new conc.perimeter foundation.Details
partition walls added at g/f of units 1831 & 1833 to create 2 bedrooms & 3 baths. opening made thru floor above each unit & connect the 2 levels with a new stair.remove partition walls on 2/f in each unit.provide new conc.perimeter foundation. | $30,000 | |
| May 24, 2005 | Expired or cancelled cancelled Dec 2011 | 251 06th St | erect 4 stories 83 dwelling unit s-r-o-retail residential bldg.Details
erect 4 stories 83 dwelling unit s-r-o-retail residential bldg. | $4,000,000 |