Block 3615, lot 055
606 Capp St
- City’s use
- Multi-Family Residential
- Built
- 2019
- Stories
- 4
- Units
- 20
- Building
- 16,500 sq ft
- Lot
- 7,350 sq ft
- Zoning
- RM1
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 4, 2021 | Completed final sign-off Jul 2021 | 606 Capp St | The Toboni Group | to comply with planning volation # 2019-006274enf dated 10/2/20. reconfiguration of bicycle parking in (e) structure. removal of hardscape in front yard setback. reconfigure (e) fence at capp st.Details
to comply with planning volation # 2019-006274enf dated 10/2/20. reconfiguration of bicycle parking in (e) structure. removal of hardscape in front yard setback. reconfigure (e) fence at capp st. | $5,000 |
| Feb 11, 2021 | Completed final sign-off Nov 2021 | 606 Capp St | as built errcs upgrade per sf radio shop "2008 errcs/das/bda requirements (v1.4)Details
as built errcs upgrade per sf radio shop "2008 errcs/das/bda requirements (v1.4) | ||
| Mar 8, 2019 | Never finaled issued Mar 2019, no final | 606 Capp St | as constructed documentation of the fire rated access panel enclosure for the elevator hoistway smoke detector. ref app#201606291227 (s)Details
as constructed documentation of the fire rated access panel enclosure for the elevator hoistway smoke detector. ref app#201606291227 (s) | ||
| Dec 7, 2018 | Never finaled issued Jan 2019, no final | 606 Capp St | The Toboni Group | storm water drain per sfpuc. ref 2016-06-29-1227 s/r3. for plumbing inspection division plan check only.Details
storm water drain per sfpuc. ref 2016-06-29-1227 s/r3. for plumbing inspection division plan check only. | |
| Jul 16, 2018 | Never finaled issued Jul 2018, no final | 606 Capp St | street spaceDetails
street space | ||
| May 24, 2018 | Completed final sign-off Apr 2019 | 606 Capp St | build new 54'2" x 6'6" planter at rear of property.Details
build new 54'2" x 6'6" planter at rear of property. | $20,000 | |
| Mar 8, 2018 | Completed final sign-off Apr 2019 | 606 Capp St | The Toboni Group | partial removal and repair of existing asphalt parking lot, 60x90Details
partial removal and repair of existing asphalt parking lot, 60x90 | $5,000 |
| Jun 29, 2016 | Completed final sign-off Apr 2019 | 606 Capp St | The Toboni Group, R Lowy Fire Protection Inc | to erect 4 stories, no basement, type iii-a, 20 units residential apartment.Details
to erect 4 stories, no basement, type iii-a, 20 units residential apartment. | $2,800,000 |
| May 23, 2013 | Completed final sign-off May 2013 | 606 Capp St | R P B Construction Inc | comply & abate nov# 200682212-parking lot was not recently repaved & per the attached engineer's letter & topo. survey, surface water does not run onto the complaintant's property at lot #313Details
comply & abate nov# 200682212-parking lot was not recently repaved & per the attached engineer's letter & topo. survey, surface water does not run onto the complaintant's property at lot #313 | |
| Dec 22, 2009 | Never finaled issued Dec 2009, no final | 606 Capp St | street space & sidewalkDetails
street space & sidewalk |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- The Toboni Group (4), R Lowy Fire Protection Inc, R P B Construction Inc
- Architects
- Michael S Leavitt (4)
- Engineers
- Donald David, Robert Wong